If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244271609002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.047525,"lon":-113.703939,"icon":""}]} |
Location: 00/09-16-024-27W4/2 | |
Location Alias: 00/09-16-24-27 W4M | |
Location Alias 2: 00/09-16-024-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 16 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-16-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0319179 | |
License Date: 2004-11-18 | |
License Status: Issued | |
Spud Date: 2005-02-25 | |
Final Drill Date: 2005-05-06 | |
Well Total Depth: 1146.00 m | |
Surface Hole Latitude: 51.047525 | |
Surface Hole Longitude: -113.703939 |
Date | Event |
---|---|
2004-11-18 | Obtained License |
2005-02-25 | Surface Casing Operation Performed |
2005-05-06 | Finished Drilling |
2005-05-06 | Production Casing Operation Performed |
2005-05-06 | Rig Released |
2005-05-06 | Well Mode changed to Drilled and Cased |
2005-05-09 | Well Log Performed |
2005-05-26 | Perforation Treatment Performed - Jet Perforation |
2005-07-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-06 | Plug Back Performed |
2005-07-08 | Perforation Treatment Performed - Jet Perforation |
2005-07-18 | Perforation Treatment Performed - Fractured |
2005-07-22 | Well Fluid changed to Gas |
2005-07-22 | Well Mode changed to Testing |
2005-08-28 | Perforation Treatment Performed - Jet Perforation |
2005-09-02 | Perforation Treatment Performed - Fractured |
2005-11-24 | Well Began Production |
2005-11-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-11-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-05-26 | Perforation | 917.00 | 919.00 | 13 |
2005-08-28 | Perforation | 706.80 | 707.30 | 13 |
2005-08-28 | Perforation | 704.50 | 705.00 | 13 |
2005-08-28 | Perforation | 702.40 | 702.90 | 13 |
2005-08-28 | Perforation | 685.30 | 685.80 | 13 |
2005-08-28 | Perforation | 649.00 | 649.50 | 13 |
2005-08-28 | Perforation | 629.30 | 629.80 | 13 |
2005-08-28 | Perforation | 626.50 | 627.00 | 13 |
2005-08-28 | Perforation | 611.80 | 612.30 | 13 |
2005-08-28 | Perforation | 604.20 | 604.70 | 13 |
2005-08-28 | Perforation | 598.90 | 599.40 | 13 |
2005-05-26 | Perforation | 910.00 | 912.00 | 13 |
2005-08-28 | Perforation | 589.20 | 589.70 | 13 |
2005-08-28 | Perforation | 585.00 | 585.50 | 13 |
2005-08-28 | Perforation | 582.90 | 583.40 | 13 |
2005-08-28 | Perforation | 578.70 | 579.20 | 13 |
2005-08-28 | Perforation | 573.50 | 574.00 | 13 |
2005-08-28 | Perforation | 566.50 | 568.50 | 13 |
2005-08-28 | Perforation | 514.00 | 514.50 | 13 |
2005-08-28 | Perforation | 455.60 | 456.10 | 13 |
2005-08-28 | Perforation | 448.50 | 449.00 | 13 |
2005-08-28 | Perforation | 442.00 | 442.50 | 13 |
2005-07-06 | Packing Device Capped w/Cement | 896.50 | 904.50 | 0 |
2005-08-28 | Perforation | 438.30 | 438.80 | 13 |
2005-08-28 | Perforation | 373.90 | 374.40 | 13 |
2005-08-28 | Perforation | 326.20 | 326.70 | 13 |
2005-08-28 | Perforation | 320.70 | 321.20 | 13 |
2005-08-28 | Perforation | 307.40 | 307.90 | 13 |
2005-08-28 | Perforation | 307.40 | 307.90 | 13 |
2005-09-02 | Fracture | 307.40 | 756.40 | 0 |
2005-07-08 | Perforation | 886.00 | 888.00 | 13 |
2005-07-18 | Fracture | 886.00 | 888.00 | 0 |
2005-08-28 | Perforation | 755.90 | 756.40 | 13 |
2005-08-28 | Perforation | 750.90 | 751.40 | 13 |
2005-08-28 | Perforation | 728.80 | 729.30 | 13 |
2005-08-28 | Perforation | 711.20 | 711.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1148 | 0.0 | 0.0 | 0.0 |
2006 | 8717 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 5038 | 0.0 | 0.0 | 0.0 |
2013 | 8743 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8559 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[5]