If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234150307002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.925995,"lon":-112.012545,"icon":""}]} |
Location: 00/07-03-023-15W4/2 | |
Location Alias: 00/07-03-23-15 W4M | |
Location Alias 2: 00/07-03-023-15 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 15 | |
Section: 03 | |
County/Municipality: County of Newell | |
Well Name: ENERMARK ET AL VERGER 7-3-23-15 | |
Operator Name: Enerplus Corporation | |
License Number: 0037748 | |
License Date: 1970-02-09 | |
License Status: RecCertified | |
Spud Date: 1970-02-14 | |
Final Drill Date: 1970-02-20 | |
Well Total Depth: 1087.20 m | |
Surface Hole Latitude: 50.925995 | |
Surface Hole Longitude: -112.012545 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-02-09 | Obtained License |
1970-02-19 | Drill Stem Test Performed |
1970-02-20 | Finished Drilling |
1970-02-20 | Well Mode changed to Drilled and Cased |
1970-02-21 | Drill Stem Test Performed |
1970-02-22 | Drill Stem Test Performed |
1970-02-22 | Production Casing Operation Performed |
1970-03-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
1970-03-23 | Perforation Treatment Performed - Jet Perforation |
1970-03-24 | Perforation Treatment Performed - Jet Perforation |
1971-07-31 | Perforation Treatment Performed - Jet Perforation |
1975-03-18 | Perforation Treatment Performed - Jet Perforation |
1976-02-12 | Well Began Production |
1976-02-12 | Well Fluid changed to Gas |
1976-02-12 | Well Mode changed to Flowing |
1977-01-01 | Well Fluid changed to Gas |
1977-01-01 | Well Mode changed to Suspended |
1995-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-09-28 | Perforation Treatment Performed - Jet Perforation |
1995-09-28 | Plug Back Performed |
1995-09-28 | Well Log Performed |
1995-09-29 | Perforation Treatment Performed - Remedial Casing |
1995-09-29 | Well Fluid changed to Gas |
1995-09-29 | Well Mode changed to Abandoned |
1995-10-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1970-03-23 | Perforation | 1056.40 | 1058.30 | 7 |
1970-03-23 | Acid Wash | 1056.40 | 1058.30 | 0 |
1970-03-24 | Perforation | 1056.40 | 1060.10 | 13 |
1971-07-31 | Perforation | 1060.10 | 1062.50 | 7 |
1975-03-18 | Perforation | 931.80 | 941.80 | 7 |
1995-09-28 | Packing Device Capped w/Cement | 945.00 | 953.00 | 0 |
1995-09-28 | Packing Device Capped w/Cement | 916.60 | 924.60 | 0 |
1995-09-28 | Perforation | 181.00 | 182.00 | 13 |
1995-09-29 | Remedial Casing Cementing | 181.00 | 182.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 1656 | 0.0 | 0.0 | 0.0 |
1976 | 7009 | 0.0 | 0.0 | 0.0 |
For data sources see[5]