X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254270302002

Well Details

Well ID: 0254270302002
Loading map...
Location: 00/02-03-025-27W4/2
Location Alias: 00/02-03-25-27 W4M
Location Alias 2: 00/02-03-025-27 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 27
Section: 03
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 2-3-25-27
Operator Name: Ember Resources Inc.
License Number: 0266047
License Date: 2002-01-16
License Status: Issued
Spud Date: 2002-01-18
Final Drill Date: 2002-01-26
Well Total Depth: 1121.00 m
Surface Hole Latitude: 51.099301
Surface Hole Longitude: -113.686382

For data sources see[1][2]

Well History

Date Event
2002-01-16 Obtained License
2002-01-18 Surface Casing Operation Performed
2002-01-26 Finished Drilling
2002-01-26 Production Casing Operation Performed
2002-01-26 Well Mode changed to Drilled and Cased
2002-01-27 Rig Released
2002-02-06 Well Log Performed
2002-03-26 Perforation Treatment Performed - Jet Perforation
2002-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-13 Plug Back Performed
2002-06-15 Perforation Treatment Performed - Jet Perforation
2002-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-03 Plug Back Performed
2002-07-03 Well Mode changed to Abandoned Zone
2002-07-06 Perforation Treatment Performed - Jet Perforation
2002-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-31 Plug Back Performed
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-17 Plug Back Performed
2002-08-19 Perforation Treatment Performed - Jet Perforation
2002-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-29 Perforation Treatment Performed - Jet Perforation
2003-02-15 Perforation Treatment Performed - Fractured
2005-11-22 Perforation Treatment Performed - Jet Perforation
2006-01-29 Perforation Treatment Performed - Jet Perforation
2006-02-02 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-26 Perforation 1013.50 1015.50 7
2002-09-22 Acid Treatment 293.00 295.00 0
2002-09-29 Perforation 268.00 274.00 7
2003-02-15 Fracture 268.00 274.00 0
2005-11-22 Perforation 602.00 605.00 7
2006-01-29 Perforation 728.10 728.60 13
2006-01-29 Perforation 727.20 727.70 13
2006-01-29 Perforation 724.70 725.20 13
2006-01-29 Perforation 706.00 707.00 13
2006-01-29 Perforation 694.40 694.90 13
2006-01-29 Perforation 686.90 687.40 13
2002-06-13 Packing Device Capped w/Cement 1002.00 1010.00 0
2006-01-29 Perforation 685.70 686.20 13
2006-01-29 Perforation 663.50 664.00 13
2006-01-29 Perforation 660.30 660.80 13
2006-01-29 Perforation 649.50 650.00 13
2006-01-29 Perforation 635.10 635.60 13
2006-01-29 Perforation 590.30 590.80 13
2006-01-29 Perforation 589.40 589.90 13
2006-01-29 Perforation 582.90 583.40 13
2006-01-29 Perforation 576.20 576.70 13
2006-01-29 Perforation 557.10 557.60 13
2002-06-15 Perforation 874.50 876.50 7
2006-01-29 Perforation 556.10 556.60 13
2006-01-29 Perforation 550.50 551.00 13
2006-01-29 Perforation 543.70 544.20 13
2006-01-29 Perforation 534.80 535.30 13
2006-01-29 Perforation 475.40 475.90 13
2006-01-29 Perforation 431.00 431.50 13
2006-01-29 Perforation 410.90 411.40 13
2006-01-29 Perforation 376.30 376.80 13
2006-01-29 Perforation 351.20 351.70 13
2006-01-29 Perforation 303.90 304.40 13
2002-07-03 Packing Device Capped w/Cement 856.00 864.00 0
2006-02-02 Fracture 303.90 728.60 0
2002-07-06 Perforation 780.00 784.00 7
2002-07-31 Packing Device Capped w/Cement 767.00 775.00 0
2002-08-09 Perforation 602.00 605.00 7
2002-08-17 Packing Device Capped w/Cement 590.00 598.00 0
2002-08-19 Perforation 293.00 295.00 7

For data sources see[4]



References