If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254270204002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.096632,"lon":-113.677707,"icon":""}]} |
Location: 00/04-02-025-27W4/2 | |
Location Alias: 00/04-02-25-27 W4M | |
Location Alias 2: 00/04-02-025-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 27 | |
Section: 02 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 4-2-25-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0249495 | |
License Date: 2001-01-22 | |
License Status: Issued | |
Spud Date: 2001-03-03 | |
Final Drill Date: 2001-03-05 | |
Well Total Depth: 1135.00 m | |
Surface Hole Latitude: 51.096632 | |
Surface Hole Longitude: -113.677707 |
Date | Event |
---|---|
2001-01-22 | Obtained License |
2001-03-04 | Surface Casing Operation Performed |
2001-03-05 | Finished Drilling |
2001-03-05 | Production Casing Operation Performed |
2001-03-05 | Rig Released |
2001-03-05 | Well Mode changed to Drilled and Cased |
2001-03-12 | Well Log Performed |
2001-03-15 | Well Log Performed |
2001-03-21 | Perforation Treatment Performed - Jet Perforation |
2001-03-23 | Perforation Treatment Performed - Jet Perforation |
2001-04-12 | Perforation Treatment Performed - Jet Perforation |
2001-05-03 | Perforation Treatment Performed - Fractured |
2009-02-14 | Perforation Treatment Performed - Jet Perforation |
2009-03-08 | Perforation Treatment Performed - Fractured |
2009-03-13 | Well Fluid changed to Gas |
2009-03-13 | Well Mode changed to Testing |
2009-03-21 | Well Began Production |
2009-03-21 | Well Fluid changed to Gas |
2009-03-21 | Well Mode changed to Flowing |
2011-08-06 | Perforation Treatment Performed - Jet Perforation |
2011-08-27 | Perforation Treatment Performed - Fractured |
2011-09-13 | Perforation Treatment Performed - Jet Perforation |
2011-09-18 | Perforation Treatment Performed - Fractured |
2011-10-21 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-03-21 | Perforation | 938.00 | 941.00 | 7 |
2011-08-27 | Fracture | 626.50 | 628.50 | 0 |
2011-08-27 | Fracture | 298.50 | 299.50 | 0 |
2011-08-27 | Fracture | 264.50 | 266.50 | 0 |
2011-09-13 | Perforation | 650.60 | 652.10 | 13 |
2011-09-13 | Perforation | 664.30 | 665.30 | 13 |
2011-09-13 | Perforation | 649.40 | 649.90 | 13 |
2011-09-13 | Perforation | 575.40 | 576.40 | 13 |
2011-09-13 | Perforation | 598.90 | 600.40 | 13 |
2011-09-13 | Perforation | 674.20 | 675.10 | 13 |
2011-09-13 | Perforation | 375.50 | 377.50 | 13 |
2001-03-23 | Perforation | 808.00 | 811.00 | 7 |
2011-09-13 | Perforation | 414.00 | 416.00 | 13 |
2011-09-13 | Perforation | 712.40 | 713.40 | 13 |
2011-09-13 | Perforation | 675.70 | 677.10 | 13 |
2011-09-13 | Perforation | 682.80 | 683.30 | 13 |
2011-09-13 | Perforation | 422.30 | 423.30 | 13 |
2011-09-13 | Perforation | 428.10 | 428.60 | 13 |
2011-09-13 | Perforation | 373.30 | 373.80 | 13 |
2011-09-13 | Perforation | 290.80 | 291.80 | 13 |
2011-09-13 | Perforation | 300.90 | 301.90 | 13 |
2011-09-13 | Perforation | 523.50 | 524.00 | 13 |
2001-04-12 | Perforation | 799.00 | 802.00 | 7 |
2011-09-13 | Perforation | 546.30 | 546.80 | 13 |
2011-09-13 | Perforation | 564.60 | 565.10 | 13 |
2011-09-13 | Perforation | 544.10 | 544.60 | 13 |
2011-09-13 | Perforation | 532.40 | 533.40 | 13 |
2011-09-13 | Perforation | 539.10 | 540.10 | 13 |
2011-09-18 | Fracture | 290.80 | 713.40 | 0 |
2001-05-03 | Fracture | 799.00 | 811.00 | 0 |
2009-02-14 | Perforation | 580.00 | 583.00 | 13 |
2009-03-08 | Fracture | 580.00 | 583.00 | 0 |
2011-08-06 | Perforation | 626.50 | 628.50 | 13 |
2011-08-06 | Perforation | 264.50 | 266.50 | 13 |
2011-08-06 | Perforation | 298.50 | 299.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6863 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 6551 | 0.0 | 0.0 | 0.0 |
For data sources see[5]