X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234131716020

Well Details

Well ID: 0234131716020
Loading map...
Location: 02/16-17-023-13W4/0
Location Alias: 02/16-17-23-13 W4M
Location Alias 2: 02/16-17-023-13 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 13
Section: 17
County/Municipality: Special Areas No. 2
Well Name: JOURNEY 102 HZ CESS 16-17-23-13
Operator Name: Journey Energy Inc.
License Number: 0486513
License Date: 2017-11-24
License Status: Issued
Spud Date: 2018-01-03
Final Drill Date: 2018-01-10
Well Total Depth: 2523.00 m
Surface Hole Latitude: 50.962871
Surface Hole Longitude: -111.797285

For data sources see[1][2]

Well History

Date Event
2017-11-24 Obtained License
2018-01-04 Surface Casing Operation Performed
2018-01-05 Direction Drilling Operation Performed - Deviate
2018-01-06 Direction Drilling Operation Performed - Horizontal
2018-01-06 Intermediate Casing Operation Performed
2018-01-10 Finished Drilling
2018-01-10 Well Log Performed
2018-01-10 Well Mode changed to Drilled and Cased
2018-01-11 Liner Casing Operation Performed
2018-01-12 Rig Released
2018-01-30 Well Log Performed
2018-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-01 Well Began Production
2018-02-01 Well Fluid changed to Crude Oil
2018-02-01 Well Mode changed to Flowing
2018-02-02 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-04 Lasso Drilling Corporation 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-05 786.60 Deviate (5 - 79 degrees)
2018-01-06 1073.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-01 Multi-Stage Fracture 2494.30 2494.40 0
2018-02-02 Multi-Stage Fracture 1791.60 1791.70 0
2018-02-02 Multi-Stage Fracture 1712.60 1712.70 0
2018-02-02 Multi-Stage Fracture 1633.10 1633.20 0
2018-02-02 Multi-Stage Fracture 1551.90 1552.00 0
2018-02-02 Multi-Stage Fracture 1470.70 1470.80 0
2018-02-02 Multi-Stage Fracture 1390.00 1390.10 0
2018-02-02 Multi-Stage Fracture 1309.50 1309.60 0
2018-02-02 Multi-Stage Fracture 1232.90 1233.00 0
2018-02-02 Multi-Stage Fracture 1152.70 1152.80 0
2018-02-01 Multi-Stage Fracture 2419.30 2419.40 0
2018-02-01 Multi-Stage Fracture 2340.60 2340.70 0
2018-02-01 Multi-Stage Fracture 2259.40 2259.50 0
2018-02-01 Multi-Stage Fracture 2181.90 2182.00 0
2018-02-01 Multi-Stage Fracture 2105.30 2105.40 0
2018-02-01 Multi-Stage Fracture 2025.30 2025.40 0
2018-02-01 Multi-Stage Fracture 1946.20 1946.30 0
2018-02-01 Multi-Stage Fracture 1870.70 1870.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-01 2018-02-02 985 1,649 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 21.6651 N/A
Water 7732-18-5 100 55.3847 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 22.0737 N/A
HCR - Synthetic HCL Acid Fluid Energy Group Ltd. Acid Demulsifiers Not Available 100 0.3357 N/A
Inhibitors Not Available 100 0.3357 N/A
Non Hazardous Ingredients Not Available 100 0.3358 N/A
Water 7732-18-5 100 0.3358 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0057 N/A
Methyl Alcohol 67-56-1 100 0.0057 N/A
Non-Hazardous Ingredients Not Available 100 0.0057 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.049 N/A
Sodium chloride 7647-14-5 100 0.049 N/A
SCS-8 (Clay Control) Step Energy Services Clay Control Inorganic Salt Not Available 100 0.0731 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.0856 N/A
Water 7732-18-5 100 0.0856 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.2778 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.2778 N/A
SNE-8 (Non-Emulsifier) Step Energy Services Surfactant Alkyl Aryl Sulfonic Acid Not Available 100 0.0491 N/A
Alkyl Sulfate Not Available 100 0.0491 N/A
Methanol 67-56-1 100 0.0491 N/A
Polyalkylhydroxyl Alcohol Not Available 100 0.0491 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-26 2018-02-02 Municipal Water 2050

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5587 0.0 0.0 0.0
2019 6553 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References