If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0234292510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.989139,"lon":-113.920112,"icon":""}]} |
Location: 00/10-25-023-29W4/0 | |
Location Alias: 00/10-25-23-29 W4M | |
Location Alias 2: 00/10-25-023-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 023 | |
Meridian: 4 | |
Range: 29 | |
Section: 25 | |
County/Municipality: Calgary | |
Well Name: SOC CROSS 10-25-23-29 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0095530 | |
License Date: 1982-03-11 | |
License Status: RecCertified | |
Spud Date: 1982-03-17 | |
Final Drill Date: 1982-03-26 | |
Well Total Depth: 1660.00 m | |
Surface Hole Latitude: 50.989139 | |
Surface Hole Longitude: -113.920112 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-03-11 | Obtained License |
1982-03-26 | Finished Drilling |
1982-03-26 | Well Mode changed to Drilled and Cased |
1982-03-27 | Well Log Performed |
1982-03-28 | Production Casing Operation Performed |
1982-06-12 | Perforation Treatment Performed - Jet Perforation |
1982-06-13 | Perforation Treatment Performed - Fractured |
1982-06-18 | Perforation Treatment Performed - Fractured |
1982-06-26 | Well Began Production |
1982-06-26 | Well Fluid changed to Crude Oil |
1982-06-26 | Well Mode changed to Pumping |
1989-11-28 | Well Fluid changed to Crude Oil |
1989-11-28 | Well Mode changed to Suspended |
1990-02-19 | Well Fluid changed to Crude Oil |
1990-02-19 | Well Mode changed to Pumping |
2009-10-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-10-19 | Plug Back Performed |
2009-10-19 | Well Fluid changed to Crude Oil |
2009-10-19 | Well Log Performed |
2009-10-19 | Well Mode changed to Abandoned Zone |
2009-10-20 | Perforation Treatment Performed - Jet Perforation |
2009-10-20 | Well Fluid changed to Crude Oil |
2009-10-20 | Well Mode changed to Pumping |
2009-10-21 | Perforation Treatment Performed - Cement Plug |
2009-10-21 | Plug Back Performed |
2009-10-22 | Perforation Treatment Performed - Jet Perforation |
2009-10-22 | Well Log Performed |
2009-10-23 | Perforation Treatment Performed - Cement Plug |
2009-10-23 | Plug Back Performed |
2009-10-27 | Well Log Performed |
2009-12-16 | Well Log Performed |
2009-12-17 | Perforation Treatment Performed - Jet Perforation |
2009-12-17 | Well Log Performed |
2009-12-18 | Perforation Treatment Performed - Cement Plug |
2009-12-18 | Plug Back Performed |
2009-12-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-12-20 | Perforation Treatment Performed - Jet Perforation |
2009-12-20 | Plug Back Performed |
2009-12-20 | Well Log Performed |
2009-12-21 | Perforation Treatment Performed - Cement Plug |
2009-12-21 | Plug Back Performed |
2010-04-07 | Perforation Treatment Performed - Jet Perforation |
2010-04-07 | Well Log Performed |
2010-04-09 | Perforation Treatment Performed - Cement Plug |
2010-04-09 | Plug Back Performed |
2010-04-09 | Well Fluid changed to Crude Oil |
2010-04-09 | Well Mode changed to Abandoned Zone |
2010-05-31 | Well Abandoned |
2010-05-31 | Well Fluid changed to Crude Oil |
2010-05-31 | Well Mode changed to Abandoned |
2014-02-02 | Perforation Treatment Performed - Jet Perforation |
2014-11-17 | Well Log Performed |
2014-12-02 | Perforation Treatment Performed - Jet Perforation |
2014-12-02 | Well Log Performed |
2014-12-03 | Perforation Treatment Performed - Cement Squeeze |
2014-12-05 | Perforation Treatment Performed - Jet Perforation |
2014-12-08 | Perforation Treatment Performed - Cement Squeeze |
2014-12-08 | Plug Back Performed |
2014-12-10 | Perforation Treatment Performed - Jet Perforation |
2014-12-10 | Well Log Performed |
2014-12-11 | Perforation Treatment Performed - Cement Squeeze |
2014-12-11 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-06-12 | Perforation | 1634.00 | 1636.00 | 13 |
2009-10-23 | Cement Plug | 385.40 | 392.00 | 0 |
2009-10-23 | Cement Plug | 338.40 | 385.00 | 0 |
2009-12-17 | Perforation | 335.00 | 336.00 | 13 |
2009-12-18 | Cement Plug | 332.00 | 338.40 | 0 |
2009-12-20 | Perforation | 244.00 | 245.00 | 13 |
2009-12-20 | Perforation | 230.00 | 231.00 | 20 |
2009-12-20 | Packing Device Capped w/Cement | 319.00 | 327.00 | 0 |
2009-12-21 | Cement Plug | 208.60 | 270.00 | 0 |
2010-04-07 | Perforation | 214.00 | 217.00 | 17 |
2010-04-07 | Perforation | 193.00 | 196.00 | 17 |
1982-06-13 | Fracture | 1634.00 | 1636.00 | 0 |
2010-04-09 | Cement Plug | 319.00 | 327.00 | 0 |
2010-04-09 | Cement Plug | 161.40 | 232.00 | 0 |
2014-02-02 | Perforation | 1209.00 | 1210.00 | 17 |
2014-12-02 | Perforation | 930.00 | 931.00 | 17 |
2014-12-03 | Cement Squeeze | 930.00 | 1205.00 | 0 |
2014-12-05 | Perforation | 689.00 | 690.00 | 17 |
2014-12-05 | Perforation | 393.50 | 394.00 | 17 |
2014-12-08 | Cement Squeeze | 393.50 | 394.50 | 0 |
2014-12-08 | Cement Squeeze | 689.00 | 690.00 | 0 |
2014-12-10 | Perforation | 193.00 | 196.00 | 17 |
1982-06-18 | Fracture | 1634.00 | 1636.00 | 0 |
2014-12-10 | Perforation | 214.00 | 217.00 | 17 |
2014-12-11 | Cement Squeeze | 193.00 | 217.00 | 0 |
2009-10-19 | Packing Device Capped w/Cement | 1616.80 | 1625.20 | 0 |
2009-10-20 | Perforation | 925.00 | 926.00 | 13 |
2009-10-20 | Perforation | 915.00 | 916.00 | 13 |
2009-10-21 | Cement Plug | 920.40 | 926.00 | 0 |
2009-10-21 | Cement Plug | 801.60 | 920.00 | 0 |
2009-10-22 | Perforation | 391.00 | 392.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 3696 | 0.0 | 0.0 | 0.0 |
1983 | 8511 | 0.0 | 0.0 | 0.0 |
1984 | 8338 | 0.0 | 0.0 | 0.0 |
1985 | 8758 | 0.0 | 0.0 | 0.0 |
1986 | 8598 | 0.0 | 0.0 | 0.0 |
1987 | 8711 | 0.0 | 0.0 | 0.0 |
1988 | 8783 | 0.0 | 0.0 | 0.0 |
1989 | 5447 | 0.0 | 0.0 | 0.0 |
1990 | 7559 | 0.0 | 0.0 | 0.0 |
1991 | 8759 | 0.0 | 0.0 | 0.0 |
1992 | 8471 | 0.0 | 0.0 | 0.0 |
1993 | 8759 | 0.0 | 0.0 | 0.0 |
1994 | 8759 | 0.0 | 0.0 | 0.0 |
1995 | 8759 | 0.0 | 0.0 | 0.0 |
1996 | 8411 | 0.0 | 0.0 | 0.0 |
1997 | 7484 | 0.0 | 0.0 | 0.0 |
1998 | 5602 | 0.0 | 0.0 | 0.0 |
1999 | 6464 | 0.0 | 0.0 | 0.0 |
2000 | 7927 | 0.0 | 0.0 | 0.0 |
2001 | 6623 | 0.0 | 0.0 | 0.0 |
2002 | 6555 | 0.0 | 0.0 | 0.0 |
2003 | 5803 | 0.0 | 0.0 | 0.0 |
2004 | 5926 | 0.0 | 0.0 | 0.0 |
2005 | 7863 | 0.0 | 0.0 | 0.0 |
2006 | 6684 | 0.0 | 0.0 | 0.0 |
2007 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[5]