If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244271916002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.059056,"lon":-113.759573,"icon":""}]} |
Location: 00/16-19-024-27W4/2 | |
Location Alias: 00/16-19-24-27 W4M | |
Location Alias 2: 00/16-19-024-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 19 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-19-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0415537 | |
License Date: 2009-12-14 | |
License Status: Issued | |
Spud Date: 2010-02-10 | |
Final Drill Date: 2010-02-11 | |
Well Total Depth: 1429.00 m | |
Surface Hole Latitude: 51.059056 | |
Surface Hole Longitude: -113.759573 |
Date | Event |
---|---|
2009-12-14 | Obtained License |
2010-02-10 | Surface Casing Operation Performed |
2010-02-11 | Direction Drilling Operation Performed - Deviate |
2010-02-11 | Finished Drilling |
2010-02-11 | Well Mode changed to Drilled and Cased |
2010-02-12 | Production Casing Operation Performed |
2010-02-12 | Rig Released |
2010-02-20 | Well Log Performed |
2010-04-05 | Perforation Treatment Performed - Jet Perforation |
2010-07-29 | Perforation Treatment Performed - Fractured |
2010-08-19 | Perforation Treatment Performed - Jet Perforation |
2010-08-23 | Perforation Treatment Performed - Fractured |
2010-09-01 | Well Began Production |
2010-09-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-01 | Well Mode changed to Flowing |
2010-10-07 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-11 | 6.10 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-04-05 | Perforation | 357.50 | 360.50 | 13 |
2010-08-19 | Perforation | 602.70 | 603.20 | 13 |
2010-08-19 | Perforation | 600.10 | 601.10 | 13 |
2010-08-19 | Perforation | 550.80 | 551.30 | 13 |
2010-08-19 | Perforation | 611.20 | 611.70 | 13 |
2010-08-19 | Perforation | 767.00 | 767.50 | 13 |
2010-08-19 | Perforation | 766.10 | 766.60 | 13 |
2010-08-19 | Perforation | 679.90 | 680.40 | 13 |
2010-08-19 | Perforation | 926.10 | 927.10 | 13 |
2010-08-19 | Perforation | 661.80 | 663.80 | 13 |
2010-08-19 | Perforation | 630.00 | 631.00 | 13 |
2010-07-29 | Fracture | 357.50 | 360.50 | 0 |
2010-08-19 | Perforation | 478.00 | 481.00 | 13 |
2010-08-19 | Perforation | 671.80 | 672.80 | 13 |
2010-08-19 | Perforation | 1077.50 | 1080.50 | 13 |
2010-08-19 | Perforation | 759.00 | 761.00 | 13 |
2010-08-19 | Perforation | 688.00 | 690.00 | 13 |
2010-08-19 | Perforation | 936.40 | 936.90 | 13 |
2010-08-19 | Perforation | 932.10 | 933.10 | 13 |
2010-08-19 | Perforation | 930.20 | 930.70 | 13 |
2010-08-19 | Perforation | 958.90 | 959.40 | 13 |
2010-08-19 | Perforation | 413.00 | 416.00 | 13 |
2010-08-19 | Perforation | 818.60 | 819.60 | 13 |
2010-08-19 | Perforation | 983.60 | 984.10 | 13 |
2010-08-23 | Fracture | 550.80 | 984.10 | 0 |
2010-08-23 | Fracture | 413.00 | 1080.50 | 0 |
2010-08-19 | Perforation | 781.10 | 781.60 | 13 |
2010-08-19 | Perforation | 774.80 | 775.30 | 13 |
2010-08-19 | Perforation | 820.50 | 821.00 | 13 |
2010-08-19 | Perforation | 923.90 | 924.40 | 13 |
2010-08-19 | Perforation | 908.30 | 910.30 | 13 |
2010-08-19 | Perforation | 840.60 | 841.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2304 | 0.0 | 0.0 | 0.0 |
2011 | 8758 | 0.0 | 0.0 | 0.0 |
2012 | 4126 | 0.0 | 0.0 | 0.0 |
2013 | 8743 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8559 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[6]