If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224272702000 | |
Location: 00/02-27-022-27W4/0 | |
Location Alias: 00/02-27-22-27 W4M | |
Location Alias 2: 00/02-27-022-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 27 | |
Section: 27 | |
County/Municipality: Rocky View County | |
Well Name: PERSIST OIL ENTICE 2-27-22-27 | |
Operator Name: Persist Oil And Gas Inc. | |
License Number: 0429627 | |
License Date: 2011-01-07 | |
License Status: Suspension | |
Spud Date: 2011-02-07 | |
Final Drill Date: 2011-02-12 | |
Well Total Depth: 1082.00 m | |
Surface Hole Latitude: 50.893405 | |
Surface Hole Longitude: -113.658679 |
Date | Event |
---|---|
2011-01-07 | Obtained License |
2011-02-07 | Surface Casing Operation Performed |
2011-02-12 | Finished Drilling |
2011-02-12 | Production Casing Operation Performed |
2011-02-12 | Rig Released |
2011-02-12 | Well Mode changed to Drilled and Cased |
2011-02-18 | Well Log Performed |
2011-09-24 | Perforation Treatment Performed - Jet Perforation |
2012-01-02 | Perforation Treatment Performed - Fractured |
2012-01-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-01-03 | Well Mode changed to Testing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-24 | Perforation | 221.90 | 222.40 | 13 |
2011-09-24 | Perforation | 524.60 | 525.60 | 13 |
2011-09-24 | Perforation | 530.80 | 531.30 | 13 |
2011-09-24 | Perforation | 539.50 | 540.00 | 13 |
2011-09-24 | Perforation | 545.70 | 546.20 | 13 |
2011-09-24 | Perforation | 546.20 | 547.20 | 13 |
2011-09-24 | Perforation | 551.60 | 552.10 | 13 |
2011-09-24 | Perforation | 569.80 | 570.30 | 13 |
2011-09-24 | Perforation | 582.90 | 583.40 | 13 |
2011-09-24 | Perforation | 583.60 | 584.10 | 13 |
2011-09-24 | Perforation | 585.90 | 586.40 | 13 |
2011-09-24 | Perforation | 238.50 | 239.00 | 13 |
2011-09-24 | Perforation | 596.60 | 597.60 | 13 |
2011-09-24 | Perforation | 597.70 | 599.20 | 13 |
2011-09-24 | Perforation | 603.60 | 605.10 | 13 |
2011-09-24 | Perforation | 647.90 | 648.90 | 13 |
2011-09-24 | Perforation | 662.30 | 662.80 | 13 |
2011-09-24 | Perforation | 673.20 | 674.20 | 13 |
2011-09-24 | Perforation | 677.20 | 678.20 | 13 |
2011-09-24 | Perforation | 726.50 | 727.00 | 13 |
2011-09-24 | Perforation | 746.80 | 747.80 | 13 |
2011-09-24 | Perforation | 1030.00 | 1030.50 | 13 |
2011-09-24 | Perforation | 384.00 | 384.50 | 13 |
2012-01-02 | Fracture | 221.90 | 1030.50 | 0 |
2011-09-24 | Perforation | 396.00 | 396.50 | 13 |
2011-09-24 | Perforation | 397.30 | 397.80 | 13 |
2011-09-24 | Perforation | 404.20 | 404.70 | 13 |
2011-09-24 | Perforation | 421.30 | 421.80 | 13 |
2011-09-24 | Perforation | 508.00 | 508.50 | 13 |
2011-09-24 | Perforation | 518.40 | 521.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]