If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254272304000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.140093,"lon":-113.677684,"icon":""}]} |
Location: 00/04-23-025-27W4/0 | |
Location Alias: 00/04-23-25-27 W4M | |
Location Alias 2: 00/04-23-025-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 27 | |
Section: 23 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 4-23-25-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0238093 | |
License Date: 2000-06-02 | |
License Status: Issued | |
Spud Date: 2000-06-16 | |
Final Drill Date: 2000-06-16 | |
Well Total Depth: 1121.00 m | |
Surface Hole Latitude: 51.140093 | |
Surface Hole Longitude: -113.677684 |
Date | Event |
---|---|
2000-06-02 | Obtained License |
2000-06-06 | Surface Casing Operation Performed |
2000-06-16 | Finished Drilling |
2000-06-17 | Production Casing Operation Performed |
2000-06-17 | Rig Released |
2000-06-17 | Well Mode changed to Drilled and Cased |
2000-06-27 | Well Log Performed |
2000-07-06 | Perforation Treatment Performed - Jet Perforation |
2000-07-20 | Well Log Performed |
2001-01-01 | Well Began Production |
2001-01-01 | Well Fluid changed to Gas |
2001-01-01 | Well Mode changed to Flowing |
2005-08-06 | Perforation Treatment Performed - Jet Perforation |
2005-09-27 | Perforation Treatment Performed - Fractured |
2006-01-18 | Well Log Performed |
2006-10-01 | Well Fluid changed to Gas |
2006-10-01 | Well Mode changed to Suspended |
2007-10-30 | Well Log Performed |
2008-09-17 | Well Log Performed |
2009-09-19 | Well Log Performed |
2010-12-04 | Well Log Performed |
2013-10-21 | Well Log Performed |
2017-04-24 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-07-06 | Perforation | 803.50 | 808.50 | 17 |
2005-08-06 | Perforation | 635.30 | 635.80 | 13 |
2005-08-06 | Perforation | 624.70 | 625.20 | 13 |
2005-08-06 | Perforation | 605.00 | 605.50 | 13 |
2005-08-06 | Perforation | 585.40 | 585.90 | 13 |
2005-08-06 | Perforation | 577.20 | 577.70 | 13 |
2005-08-06 | Perforation | 560.00 | 560.50 | 13 |
2005-08-06 | Perforation | 553.40 | 553.90 | 13 |
2005-08-06 | Perforation | 551.90 | 552.40 | 13 |
2005-08-06 | Perforation | 550.80 | 551.30 | 13 |
2005-08-06 | Perforation | 542.20 | 542.70 | 13 |
2000-07-06 | Perforation | 797.00 | 800.00 | 17 |
2005-08-06 | Perforation | 540.50 | 541.00 | 13 |
2005-08-06 | Perforation | 476.30 | 476.80 | 13 |
2005-08-06 | Perforation | 470.50 | 471.00 | 13 |
2005-08-06 | Perforation | 428.90 | 429.40 | 13 |
2005-08-06 | Perforation | 412.30 | 412.80 | 13 |
2005-08-06 | Perforation | 397.20 | 397.70 | 13 |
2005-08-06 | Perforation | 292.90 | 293.40 | 13 |
2005-08-06 | Perforation | 275.90 | 276.40 | 13 |
2005-08-06 | Perforation | 266.90 | 267.40 | 13 |
2005-08-06 | Perforation | 243.40 | 243.90 | 13 |
2000-07-06 | Perforation | 790.00 | 791.00 | 17 |
2005-09-27 | Fracture | 243.40 | 713.80 | 0 |
2005-08-06 | Perforation | 713.30 | 713.80 | 13 |
2005-08-06 | Perforation | 691.90 | 692.40 | 13 |
2005-08-06 | Perforation | 680.90 | 681.40 | 13 |
2005-08-06 | Perforation | 673.90 | 674.40 | 13 |
2005-08-06 | Perforation | 649.20 | 649.70 | 13 |
2005-08-06 | Perforation | 643.50 | 644.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 8419 | 0.0 | 0.0 | 0.0 |
2002 | 8692 | 0.0 | 0.0 | 0.0 |
2003 | 8727 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 5124 | 0.0 | 0.0 | 0.0 |
For data sources see[5]