X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244273512003

Well Details

Well ID: 0244273512003
Loading map...
Location: 00/12-35-024-27W4/3
Location Alias: 00/12-35-24-27 W4M
Location Alias 2: 00/12-35-024-27 W4/03
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 27
Section: 35
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 12-35-24-27
Operator Name: Ember Resources Inc.
License Number: 0267186
License Date: 2002-02-04
License Status: Issued
Spud Date: 2002-02-15
Final Drill Date: 2002-02-24
Well Total Depth: 2105.00 m
Surface Hole Latitude: 51.094961
Surface Hole Longitude: -113.682233

For data sources see[1][2]

Well History

Date Event
2002-02-04 Obtained License
2002-02-17 Surface Casing Operation Performed
2002-02-18 Direction Drilling Operation Performed - Deviate
2002-02-24 Finished Drilling
2002-02-24 Well Mode changed to Drilled and Cased
2002-02-25 Plug Back Performed
2002-02-25 Well Log Performed
2002-02-26 Production Casing Operation Performed
2002-02-26 Rig Released
2002-04-08 Well Log Performed
2002-04-20 Well Log Performed
2002-12-09 Perforation Treatment Performed - Jet Perforation
2002-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-15 Perforation Treatment Performed - Jet Perforation
2002-12-15 Plug Back Performed
2003-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-20 Plug Back Performed
2003-01-24 Perforation Treatment Performed - Jet Perforation
2003-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-04 Plug Back Performed
2003-02-04 Well Mode changed to Abandoned Zone
2003-02-06 Perforation Treatment Performed - Jet Perforation
2003-10-25 Perforation Treatment Performed - Jet Perforation
2004-04-29 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-02-18 722.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-09 Perforation 1049.80 1052.80 13
2003-02-06 Perforation 799.00 805.00 13
2003-10-25 Perforation 723.90 724.90 13
2003-10-25 Perforation 721.80 722.80 13
2003-10-25 Perforation 719.80 720.80 13
2003-10-25 Perforation 701.60 703.60 13
2003-10-25 Perforation 691.60 692.60 13
2003-10-25 Perforation 684.90 685.90 13
2003-10-25 Perforation 671.80 672.80 13
2003-10-25 Perforation 664.30 665.30 13
2003-10-25 Perforation 638.00 639.00 13
2002-12-09 Perforation 1045.00 1048.00 13
2003-10-25 Perforation 628.80 629.80 13
2003-10-25 Perforation 597.90 599.90 13
2003-10-25 Perforation 591.20 592.20 13
2003-10-25 Perforation 582.30 583.30 13
2003-10-25 Perforation 580.00 581.00 13
2003-10-25 Perforation 574.90 575.90 13
2003-10-25 Perforation 567.20 568.20 13
2003-10-25 Perforation 561.00 562.00 13
2003-10-25 Perforation 553.10 554.10 13
2003-10-25 Perforation 548.20 550.20 13
2002-12-15 Packing Device Capped w/Cement 1032.00 1040.00 0
2003-10-25 Perforation 544.00 545.00 13
2003-10-25 Perforation 536.80 537.80 13
2003-10-25 Perforation 527.20 528.20 13
2003-10-25 Perforation 525.40 526.40 13
2003-10-25 Perforation 514.00 515.00 13
2003-10-25 Perforation 475.70 476.70 13
2003-10-25 Perforation 469.70 471.70 13
2003-10-25 Perforation 462.30 463.30 13
2003-10-25 Perforation 457.60 458.60 13
2003-10-25 Perforation 440.50 441.50 13
2002-12-15 Perforation 976.00 978.00 13
2004-04-29 Fracture 440.50 724.90 0
2002-12-15 Perforation 970.30 973.30 13
2003-01-20 Packing Device Capped w/Cement 943.00 951.00 0
2003-01-24 Perforation 902.00 905.00 13
2003-01-24 Perforation 894.50 896.50 13
2003-02-04 Packing Device Capped w/Cement 880.00 888.00 0

For data sources see[5]



References