X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244271510000

Well Details

Well ID: 0244271510000
Loading map...
Location: 00/10-15-024-27W4/0
Location Alias: 00/10-15-24-27 W4M
Location Alias 2: 00/10-15-024-27 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 15
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 10-15-24-27
Operator Name: Ember Resources Inc.
License Number: 0324568
License Date: 2005-01-19
License Status: Issued
Spud Date: 2005-02-24
Final Drill Date: 2005-05-05
Well Total Depth: 868.00 m
Surface Hole Latitude: 51.047161
Surface Hole Longitude: -113.690460

For data sources see[1][2]

Well History

Date Event
2005-01-19 Obtained License
2005-02-24 Surface Casing Operation Performed
2005-05-05 Finished Drilling
2005-05-05 Production Casing Operation Performed
2005-05-05 Rig Released
2005-05-05 Well Mode changed to Drilled and Cased
2005-05-08 Well Log Performed
2005-05-26 Perforation Treatment Performed - Jet Perforation
2005-07-10 Perforation Treatment Performed - Fractured
2005-07-14 Well Fluid changed to Gas
2005-07-14 Well Mode changed to Testing
2005-08-20 Perforation Treatment Performed - Jet Perforation
2005-09-01 Perforation Treatment Performed - Fractured
2005-12-01 Well Structure changed to Commingled
2010-11-30 Perforation Treatment Performed - Jet Perforation
2010-12-17 Perforation Treatment Performed - Fractured
2010-12-20 Well Structure changed to Commingled
2011-01-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-26 Perforation 675.00 679.00 13
2005-08-20 Perforation 684.90 685.40 13
2005-08-20 Perforation 623.70 624.20 13
2005-08-20 Perforation 620.70 621.20 13
2005-08-20 Perforation 607.10 608.10 13
2005-08-20 Perforation 599.70 600.20 13
2005-08-20 Perforation 592.80 593.30 13
2005-08-20 Perforation 581.70 582.20 13
2005-08-20 Perforation 575.50 576.50 13
2005-08-20 Perforation 573.90 574.40 13
2005-08-20 Perforation 570.40 570.90 13
2005-07-10 Fracture 675.00 679.00 0
2005-08-20 Perforation 561.00 562.00 13
2005-08-20 Perforation 556.00 556.50 13
2005-08-20 Perforation 512.40 512.90 13
2005-08-20 Perforation 502.90 503.40 13
2005-08-20 Perforation 455.60 456.10 13
2005-08-20 Perforation 440.00 440.50 13
2005-08-20 Perforation 434.80 435.30 13
2005-08-20 Perforation 431.60 432.10 13
2005-08-20 Perforation 423.90 424.40 13
2005-08-20 Perforation 364.80 365.30 13
2005-08-20 Perforation 756.90 757.40 13
2005-08-20 Perforation 317.40 317.90 13
2005-08-20 Perforation 314.50 315.50 13
2005-09-01 Fracture 314.50 757.40 0
2010-11-30 Perforation 829.00 831.00 13
2010-11-30 Perforation 650.00 652.00 13
2010-11-30 Perforation 626.50 628.50 13
2010-11-30 Perforation 277.50 279.50 13
2010-11-30 Perforation 252.50 255.50 13
2010-12-17 Fracture 829.00 831.00 0
2010-12-17 Fracture 252.50 255.50 0
2005-08-20 Perforation 750.20 750.70 13
2011-01-23 Fracture 314.50 757.40 0
2011-01-23 Fracture 277.50 652.50 0
2005-08-20 Perforation 713.00 713.50 13
2005-08-20 Perforation 705.60 706.10 13
2005-08-20 Perforation 701.90 702.40 13
2005-08-20 Perforation 699.60 700.10 13
2005-08-20 Perforation 697.40 697.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 72 0.0 0.0 0.0

For data sources see[5]

References