X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0244293610000

Well Details

Well ID: 0244293610000
Loading map...
Location: 00/10-36-024-29W4/0
Location Alias: 00/10-36-24-29 W4M
Location Alias 2: 00/10-36-024-29 W4/00
Country: Canada
Province: Alberta
Township: 024
Meridian: 4
Range: 29
Section: 36
County/Municipality: Calgary
Well Name: WASCANA CROSSFIELD 10-36-24-29
Operator Name: CNOOC Petroleum North America ULC
License Number: 0008973
License Date: 1955-01-06
License Status: Abandoned
Spud Date: 1955-02-08
Final Drill Date: 1955-05-04
Well Total Depth: 2667.00 m
Surface Hole Latitude: 51.090556
Surface Hole Longitude: -113.920642

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-01-06 Obtained License
1955-03-12 Drill Stem Test Performed
1955-03-26 Drill Stem Test Performed
1955-03-30 Drill Stem Test Performed
1955-05-02 Drill Stem Test Performed
1955-05-04 Finished Drilling
1955-05-07 Production Casing Operation Performed
1955-05-11 Perforation Treatment Performed - Bullet Perforation
1955-05-11 Perforation Treatment Performed - Jet Perforation
1955-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-06-14 Well Mode changed to Drilled and Cased
1961-12-30 Well Began Production
1961-12-30 Well Fluid changed to Gas
1961-12-30 Well Mode changed to Flowing
1962-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-07 Perforation Treatment Performed - Fractured
2010-07-18 Well Log Performed
2010-07-21 Well Log Performed
2010-07-29 Perforation Treatment Performed - Chemical Squeeze
2010-07-30 Perforation Treatment Performed - Cement Plug
2010-07-30 Plug Back Performed
2010-08-03 Perforation Treatment Performed - Jet Perforation
2010-08-03 Well Log Performed
2010-08-05 Perforation Treatment Performed - Cement Plug
2010-08-05 Perforation Treatment Performed - Jet Perforation
2010-08-05 Plug Back Performed
2010-08-07 Perforation Treatment Performed - Cement Plug
2010-08-07 Perforation Treatment Performed - Chemical Squeeze
2010-08-07 Plug Back Performed
2010-08-09 Perforation Treatment Performed - Cement Plug
2010-08-09 Perforation Treatment Performed - Chemical Squeeze
2010-08-09 Plug Back Performed
2010-08-10 Perforation Treatment Performed - Jet Perforation
2010-08-10 Well Log Performed
2010-08-11 Perforation Treatment Performed - Cement Plug
2010-08-11 Plug Back Performed
2010-08-12 Perforation Treatment Performed - Jet Perforation
2010-08-12 Well Log Performed
2010-08-14 Perforation Treatment Performed - Cement Plug
2010-08-14 Plug Back Performed
2010-08-14 Well Fluid changed to Gas
2010-08-14 Well Mode changed to Abandoned Zone
2010-10-20 Well Abandoned
2010-10-20 Well Fluid changed to Gas
2010-10-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-05-11 Perforation 2610.00 2640.50 7
1963-08-02 Acid Treatment 2610.00 2640.50 0
1989-11-07 Fracture 2610.00 2640.50 0
2010-07-29 Chemical Squeeze 2610.00 2640.50 0
2010-07-30 Cement Plug 2316.90 2599.50 0
2010-08-03 Perforation 1676.00 1680.00 17
2010-08-03 Perforation 1626.00 1630.00 17
2010-08-05 Cement Plug 1404.50 1699.00 0
2010-08-05 Perforation 1310.00 1314.00 17
2010-08-05 Perforation 1000.00 1004.00 17
2010-08-07 Chemical Squeeze 1310.00 1314.00 0
1955-05-11 Bullet Perforation 2610.00 2640.50 7
2010-08-07 Cement Plug 1246.00 1302.00 0
2010-08-09 Chemical Squeeze 1000.00 1004.00 0
2010-08-09 Cement Plug 962.10 991.50 0
2010-08-10 Perforation 460.00 464.00 17
2010-08-11 Cement Plug 436.60 487.50 0
2010-08-12 Perforation 246.00 250.00 17
2010-08-12 Perforation 215.00 219.00 17
2010-08-12 Perforation 185.50 189.50 17
2010-08-14 Cement Plug 150.00 265.00 0
1955-05-21 Acid Treatment 2610.00 2640.50 0
1955-06-06 Acid Treatment 2610.00 2640.50 0
1962-03-22 Acid Treatment 2610.00 2640.50 0
1962-03-31 Acid Treatment 2610.00 2640.50 0
1962-06-06 Acid Treatment 2610.00 2640.50 0
1963-04-03 Acid Treatment 2610.00 2640.50 0
1963-05-07 Acid Treatment 2610.00 2640.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1154 0.0 0.0 0.0
1969 3953 0.0 0.0 0.0
1970 4395 0.0 0.0 0.0
1971 5197 0.0 0.0 0.0
1972 5028 0.0 0.0 0.0
1973 7119 0.0 0.0 0.0
1974 6774 0.0 0.0 0.0
1975 8649 0.0 0.0 0.0
1976 8026 0.0 0.0 0.0
1977 8678 0.0 0.0 0.0
1978 6042 0.0 0.0 0.0
1979 8759 0.0 0.0 0.0
1980 8430 0.0 0.0 0.0
1981 8706 0.0 0.0 0.0
1982 7810 0.0 0.0 0.0
1983 8592 0.0 0.0 0.0
1984 8436 0.0 0.0 0.0
1985 8213 0.0 0.0 0.0
1986 8224 0.0 0.0 0.0
1987 8719 0.0 0.0 0.0
1988 8049 0.0 0.0 0.0
1989 7886 0.0 0.0 0.0
1990 8110 0.0 0.0 0.0
1991 8475 0.0 0.0 0.0
1992 7944 0.0 0.0 0.0
1993 8730 0.0 0.0 0.0
1994 8461 0.0 0.0 0.0
1995 8739 0.0 0.0 0.0
1996 8438 0.0 0.0 0.0
1997 8708 0.0 0.0 0.0
1998 8364 0.0 0.0 0.0
1999 6905 0.0 0.0 0.0
2000 4871 0.0 0.0 0.0
2001 7494 0.0 0.0 0.0
2002 7733 0.0 0.0 0.0
2003 8624 0.0 0.0 0.0
2004 8716 0.0 0.0 0.0
2005 8738 0.0 0.0 0.0
2006 8665 0.0 0.0 0.0
2007 6432 0.0 0.0 0.0
2008 5701 0.0 0.0 0.0
2009 10 0.0 0.0 0.0

For data sources see[5]

References