X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244272311000

Well Details

Well ID: 0244272311000
Loading map...
Location: 00/11-23-024-27W4/0
Location Alias: 00/11-23-24-27 W4M
Location Alias 2: 00/11-23-024-27 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 23
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 11-23-24-27
Operator Name: Ember Resources Inc.
License Number: 0327507
License Date: 2005-03-03
License Status: Issued
Spud Date: 2005-05-10
Final Drill Date: 2005-05-13
Well Total Depth: 848.00 m
Surface Hole Latitude: 51.060937
Surface Hole Longitude: -113.672208

For data sources see[1][2]

Well History

Date Event
2005-03-03 Obtained License
2005-05-10 Surface Casing Operation Performed
2005-05-13 Finished Drilling
2005-05-13 Well Mode changed to Drilled and Cased
2005-05-14 Production Casing Operation Performed
2005-05-14 Rig Released
2005-05-20 Well Log Performed
2005-06-30 Perforation Treatment Performed - Jet Perforation
2005-07-13 Perforation Treatment Performed - Fractured
2005-11-24 Well Began Production
2005-11-24 Well Fluid changed to Coalbed Methane-Coals Only
2005-11-24 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-30 Perforation 741.90 742.40 13
2005-06-30 Perforation 597.10 597.60 13
2005-06-30 Perforation 595.60 596.10 13
2005-06-30 Perforation 586.20 586.70 13
2005-06-30 Perforation 580.00 580.50 13
2005-06-30 Perforation 570.20 570.70 13
2005-06-30 Perforation 565.90 566.40 13
2005-06-30 Perforation 563.50 564.00 13
2005-06-30 Perforation 558.00 558.50 13
2005-06-30 Perforation 556.00 556.50 13
2005-06-30 Perforation 549.30 549.80 13
2005-06-30 Perforation 739.10 739.60 13
2005-06-30 Perforation 481.50 482.00 13
2005-06-30 Perforation 440.60 441.10 13
2005-06-30 Perforation 435.50 436.00 13
2005-06-30 Perforation 424.30 424.80 13
2005-06-30 Perforation 422.80 423.30 13
2005-06-30 Perforation 421.60 422.10 13
2005-06-30 Perforation 417.70 418.20 13
2005-06-30 Perforation 414.00 414.50 13
2005-06-30 Perforation 406.40 406.90 13
2005-06-30 Perforation 381.30 381.80 13
2005-06-30 Perforation 729.30 729.80 13
2005-06-30 Perforation 355.30 355.80 13
2005-06-30 Perforation 307.10 307.60 13
2005-06-30 Perforation 304.20 304.70 13
2005-06-30 Perforation 284.40 284.90 13
2005-07-13 Fracture 284.40 742.40 0
2005-06-30 Perforation 687.60 688.10 13
2005-06-30 Perforation 685.60 686.10 13
2005-06-30 Perforation 677.80 678.30 13
2005-06-30 Perforation 667.20 667.70 13
2005-06-30 Perforation 614.40 614.90 13
2005-06-30 Perforation 611.70 612.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 908 0.0 0.0 0.0
2006 8706 0.0 0.0 0.0
2007 8587 0.0 0.0 0.0
2008 8040 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8693 0.0 0.0 0.0
2013 8694 0.0 0.0 0.0
2014 8328 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8764 0.0 0.0 0.0
2017 8730 0.0 0.0 0.0
2018 8708 0.0 0.0 0.0
2019 8715 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References