If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254270302002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.099301,"lon":-113.686382,"icon":""}]} |
Location: 00/02-03-025-27W4/2 | |
Location Alias: 00/02-03-25-27 W4M | |
Location Alias 2: 00/02-03-025-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 27 | |
Section: 03 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 2-3-25-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0266047 | |
License Date: 2002-01-16 | |
License Status: Issued | |
Spud Date: 2002-01-18 | |
Final Drill Date: 2002-01-26 | |
Well Total Depth: 1121.00 m | |
Surface Hole Latitude: 51.099301 | |
Surface Hole Longitude: -113.686382 |
Date | Event |
---|---|
2002-01-16 | Obtained License |
2002-01-18 | Surface Casing Operation Performed |
2002-01-26 | Finished Drilling |
2002-01-26 | Production Casing Operation Performed |
2002-01-26 | Well Mode changed to Drilled and Cased |
2002-01-27 | Rig Released |
2002-02-06 | Well Log Performed |
2002-03-26 | Perforation Treatment Performed - Jet Perforation |
2002-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-13 | Plug Back Performed |
2002-06-15 | Perforation Treatment Performed - Jet Perforation |
2002-07-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-03 | Plug Back Performed |
2002-07-03 | Well Mode changed to Abandoned Zone |
2002-07-06 | Perforation Treatment Performed - Jet Perforation |
2002-07-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-31 | Plug Back Performed |
2002-08-09 | Perforation Treatment Performed - Jet Perforation |
2002-08-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-08-17 | Plug Back Performed |
2002-08-19 | Perforation Treatment Performed - Jet Perforation |
2002-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-09-29 | Perforation Treatment Performed - Jet Perforation |
2003-02-15 | Perforation Treatment Performed - Fractured |
2005-11-22 | Perforation Treatment Performed - Jet Perforation |
2006-01-29 | Perforation Treatment Performed - Jet Perforation |
2006-02-02 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-03-26 | Perforation | 1013.50 | 1015.50 | 7 |
2002-09-22 | Acid Treatment | 293.00 | 295.00 | 0 |
2002-09-29 | Perforation | 268.00 | 274.00 | 7 |
2003-02-15 | Fracture | 268.00 | 274.00 | 0 |
2005-11-22 | Perforation | 602.00 | 605.00 | 7 |
2006-01-29 | Perforation | 728.10 | 728.60 | 13 |
2006-01-29 | Perforation | 727.20 | 727.70 | 13 |
2006-01-29 | Perforation | 724.70 | 725.20 | 13 |
2006-01-29 | Perforation | 706.00 | 707.00 | 13 |
2006-01-29 | Perforation | 694.40 | 694.90 | 13 |
2006-01-29 | Perforation | 686.90 | 687.40 | 13 |
2002-06-13 | Packing Device Capped w/Cement | 1002.00 | 1010.00 | 0 |
2006-01-29 | Perforation | 685.70 | 686.20 | 13 |
2006-01-29 | Perforation | 663.50 | 664.00 | 13 |
2006-01-29 | Perforation | 660.30 | 660.80 | 13 |
2006-01-29 | Perforation | 649.50 | 650.00 | 13 |
2006-01-29 | Perforation | 635.10 | 635.60 | 13 |
2006-01-29 | Perforation | 590.30 | 590.80 | 13 |
2006-01-29 | Perforation | 589.40 | 589.90 | 13 |
2006-01-29 | Perforation | 582.90 | 583.40 | 13 |
2006-01-29 | Perforation | 576.20 | 576.70 | 13 |
2006-01-29 | Perforation | 557.10 | 557.60 | 13 |
2002-06-15 | Perforation | 874.50 | 876.50 | 7 |
2006-01-29 | Perforation | 556.10 | 556.60 | 13 |
2006-01-29 | Perforation | 550.50 | 551.00 | 13 |
2006-01-29 | Perforation | 543.70 | 544.20 | 13 |
2006-01-29 | Perforation | 534.80 | 535.30 | 13 |
2006-01-29 | Perforation | 475.40 | 475.90 | 13 |
2006-01-29 | Perforation | 431.00 | 431.50 | 13 |
2006-01-29 | Perforation | 410.90 | 411.40 | 13 |
2006-01-29 | Perforation | 376.30 | 376.80 | 13 |
2006-01-29 | Perforation | 351.20 | 351.70 | 13 |
2006-01-29 | Perforation | 303.90 | 304.40 | 13 |
2002-07-03 | Packing Device Capped w/Cement | 856.00 | 864.00 | 0 |
2006-02-02 | Fracture | 303.90 | 728.60 | 0 |
2002-07-06 | Perforation | 780.00 | 784.00 | 7 |
2002-07-31 | Packing Device Capped w/Cement | 767.00 | 775.00 | 0 |
2002-08-09 | Perforation | 602.00 | 605.00 | 7 |
2002-08-17 | Packing Device Capped w/Cement | 590.00 | 598.00 | 0 |
2002-08-19 | Perforation | 293.00 | 295.00 | 7 |
For data sources see[4]