If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234270301000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.923367,"lon":-113.682593,"icon":""}]} |
Location: 00/01-03-023-27W4/0 | |
Location Alias: 00/01-03-23-27 W4M | |
Location Alias 2: 00/01-03-023-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 27 | |
Section: 03 | |
County/Municipality: Rocky View County | |
Well Name: SUN LANGDON C.P.R. #1. | |
Operator Name: Suncor Energy Inc. | |
License Number: B0002125 | |
License Date: 1948-06-01 | |
License Status: RecExempt | |
Spud Date: 1948-07-08 | |
Final Drill Date: 1949-04-04 | |
Well Total Depth: 2682.20 m | |
Surface Hole Latitude: 50.923367 | |
Surface Hole Longitude: -113.682593 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-06-01 | Obtained License |
1948-11-13 | Drill Stem Test Performed |
1949-02-06 | Production Casing Operation Performed |
1949-02-12 | Perforation Treatment Performed - Open-Hole Completion |
1949-02-22 | Drill Stem Test Performed |
1949-03-24 | Drill Stem Test Performed |
1949-03-27 | Drill Stem Test Performed |
1949-04-04 | Finished Drilling |
1949-04-09 | Drill Stem Test Performed |
1949-04-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
1949-04-13 | Perforation Treatment Performed - Bullet Perforation |
1949-04-14 | Drill Stem Test Performed |
1949-04-15 | Perforation Treatment Performed - Cement Plug |
1949-04-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-02-12 | Open Hole/Barefoot Completion | 1953.20 | 2019.30 | 0 |
1949-04-09 | Acid Wash | 1953.20 | 2019.30 | 0 |
1949-04-13 | Bullet Perforation | 1932.40 | 1952.20 | 20 |
1949-04-15 | Cement Plug | 1932.40 | 1952.20 | 0 |
For data sources see[4]