X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254031502000

Well Details

Well ID: 0254031502000
Loading map...
Location: 00/02-15-025-03W4/0
Location Alias: 00/02-15-25-03 W4M
Location Alias 2: 00/02-15-025-03 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 03
Section: 15
County/Municipality: Municipal District of Acadia No. 34
Well Name: PENN WEST BIND 2-15-25-3
Operator Name: Obsidian Energy Ltd.
License Number: 0197885
License Date: 1997-02-11
License Status: Abandoned
Spud Date: 1997-03-07
Final Drill Date: 1997-03-13
Well Total Depth: 1156.00 m
Surface Hole Latitude: 51.128501
Surface Hole Longitude: -110.338688

For data sources see[1][2]

Well History

Date Event
1997-02-11 Obtained License
1997-03-08 Surface Casing Operation Performed
1997-03-13 Finished Drilling
1997-03-13 Well Log Performed
1997-03-13 Well Mode changed to Drilled and Cased
1997-03-14 Production Casing Operation Performed
1997-03-14 Rig Released
1997-05-08 Perforation Treatment Performed - Jet Perforation
1997-05-08 Well Log Performed
1997-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-09 Perforation Treatment Performed - Jet Perforation
1997-05-09 Plug Back Performed
1997-05-09 Well Log Performed
1997-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-10 Well Log Performed
1997-05-11 Perforation Treatment Performed - Jet Perforation
1997-05-11 Well Log Performed
1997-05-15 Well Began Production
1997-05-15 Well Fluid changed to Gas
1997-05-15 Well Mode changed to Flowing
1999-05-12 Well Fluid changed to Gas
1999-05-12 Well Mode changed to Flowing
2000-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-08 Plug Back Performed
2000-12-08 Well Fluid changed to Gas
2000-12-08 Well Log Performed
2000-12-08 Well Mode changed to Abandoned Zone
2000-12-09 Perforation Treatment Performed - Jet Perforation
2012-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-05 Plug Back Performed
2012-06-26 Perforation Treatment Performed - Jet Perforation
2012-06-29 Perforation Treatment Performed - Jet Perforation
2012-07-01 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2012-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-08 Perforation 1095.80 1096.50 13
2012-06-05 Packing Device Capped w/Cement 827.00 835.00 0
2012-06-26 Perforation 842.00 843.00 14
2012-06-29 Perforation 912.00 916.00 14
2012-06-29 Perforation 923.80 925.30 14
2012-06-29 Perforation 928.00 933.00 14
2012-06-29 Perforation 943.00 946.00 14
2012-07-01 Packing Dev Cpd w/Res-Gyp Cem 924.50 927.50 0
2012-07-02 Packing Device Capped w/Cement 912.00 920.00 0
2012-07-02 Packing Device Capped w/Cement 897.00 905.00 0
2012-07-04 Packing Device Capped w/Cement 822.00 830.00 0
1997-05-09 Packing Device Capped w/Cement 1086.00 1094.00 0
1997-05-09 Perforation 943.00 946.00 14
1997-05-09 Perforation 928.00 933.00 14
1997-05-10 Acid Treatment 928.00 946.00 0
1997-05-11 Perforation 923.80 925.30 14
1997-05-11 Perforation 912.00 916.00 14
2000-12-08 Packing Device Capped w/Cement 886.00 895.00 0
2000-12-09 Perforation 842.00 843.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4789 0.0 0.0 0.0
1998 3972 0.0 0.0 0.0
1999 6783 0.0 0.0 0.0
2000 7444 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-05 No Incident Encountered 0.00 0.00
2012-07-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References