X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254022306000

Well Details

Well ID: 0254022306000
Loading map...
Location: 00/06-23-025-02W4/0
Location Alias: 00/06-23-25-02 W4M
Location Alias 2: 00/06-23-025-02 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 02
Section: 23
County/Municipality: Municipal District of Acadia No. 34
Well Name: POCO ARNESON 6-23-25-2
Operator Name: M.L. Cass Petroleum Corporation
License Number: 0089751
License Date: 1981-04-09
License Status: RecCertified
Spud Date: 1981-04-23
Final Drill Date: 1981-04-26
Well Total Depth: 1021.00 m
Surface Hole Latitude: 51.146313
Surface Hole Longitude: -110.180162

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-04-09 Obtained License
1981-04-26 Finished Drilling
1981-04-26 Well Mode changed to Drilled and Cased
1981-04-27 Drill Stem Test Performed
1981-04-28 Drill Stem Test Performed
1981-04-29 Production Casing Operation Performed
1981-05-04 Perforation Treatment Performed - Jet Perforation
1981-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-05-06 Perforation Treatment Performed - Jet Perforation
1981-11-07 Well Began Production
1981-11-07 Well Fluid changed to Gas
1981-11-07 Well Mode changed to Flowing
1983-11-03 Perforation Treatment Performed - Fractured
1984-03-09 Well Fluid changed to Gas
1984-03-09 Well Mode changed to Suspended
1999-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-03 Plug Back Performed
1999-12-03 Well Fluid changed to Gas
1999-12-03 Well Mode changed to Abandoned Zone
2000-01-20 Well Abandoned
2000-01-20 Well Fluid changed to Gas
2000-01-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-05-04 Perforation 912.00 915.00 13
1981-05-05 Packing Device Capped w/Cement 901.00 909.00 0
1981-05-06 Perforation 888.00 892.00 10
1983-11-03 Fracture 888.00 892.00 0
1999-12-03 Packing Device Capped w/Cement 575.00 883.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1241 0.0 0.0 0.0
1982 2832 0.0 0.0 0.0
1983 712 0.0 0.0 0.0
1984 864 0.0 0.0 0.0

For data sources see[5]

References