If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244272816002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.080034,"lon":-113.703919,"icon":""}]} |
Location: 00/16-28-024-27W4/2 | |
Location Alias: 00/16-28-24-27 W4M | |
Location Alias 2: 00/16-28-024-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 28 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-28-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0424316 | |
License Date: 2010-10-06 | |
License Status: Issued | |
Spud Date: 2010-12-19 | |
Final Drill Date: 2010-12-31 | |
Well Total Depth: 1132.00 m | |
Surface Hole Latitude: 51.080034 | |
Surface Hole Longitude: -113.703919 |
Date | Event |
---|---|
2010-10-06 | Obtained License |
2010-12-20 | Surface Casing Operation Performed |
2010-12-31 | Finished Drilling |
2010-12-31 | Production Casing Operation Performed |
2010-12-31 | Rig Released |
2010-12-31 | Well Mode changed to Drilled and Cased |
2011-01-03 | Well Log Performed |
2011-01-23 | Perforation Treatment Performed - Jet Perforation |
2011-02-07 | Perforation Treatment Performed - Fractured |
2011-02-21 | Perforation Treatment Performed - Jet Perforation |
2011-03-04 | Perforation Treatment Performed - Fractured |
2011-03-11 | Well Began Production |
2011-03-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-23 | Perforation | 400.50 | 402.50 | 13 |
2011-02-21 | Perforation | 577.90 | 578.40 | 13 |
2011-02-21 | Perforation | 566.20 | 566.70 | 13 |
2011-02-21 | Perforation | 570.50 | 571.50 | 13 |
2011-02-21 | Perforation | 445.70 | 446.20 | 13 |
2011-02-21 | Perforation | 323.10 | 324.60 | 13 |
2011-02-21 | Perforation | 370.80 | 371.30 | 13 |
2011-02-21 | Perforation | 266.90 | 267.40 | 13 |
2011-02-21 | Perforation | 298.80 | 299.30 | 13 |
2011-02-21 | Perforation | 441.30 | 441.80 | 13 |
2011-02-21 | Perforation | 442.20 | 443.70 | 13 |
2011-01-23 | Perforation | 671.00 | 673.00 | 13 |
2011-02-21 | Perforation | 395.70 | 396.20 | 13 |
2011-02-21 | Perforation | 437.30 | 437.80 | 13 |
2011-02-21 | Perforation | 585.80 | 586.30 | 13 |
2011-02-21 | Perforation | 282.50 | 284.50 | 13 |
2011-02-21 | Perforation | 346.50 | 348.50 | 13 |
2011-02-21 | Perforation | 744.90 | 745.40 | 13 |
2011-02-21 | Perforation | 747.10 | 747.60 | 13 |
2011-02-21 | Perforation | 826.50 | 828.00 | 13 |
2011-02-21 | Perforation | 838.50 | 840.50 | 13 |
2011-02-21 | Perforation | 556.50 | 557.50 | 13 |
2011-02-07 | Fracture | 400.50 | 402.50 | 0 |
2011-02-21 | Perforation | 626.00 | 627.00 | 13 |
2011-02-21 | Perforation | 618.10 | 618.60 | 13 |
2011-02-21 | Perforation | 618.70 | 619.70 | 13 |
2011-02-21 | Perforation | 591.20 | 591.70 | 13 |
2011-02-21 | Perforation | 599.20 | 599.70 | 13 |
2011-02-21 | Perforation | 693.50 | 694.50 | 13 |
2011-02-21 | Perforation | 703.80 | 704.30 | 13 |
2011-02-21 | Perforation | 713.20 | 713.70 | 13 |
2011-02-21 | Perforation | 701.00 | 702.00 | 13 |
2011-03-04 | Fracture | 266.90 | 747.60 | 0 |
2011-02-07 | Fracture | 671.00 | 673.00 | 0 |
2011-03-04 | Fracture | 282.50 | 840.50 | 0 |
2011-02-21 | Perforation | 451.50 | 452.00 | 13 |
2011-02-21 | Perforation | 558.00 | 558.50 | 13 |
2011-02-21 | Perforation | 449.20 | 449.70 | 13 |
2011-02-21 | Perforation | 450.90 | 451.40 | 13 |
2011-02-21 | Perforation | 571.60 | 572.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7103 | 0.0 | 0.0 | 0.0 |
2012 | 5038 | 0.0 | 0.0 | 0.0 |
2013 | 8740 | 0.0 | 0.0 | 0.0 |
2014 | 8654 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8719 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8558 | 0.0 | 0.0 | 0.0 |
2019 | 8686 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[5]