If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0244292711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.076078,"lon":-113.972225,"icon":""}]} |
Location: 00/11-27-024-29W4/0 | |
Location Alias: 00/11-27-24-29 W4M | |
Location Alias 2: 00/11-27-024-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 29 | |
Section: 27 | |
County/Municipality: Calgary | |
Well Name: JEFFERSON LAKE CPR CALGARY 27-11 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0013235 | |
License Date: 1957-03-22 | |
License Status: RecCertified | |
Spud Date: 1957-03-28 | |
Final Drill Date: 1957-05-29 | |
Well Total Depth: 2696.90 m | |
Surface Hole Latitude: 51.076078 | |
Surface Hole Longitude: -113.972225 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-03-22 | Obtained License |
1957-04-12 | Drill Stem Test Performed |
1957-05-05 | Drill Stem Test Performed |
1957-05-29 | Finished Drilling |
1957-05-29 | Well Mode changed to Drilled and Cased |
1957-05-31 | Drill Stem Test Performed |
1957-06-03 | Production Casing Operation Performed |
1957-06-05 | Perforation Treatment Performed - Bullet Perforation |
1957-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-06-27 | Perforation Treatment Performed - Cement Plug |
1957-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-07-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-07-05 | Drill Stem Test Performed |
1957-07-05 | Perforation Treatment Performed - Selective Bullet Perforations |
1957-07-07 | Perforation Treatment Performed - Cement Plug |
1957-07-09 | Drill Stem Test Performed |
1957-07-09 | Perforation Treatment Performed - Selective Bullet Perforations |
1957-07-10 | Drill Stem Test Performed |
1957-07-10 | Perforation Treatment Performed - Bullet Perforation |
1957-07-11 | Perforation Treatment Performed - Cement Squeeze |
1957-07-12 | Perforation Treatment Performed - Bullet Perforation |
1957-07-13 | Drill Stem Test Performed |
1957-07-14 | Drill Stem Test Performed |
1957-07-14 | Perforation Treatment Performed - Bullet Perforation |
1957-07-15 | Perforation Treatment Performed - Bullet Perforation |
1957-07-15 | Perforation Treatment Performed - Cement Squeeze |
1957-07-15 | Perforation Treatment Performed - Selective Bullet Perforations |
1957-07-20 | Perforation Treatment Performed - Bullet Perforation |
1957-07-22 | Drill Stem Test Performed |
1957-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-08-27 | Perforation Treatment Performed - Cement Plug |
1969-08-28 | Well Fluid changed to Gas |
1969-08-28 | Well Mode changed to Testing |
1969-08-29 | Well Fluid changed to Gas |
1969-08-29 | Well Mode changed to Abandoned Zone |
1970-04-06 | Perforation Treatment Performed - Jet Perforation |
1970-04-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1970-04-11 | Perforation Treatment Performed - Fractured |
1980-08-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-08-08 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-06-05 | Bullet Perforation | 2656.00 | 2693.20 | 13 |
1957-07-11 | Cement Squeeze | 2227.80 | 2250.30 | 0 |
1957-07-12 | Bullet Perforation | 2247.00 | 2250.00 | 13 |
1957-07-14 | Bullet Perforation | 2267.70 | 2270.80 | 13 |
1957-07-15 | Bullet Perforation | 2267.70 | 2270.80 | 13 |
1957-07-15 | Selective Bullet Perforations | 2271.40 | 2271.40 | 0 |
1957-07-15 | Bullet Perforation | 2247.00 | 2250.00 | 13 |
1957-07-15 | Cement Squeeze | 2232.10 | 2270.80 | 0 |
1957-07-20 | Bullet Perforation | 2654.50 | 2667.90 | 13 |
1957-07-24 | Acid Treatment | 2653.30 | 2667.90 | 0 |
1969-08-27 | Cement Plug | 2546.60 | 2616.70 | 0 |
1957-06-13 | Acid Treatment | 2656.00 | 2693.20 | 0 |
1970-04-06 | Perforation | 2267.70 | 2273.80 | 7 |
1970-04-11 | Acid Wash | 2267.70 | 2273.80 | 0 |
1970-04-11 | Fracture | 2267.70 | 2273.80 | 0 |
1980-08-08 | Packing Device Capped w/Cement | 2232.00 | 2240.00 | 0 |
1957-06-27 | Cement Plug | 2681.00 | 2687.40 | 0 |
1957-06-29 | Acid Treatment | 2656.00 | 2681.00 | 0 |
1957-07-02 | Acid Treatment | 2656.00 | 2681.00 | 0 |
1957-07-05 | Selective Bullet Perforations | 2619.80 | 2619.80 | 0 |
1957-07-07 | Cement Plug | 2667.00 | 2681.30 | 0 |
1957-07-09 | Selective Bullet Perforations | 2240.90 | 2240.90 | 0 |
1957-07-10 | Bullet Perforation | 2235.40 | 2239.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]