If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244270815003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.030006,"lon":-113.726878,"icon":""}]} |
Location: 00/15-08-024-27W4/3 | |
Location Alias: 00/15-08-24-27 W4M | |
Location Alias 2: 00/15-08-024-27 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 08 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 15-8-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0393554 | |
License Date: 2008-02-04 | |
License Status: Amended | |
Spud Date: 2008-02-12 | |
Final Drill Date: 2008-02-13 | |
Well Total Depth: 1270.00 m | |
Surface Hole Latitude: 51.030006 | |
Surface Hole Longitude: -113.726878 |
Date | Event |
---|---|
2008-02-04 | Obtained License |
2008-02-12 | Direction Drilling Operation Performed - Deviate |
2008-02-12 | Surface Casing Operation Performed |
2008-02-13 | Finished Drilling |
2008-02-13 | Well Mode changed to Drilled and Cased |
2008-02-14 | Production Casing Operation Performed |
2008-02-14 | Rig Released |
2008-02-20 | Well Log Performed |
2008-03-02 | Perforation Treatment Performed - Jet Perforation |
2008-03-06 | Perforation Treatment Performed - Jet Perforation |
2008-05-14 | Perforation Treatment Performed - Fractured |
2010-01-11 | Perforation Treatment Performed - Jet Perforation |
2010-01-25 | Perforation Treatment Performed - Fractured |
2010-01-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-29 | Well Mode changed to Testing |
2010-02-12 | Well Began Production |
2010-02-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-12 | Well Mode changed to Flowing |
2010-03-26 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-02-12 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-03-02 | Perforation | 941.50 | 944.50 | 13 |
2010-01-11 | Perforation | 442.80 | 443.80 | 13 |
2010-01-11 | Perforation | 405.30 | 405.80 | 13 |
2010-01-11 | Perforation | 505.30 | 506.30 | 13 |
2010-01-11 | Perforation | 775.00 | 776.00 | 13 |
2010-01-11 | Perforation | 655.50 | 656.00 | 13 |
2010-01-11 | Perforation | 998.80 | 999.80 | 13 |
2010-01-11 | Perforation | 974.30 | 976.30 | 13 |
2010-01-11 | Perforation | 1002.50 | 1003.00 | 13 |
2010-01-11 | Perforation | 1059.20 | 1059.70 | 13 |
2010-01-11 | Perforation | 1003.90 | 1006.90 | 13 |
2008-03-06 | Perforation | 845.00 | 848.00 | 13 |
2010-01-11 | Perforation | 898.10 | 899.10 | 13 |
2010-01-11 | Perforation | 804.70 | 805.20 | 13 |
2010-01-11 | Perforation | 796.50 | 797.00 | 13 |
2010-01-11 | Perforation | 795.00 | 795.50 | 13 |
2010-01-11 | Perforation | 866.40 | 866.90 | 13 |
2010-01-11 | Perforation | 893.90 | 894.40 | 13 |
2010-01-25 | Fracture | 405.30 | 405.80 | 0 |
2010-01-25 | Fracture | 442.80 | 776.00 | 0 |
2010-01-25 | Fracture | 413.80 | 1059.70 | 0 |
2008-05-14 | Fracture | 845.00 | 848.00 | 0 |
2010-01-11 | Perforation | 497.00 | 497.50 | 13 |
2010-01-11 | Perforation | 425.90 | 426.90 | 13 |
2010-01-11 | Perforation | 597.30 | 600.30 | 13 |
2010-01-11 | Perforation | 638.60 | 640.60 | 13 |
2010-01-11 | Perforation | 637.40 | 637.90 | 13 |
2010-01-11 | Perforation | 413.80 | 414.30 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7779 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 4294 | 0.0 | 0.0 | 0.0 |
2013 | 8743 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8706 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8559 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[6]