X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254112911000

Well Details

Well ID: 0254112911000
Loading map...
Location: 00/11-29-025-11W4/0
Location Alias: 00/11-29-25-11 W4M
Location Alias 2: 00/11-29-025-11 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 11
Section: 29
County/Municipality: Special Areas No. 2
Well Name: SUCSSRSC SUCCESS CESS 11-29-25-11
Operator Name: Success Resources Ltd.
License Number: 0305134
License Date: 2004-03-03
License Status: Suspension
Spud Date: 2004-05-21
Final Drill Date: 2004-05-23
Well Total Depth: 1066.00 m
Surface Hole Latitude: 51.163998
Surface Hole Longitude: -111.508392

For data sources see[1][2]

Well History

Date Event
2004-03-03 Obtained License
2004-05-22 Surface Casing Operation Performed
2004-05-23 Finished Drilling
2004-05-23 Well Log Performed
2004-05-23 Well Mode changed to Drilled and Cased
2004-05-24 Production Casing Operation Performed
2004-05-24 Rig Released
2004-05-24 Well Log Performed
2004-06-10 Perforation Treatment Performed - Jet Perforation
2004-06-10 Well Log Performed
2004-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-11 Perforation Treatment Performed - Jet Perforation
2004-06-11 Plug Back Performed
2004-06-11 Well Log Performed
2004-06-11 Well Mode changed to Abandoned Zone
2010-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-10 Perforation Treatment Performed - Jet Perforation
2010-01-10 Plug Back Performed
2010-01-12 Perforation Treatment Performed - Fractured
2011-11-08 Perforation Treatment Performed - Cement Squeeze
2011-11-08 Plug Back Performed
2011-11-14 Perforation Treatment Performed - Jet Perforation
2011-12-21 Perforation Treatment Performed - Fractured
2012-11-06 Perforation Treatment Performed - Cement Squeeze
2012-11-06 Plug Back Performed
2012-11-19 Perforation Treatment Performed - Cement Squeeze
2012-11-19 Perforation Treatment Performed - Jet Perforation
2012-11-19 Plug Back Performed
2012-11-24 Perforation Treatment Performed - Jet Perforation
2012-11-27 Perforation Treatment Performed - Cement Squeeze
2012-11-27 Plug Back Performed
2012-12-01 Perforation Treatment Performed - Jet Perforation
2012-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-12-02 Perforation Treatment Performed - Jet Perforation
2012-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-12-06 Perforation Treatment Performed - Jet Perforation
2012-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-12-08 Perforation Treatment Performed - Jet Perforation
2014-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-06 Perforation Treatment Performed - Jet Perforation
2014-03-06 Well Log Performed
2017-07-19 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-06-10 Perforation 1044.00 1045.00 14
2011-11-14 Perforation 852.60 853.60 17
2011-12-21 Fracture 852.60 853.60 0
2012-11-06 Cement Squeeze 852.60 856.90 0
2012-11-19 Perforation 1007.00 1011.00 14
2012-11-19 Cement Squeeze 1007.00 1011.00 0
2012-11-24 Perforation 1044.00 1045.00 14
2012-11-27 Cement Squeeze 1044.00 1045.00 0
2012-12-01 Perforation 1049.00 1050.00 17
2012-12-02 Perforation 1051.90 1052.90 17
2012-12-02 Acid Treatment 1051.90 1052.90 0
2004-06-11 Packing Device Capped w/Cement 1032.50 1040.50 0
2012-12-06 Packing Device Capped w/Cement 1039.50 1047.50 0
2012-12-06 Perforation 1028.00 1029.00 17
2012-12-08 Packing Device Capped w/Cement 1024.00 1027.00 0
2012-12-08 Perforation 1016.00 1017.00 17
2014-03-06 Packing Device Capped w/Cement 1006.00 1014.00 0
2014-03-06 Perforation 979.50 981.50 20
2017-07-19 Perforation 726.00 728.00 17
2017-07-19 Perforation 673.50 676.50 17
2017-07-19 Perforation 616.00 619.00 17
2017-07-19 Perforation 611.00 614.00 17
2004-06-11 Perforation 1007.00 1011.00 14
2017-07-19 Perforation 569.00 572.00 17
2017-07-19 Perforation 529.50 531.50 17
2017-07-19 Perforation 482.00 485.00 17
2017-07-19 Perforation 445.00 458.00 17
2017-07-19 Perforation 432.00 435.00 17
2010-01-10 Packing Device Capped w/Cement 995.00 1003.00 0
2010-01-10 Perforation 305.50 307.50 17
2010-01-10 Perforation 316.70 317.70 17
2010-01-12 Fracture 305.50 317.70 0
2011-11-08 Cement Squeeze 305.50 317.50 0
2011-11-14 Perforation 855.90 856.90 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-11-08 No Incident Encountered 0.00 0.00
2011-12-21 No Incident Encountered 0.00 0.00
2012-11-06 No Incident Encountered 0.00 0.00
2014-03-06 No Incident Encountered 0.00 0.00
2017-07-19 No Incident Encountered 0.00 0.00

For data sources see[5]

References