If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0224273601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.907281,"lon":-113.609813,"icon":""}]} |
Location: 00/01-36-022-27W4/0 | |
Location Alias: 00/01-36-22-27 W4M | |
Location Alias 2: 00/01-36-022-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 022 | |
Meridian: 4 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 1B ENTICE 1-36-22-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0272008 | |
License Date: 2002-07-22 | |
License Status: Issued | |
Spud Date: 2002-07-24 | |
Final Drill Date: 2002-07-29 | |
Well Total Depth: 1084.00 m | |
Surface Hole Latitude: 50.907281 | |
Surface Hole Longitude: -113.609813 |
Date | Event |
---|---|
2002-07-22 | Obtained License |
2002-07-24 | Surface Casing Operation Performed |
2002-07-29 | Finished Drilling |
2002-07-29 | Well Log Performed |
2002-07-30 | Production Casing Operation Performed |
2002-07-30 | Rig Released |
2002-07-30 | Well Mode changed to Drilled and Cased |
2002-08-19 | Well Log Performed |
2002-12-06 | Perforation Treatment Performed - Jet Perforation |
2002-12-18 | Perforation Treatment Performed - Fractured |
2002-12-19 | Well Fluid changed to Gas |
2002-12-19 | Well Mode changed to Testing |
2003-01-10 | Perforation Treatment Performed - Jet Perforation |
2003-01-19 | Perforation Treatment Performed - Fractured |
2003-02-02 | Perforation Treatment Performed - Jet Perforation |
2003-02-17 | Perforation Treatment Performed - Jet Perforation |
2003-07-25 | Well Began Production |
2003-07-25 | Well Fluid changed to Gas |
2003-07-25 | Well Mode changed to Flowing |
2009-02-22 | Perforation Treatment Performed - Jet Perforation |
2009-02-26 | Perforation Treatment Performed - Fractured |
2009-03-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-12-06 | Perforation | 1006.00 | 1008.00 | 13 |
2009-02-22 | Perforation | 629.90 | 630.40 | 13 |
2009-02-22 | Perforation | 619.60 | 620.60 | 13 |
2009-02-22 | Perforation | 604.00 | 605.00 | 13 |
2009-02-22 | Perforation | 559.50 | 561.50 | 13 |
2009-02-22 | Perforation | 555.40 | 555.90 | 13 |
2009-02-22 | Perforation | 553.80 | 554.80 | 13 |
2009-02-22 | Perforation | 542.40 | 544.40 | 13 |
2009-02-22 | Perforation | 529.10 | 529.60 | 13 |
2009-02-22 | Perforation | 527.60 | 528.10 | 13 |
2009-02-22 | Perforation | 510.90 | 512.90 | 13 |
2002-12-06 | Perforation | 1000.00 | 1002.00 | 13 |
2009-02-22 | Perforation | 504.90 | 505.80 | 13 |
2009-02-22 | Perforation | 495.00 | 495.50 | 13 |
2009-02-22 | Perforation | 491.20 | 491.70 | 13 |
2009-02-22 | Perforation | 472.80 | 473.30 | 13 |
2009-02-22 | Perforation | 365.30 | 365.80 | 13 |
2009-02-22 | Perforation | 356.90 | 357.40 | 13 |
2009-02-22 | Perforation | 322.60 | 323.10 | 13 |
2009-02-26 | Fracture | 322.60 | 633.40 | 0 |
2002-12-18 | Fracture | 1000.00 | 1008.00 | 0 |
2003-01-10 | Perforation | 933.50 | 936.50 | 13 |
2003-01-19 | Fracture | 933.50 | 936.50 | 0 |
2003-02-02 | Perforation | 755.00 | 759.00 | 13 |
2003-02-02 | Perforation | 745.00 | 750.00 | 13 |
2003-02-17 | Perforation | 724.00 | 726.00 | 13 |
2009-02-22 | Perforation | 632.40 | 633.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 24 | 0.0 | 0.0 | 0.0 |
2003 | 3828 | 0.0 | 0.0 | 0.0 |
2004 | 8721 | 0.0 | 0.0 | 0.0 |
2005 | 8472 | 0.0 | 0.0 | 0.0 |
2006 | 8654 | 0.0 | 0.0 | 0.0 |
2007 | 8514 | 0.0 | 0.0 | 0.0 |
2008 | 8700 | 0.0 | 0.0 | 0.0 |
2009 | 8747 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 5685 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8722 | 0.0 | 0.0 | 0.0 |
2015 | 8745 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8733 | 0.0 | 0.0 | 0.0 |
2018 | 8693 | 0.0 | 0.0 | 0.0 |
2019 | 8716 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[5]