If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244272111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.060937,"lon":-113.71697,"icon":""}]} |
Location: 00/11-21-024-27W4/0 | |
Location Alias: 00/11-21-24-27 W4M | |
Location Alias 2: 00/11-21-024-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 21 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 11-21-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0409019 | |
License Date: 2009-02-06 | |
License Status: Issued | |
Spud Date: 2010-01-28 | |
Final Drill Date: 2010-02-06 | |
Well Total Depth: 1151.00 m | |
Surface Hole Latitude: 51.060937 | |
Surface Hole Longitude: -113.716970 |
Date | Event |
---|---|
2009-02-06 | Obtained License |
2010-01-28 | Surface Casing Operation Performed |
2010-02-06 | Finished Drilling |
2010-02-06 | Production Casing Operation Performed |
2010-02-06 | Rig Released |
2010-02-06 | Well Mode changed to Drilled and Cased |
2010-02-09 | Well Log Performed |
2010-02-18 | Perforation Treatment Performed - Jet Perforation |
2010-04-01 | Well Began Production |
2010-04-01 | Well Fluid changed to Gas |
2010-04-01 | Well Mode changed to Flowing |
2010-07-29 | Perforation Treatment Performed - Fractured |
2010-08-17 | Perforation Treatment Performed - Jet Perforation |
2010-08-20 | Perforation Treatment Performed - Fractured |
2010-08-26 | Well Structure changed to Commingled |
2010-11-06 | Well Log Performed |
2011-08-06 | Perforation Treatment Performed - Jet Perforation |
2011-09-24 | Perforation Treatment Performed - Fractured |
2017-09-20 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-18 | Perforation | 675.00 | 678.00 | 13 |
2010-08-17 | Perforation | 336.90 | 338.90 | 13 |
2010-08-17 | Perforation | 535.00 | 538.00 | 13 |
2010-08-17 | Perforation | 514.50 | 517.50 | 13 |
2010-08-17 | Perforation | 448.30 | 448.80 | 13 |
2010-08-17 | Perforation | 414.60 | 415.10 | 13 |
2010-08-17 | Perforation | 387.90 | 388.40 | 13 |
2010-08-17 | Perforation | 603.40 | 603.90 | 13 |
2010-08-17 | Perforation | 717.40 | 718.40 | 13 |
2010-08-17 | Perforation | 715.10 | 715.60 | 13 |
2010-08-17 | Perforation | 712.80 | 713.30 | 13 |
2010-07-29 | Fracture | 675.00 | 678.00 | 0 |
2010-08-17 | Perforation | 767.40 | 767.90 | 13 |
2010-08-17 | Perforation | 725.40 | 725.90 | 13 |
2010-08-17 | Perforation | 720.50 | 721.00 | 13 |
2010-08-17 | Perforation | 696.80 | 698.80 | 13 |
2010-08-17 | Perforation | 627.10 | 628.10 | 13 |
2010-08-17 | Perforation | 620.30 | 620.80 | 13 |
2010-08-17 | Perforation | 614.20 | 614.70 | 13 |
2010-08-17 | Perforation | 647.90 | 648.40 | 13 |
2010-08-17 | Perforation | 650.40 | 650.90 | 13 |
2010-08-17 | Perforation | 646.30 | 646.80 | 13 |
2010-08-17 | Perforation | 580.80 | 581.30 | 13 |
2010-08-20 | Fracture | 514.50 | 538.00 | 0 |
2010-08-20 | Fracture | 336.90 | 767.90 | 0 |
2011-08-06 | Perforation | 913.00 | 915.00 | 13 |
2011-08-06 | Perforation | 1013.00 | 1015.00 | 13 |
2011-08-06 | Perforation | 1078.00 | 1080.00 | 13 |
2011-08-06 | Perforation | 270.00 | 272.00 | 13 |
2011-08-06 | Perforation | 292.50 | 294.50 | 13 |
2011-09-24 | Fracture | 270.00 | 272.00 | 0 |
2011-09-24 | Fracture | 292.50 | 294.50 | 0 |
2011-09-24 | Fracture | 913.00 | 915.00 | 0 |
2010-08-17 | Perforation | 470.80 | 471.30 | 13 |
2011-09-24 | Fracture | 1013.00 | 1015.00 | 0 |
2011-09-24 | Fracture | 1078.00 | 1080.00 | 0 |
2010-08-17 | Perforation | 464.30 | 464.80 | 13 |
2010-08-17 | Perforation | 596.80 | 597.30 | 13 |
2010-08-17 | Perforation | 594.50 | 595.00 | 13 |
2010-08-17 | Perforation | 587.40 | 587.90 | 13 |
2010-08-17 | Perforation | 449.30 | 449.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-09-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]