X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244272613000

Well Details

Well ID: 0244272613000
Loading map...
Location: 00/13-26-024-27W4/0
Location Alias: 00/13-26-24-27 W4M
Location Alias 2: 00/13-26-024-27 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 26
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 13-26-24-27
Operator Name: Ember Resources Inc.
License Number: 0389146
License Date: 2007-12-19
License Status: Issued
Spud Date: 2008-02-05
Final Drill Date: 2008-02-06
Well Total Depth: 1187.00 m
Surface Hole Latitude: 51.073588
Surface Hole Longitude: -113.668611

For data sources see[1][2]

Well History

Date Event
2007-12-19 Obtained License
2008-02-05 Direction Drilling Operation Performed - Deviate
2008-02-05 Surface Casing Operation Performed
2008-02-06 Finished Drilling
2008-02-06 Well Mode changed to Drilled and Cased
2008-02-07 Production Casing Operation Performed
2008-02-07 Rig Released
2008-02-09 Well Log Performed
2008-02-26 Perforation Treatment Performed - Jet Perforation
2008-03-02 Perforation Treatment Performed - Jet Perforation
2008-03-04 Perforation Treatment Performed - Fractured
2008-03-19 Well Began Production
2008-03-19 Well Fluid changed to Coalbed Methane-Coals and Other
2008-03-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-05 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-02-26 Perforation 1121.00 1124.00 13
2008-03-02 Perforation 854.60 855.60 13
2008-03-02 Perforation 852.50 853.50 13
2008-03-02 Perforation 833.20 833.70 13
2008-03-02 Perforation 800.20 800.70 13
2008-03-02 Perforation 792.80 793.30 13
2008-03-02 Perforation 791.20 791.70 13
2008-03-02 Perforation 782.70 783.70 13
2008-03-02 Perforation 773.50 774.50 13
2008-03-02 Perforation 628.50 629.50 13
2008-03-02 Perforation 610.30 610.80 13
2008-03-02 Perforation 1011.10 1011.60 13
2008-03-02 Perforation 605.50 606.00 13
2008-03-02 Perforation 595.90 596.40 13
2008-03-02 Perforation 590.40 590.90 13
2008-03-02 Perforation 447.30 449.30 13
2008-03-04 Fracture 447.30 1011.60 0
2008-03-02 Perforation 1008.10 1008.60 13
2008-03-02 Perforation 966.60 967.10 13
2008-03-02 Perforation 957.80 958.30 13
2008-03-02 Perforation 954.70 955.70 13
2008-03-02 Perforation 944.00 945.00 13
2008-03-02 Perforation 925.20 928.20 13
2008-03-02 Perforation 867.70 868.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 6905 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 3647 0.0 0.0 0.0
2012 8693 0.0 0.0 0.0
2013 8694 0.0 0.0 0.0
2014 8328 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8619 0.0 0.0 0.0
2018 8606 0.0 0.0 0.0
2019 8566 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[6]

References