If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0254022211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.149569,"lon":-110.206956,"icon":""}]} |
| Location: 00/11-22-025-02W4/0 | |
| Location Alias: 00/11-22-25-02 W4M | |
| Location Alias 2: 00/11-22-025-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 025 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 22 | |
| County/Municipality: Municipal District of Acadia No. 34 | |
| Well Name: POCO ACADIA VALLEY 11-22-25-2 | |
| Operator Name: M.L. Cass Petroleum Corporation | |
| License Number: 0044362 | |
| License Date: 1972-11-30 | |
| License Status: RecCertified | |
| Spud Date: 1972-12-12 | |
| Final Drill Date: 1972-12-16 | |
| Well Total Depth: 989.10 m | |
| Surface Hole Latitude: 51.149569 | |
| Surface Hole Longitude: -110.206956 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1972-11-30 | Obtained License |
| 1972-12-16 | Finished Drilling |
| 1972-12-17 | Production Casing Operation Performed |
| 1973-02-07 | Perforation Treatment Performed - Bullet Perforation |
| 1973-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1973-02-11 | Perforation Treatment Performed - Bullet Perforation |
| 1973-07-13 | Well Mode changed to Drilled and Cased |
| 1978-09-07 | Perforation Treatment Performed - Jet Perforation |
| 1978-09-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-09-10 | Perforation Treatment Performed - Jet Perforation |
| 1978-10-07 | Well Began Production |
| 1978-10-07 | Well Fluid changed to Gas |
| 1978-10-07 | Well Mode changed to Flowing |
| 1983-12-14 | Perforation Treatment Performed - Jet Perforation |
| 1983-12-14 | Well Log Performed |
| 1986-03-01 | Well Fluid changed to Gas |
| 1986-03-01 | Well Mode changed to Suspended |
| 1994-12-08 | Well Fluid changed to Gas |
| 1994-12-08 | Well Mode changed to Flowing |
| 2000-09-28 | Well Fluid changed to Gas |
| 2000-09-28 | Well Mode changed to Closed |
| 2004-02-27 | Well Log Performed |
| 2004-02-28 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2004-02-28 | Perforation Treatment Performed - Remedial Casing |
| 2004-03-05 | Perforation Treatment Performed - Cement Plug |
| 2004-03-05 | Plug Back Performed |
| 2004-03-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2004-03-06 | Perforation Treatment Performed - Remedial Casing |
| 2004-03-25 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1973-02-07 | Bullet Perforation | 894.60 | 899.20 | 10 |
| 1983-12-14 | Perforation | 724.80 | 726.60 | 7 |
| 2004-02-28 | Hydra Jet Perforation | 349.00 | 349.50 | 0 |
| 2004-02-28 | Remedial Casing Cementing | 349.00 | 349.50 | 0 |
| 2004-03-05 | Cement Plug | 150.00 | 250.00 | 0 |
| 2004-03-06 | Hydra Jet Perforation | 115.50 | 116.00 | 0 |
| 2004-03-06 | Remedial Casing Cementing | 115.50 | 116.00 | 0 |
| 1973-02-07 | Bullet Perforation | 908.30 | 911.40 | 10 |
| 1973-02-07 | Bullet Perforation | 926.60 | 929.60 | 10 |
| 1973-02-11 | Packing Device Capped w/Cement | 906.80 | 906.80 | 0 |
| 1973-02-11 | Packing Device Capped w/Cement | 888.50 | 888.50 | 0 |
| 1973-02-11 | Bullet Perforation | 724.20 | 725.40 | 13 |
| 1978-09-07 | Perforation | 728.50 | 728.80 | 13 |
| 1978-09-08 | Acid Treatment | 724.20 | 728.80 | 0 |
| 1978-09-10 | Perforation | 724.20 | 725.40 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1978 | 1767 | 0.0 | 0.0 | 0.0 |
| 1979 | 6089 | 0.0 | 0.0 | 0.0 |
| 1980 | 6679 | 0.0 | 0.0 | 0.0 |
| 1981 | 3074 | 0.0 | 0.0 | 0.0 |
| 1982 | 2717 | 0.0 | 0.0 | 0.0 |
| 1983 | 7562 | 0.0 | 0.0 | 0.0 |
| 1984 | 5552 | 0.0 | 0.0 | 0.0 |
| 1985 | 7928 | 0.0 | 0.0 | 0.0 |
| 1986 | 1442 | 0.0 | 0.0 | 0.0 |
| 1988 | 48 | 0.0 | 0.0 | 0.0 |
| 1994 | 513 | 0.0 | 0.0 | 0.0 |
| 1995 | 2097 | 0.0 | 0.0 | 0.0 |
For data sources see[5]