If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0234142504030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.994748,"lon":-111.840218,"icon":""}]} |
| Location: 03/04-25-023-14W4/0 | |
| Location Alias: 03/04-25-23-14 W4M | |
| Location Alias 2: 03/04-25-023-14 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 023 | |
| Meridian: 4 | |
| Range: 14 | |
| Section: 25 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: SWORD 103 HZ MATZ 4-25-23-14 | |
| Operator Name: Journey Energy Inc. | |
| License Number: 0443188 | |
| License Date: 2012-01-23 | |
| License Status: Issued | |
| Spud Date: 2012-08-13 | |
| Final Drill Date: 2012-08-22 | |
| Well Total Depth: 2494.00 m | |
| Surface Hole Latitude: 50.994748 | |
| Surface Hole Longitude: -111.840218 |
| Date | Event |
|---|---|
| 2012-01-23 | Obtained License |
| 2012-08-13 | Surface Casing Operation Performed |
| 2012-08-15 | Direction Drilling Operation Performed - Deviate |
| 2012-08-16 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-16 | Well Log Performed |
| 2012-08-17 | Intermediate Casing Operation Performed |
| 2012-08-22 | Finished Drilling |
| 2012-08-22 | Well Log Performed |
| 2012-08-22 | Well Mode changed to Drilled and Cased |
| 2012-08-24 | Liner Casing Operation Performed |
| 2012-08-24 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-08-24 | Rig Released |
| 2012-08-24 | Well Log Performed |
| 2012-08-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-01 | Well Began Production |
| 2012-10-01 | Well Fluid changed to Crude Oil |
| 2012-10-01 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-13 | Quintera Drilling Ltd. | THREE | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-15 | 818.00 | Deviate (5 - 79 degrees) |
| 2012-08-16 | 1076.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-24 | Open Hole/Barefoot Completion | 2490.00 | 2494.00 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1750.90 | 1751.70 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1665.80 | 1666.60 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1582.20 | 1583.00 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1497.50 | 1498.30 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1424.40 | 1425.20 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1351.30 | 1352.10 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1276.30 | 1277.10 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1216.30 | 1217.10 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1142.10 | 1142.90 | 0 |
| 2012-08-28 | Multi-Stage Fracture | 2480.70 | 2481.60 | 0 |
| 2012-08-28 | Multi-Stage Fracture | 2382.50 | 2383.30 | 0 |
| 2012-08-28 | Multi-Stage Fracture | 2300.80 | 2301.60 | 0 |
| 2012-08-28 | Multi-Stage Fracture | 2195.80 | 2196.60 | 0 |
| 2012-08-28 | Multi-Stage Fracture | 2101.70 | 2102.50 | 0 |
| 2012-08-28 | Multi-Stage Fracture | 2016.80 | 2017.60 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1920.70 | 1921.50 | 0 |
| 2012-08-29 | Multi-Stage Fracture | 1836.20 | 1837.00 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2173 | 0.0 | 0.0 | 0.0 |
| 2013 | 8183 | 0.0 | 0.0 | 0.0 |
| 2014 | 8367 | 0.0 | 0.0 | 0.0 |
| 2015 | 8507 | 0.0 | 0.0 | 0.0 |
| 2016 | 8518 | 0.0 | 0.0 | 0.0 |
| 2017 | 5910 | 0.0 | 0.0 | 0.0 |
| 2018 | 5136 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]