If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0255031804000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.138748,"lon":-114.421219,"icon":""}]} |
Location: 00/04-18-025-03W5/0 | |
Location Alias: 00/04-18-25-03 W5M | |
Location Alias 2: 00/04-18-025-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 5 | |
Range: 03 | |
Section: 18 | |
County/Municipality: Rocky View County | |
Well Name: TRIOIL HZ LOCHEND 4-18-25-3 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0464907 | |
License Date: 2014-02-11 | |
License Status: Abandoned | |
Spud Date: 2014-07-03 | |
Final Drill Date: 2014-07-19 | |
Well Total Depth: 3709.00 m | |
Surface Hole Latitude: 51.138748 | |
Surface Hole Longitude: -114.421219 |
Date | Event |
---|---|
2014-02-11 | Obtained License |
2014-07-05 | Surface Casing Operation Performed |
2014-07-09 | Direction Drilling Operation Performed - Deviate |
2014-07-11 | Direction Drilling Operation Performed - Horizontal |
2014-07-11 | Well Log Performed |
2014-07-19 | Finished Drilling |
2014-07-19 | Well Log Performed |
2014-07-19 | Well Mode changed to Drilled and Cased |
2014-07-21 | Production Casing Operation Performed |
2014-07-22 | Rig Released |
2014-08-01 | Well Log Performed |
2014-08-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-09 | Perforation Treatment Performed - Open-Hole Completion |
2014-08-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-08-09 | Perforation Treatment Performed - Cement Plug |
2015-08-09 | Plug Back Performed |
2015-08-09 | Well Mode changed to Abandoned Zone |
2015-08-12 | Well Abandoned |
2015-08-12 | Well Mode changed to Abandoned |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-07-03 | Trinidad Drilling Ltd. | 94 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-07-09 | 1983.08 | Deviate (5 - 79 degrees) |
2014-07-11 | 2386.44 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-08-09 | Open Hole/Barefoot Completion | 3693.50 | 3709.00 | 0 |
2014-08-09 | Multi-Stage Fracture | 3303.90 | 3304.00 | 0 |
2014-08-10 | Multi-Stage Fracture | 3260.00 | 3260.10 | 0 |
2014-08-10 | Multi-Stage Fracture | 3214.70 | 3214.80 | 0 |
2014-08-10 | Multi-Stage Fracture | 3170.40 | 3170.50 | 0 |
2014-08-10 | Multi-Stage Fracture | 3125.80 | 3125.90 | 0 |
2014-08-10 | Multi-Stage Fracture | 3081.30 | 3081.40 | 0 |
2014-08-11 | Multi-Stage Fracture | 2994.80 | 2994.90 | 0 |
2014-08-11 | Multi-Stage Fracture | 2949.50 | 2949.60 | 0 |
2014-08-11 | Multi-Stage Fracture | 2904.70 | 2904.80 | 0 |
2014-08-12 | Multi-Stage Fracture | 2860.80 | 2860.90 | 0 |
2014-08-09 | Multi-Stage Fracture | 3656.90 | 3657.00 | 0 |
2014-08-12 | Multi-Stage Fracture | 2816.40 | 2816.50 | 0 |
2014-08-12 | Multi-Stage Fracture | 2771.20 | 2771.30 | 0 |
2014-08-12 | Multi-Stage Fracture | 2730.20 | 2730.30 | 0 |
2014-08-12 | Multi-Stage Fracture | 2685.30 | 2685.40 | 0 |
2014-08-12 | Multi-Stage Fracture | 2646.80 | 2646.90 | 0 |
2014-08-12 | Multi-Stage Fracture | 2603.00 | 2603.10 | 0 |
2014-08-12 | Multi-Stage Fracture | 2571.30 | 2571.40 | 0 |
2014-08-12 | Multi-Stage Fracture | 2540.90 | 2541.00 | 0 |
2014-08-12 | Multi-Stage Fracture | 2510.70 | 2510.80 | 0 |
2014-08-12 | Multi-Stage Fracture | 2480.30 | 2480.40 | 0 |
2014-08-09 | Multi-Stage Fracture | 3612.70 | 3612.80 | 0 |
2014-08-12 | Multi-Stage Fracture | 2448.60 | 2448.70 | 0 |
2014-08-12 | Multi-Stage Fracture | 2418.30 | 2418.40 | 0 |
2014-08-12 | Multi-Stage Fracture | 2390.50 | 2390.60 | 0 |
2014-08-12 | Multi-Stage Fracture | 2359.10 | 2359.20 | 0 |
2015-08-09 | Cement Plug | 2297.00 | 2357.00 | 0 |
2014-08-09 | Multi-Stage Fracture | 3569.70 | 3569.80 | 0 |
2014-08-09 | Multi-Stage Fracture | 3525.30 | 3525.40 | 0 |
2014-08-09 | Multi-Stage Fracture | 3481.70 | 3481.80 | 0 |
2014-08-09 | Multi-Stage Fracture | 3437.50 | 3437.60 | 0 |
2014-08-09 | Multi-Stage Fracture | 3392.00 | 3392.10 | 0 |
2014-08-09 | Multi-Stage Fracture | 3346.70 | 3346.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-09 | 2014-08-12 | 2,270 | 3,324 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.9817 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.2972 | N/A | ||
20/40 SiberProp | Calfrac | Quartz | 14808-60-7 | 100 | 0.9383 | N/A | ||
15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 1.0118 | N/A | |
Water | 7732-18-5 | 100 | 1.0118 | N/A | ||||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0336 | N/A | |
Water | 7732-18-5 | 100 | 0.0346 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.3188 | N/A | |
DAP-925 | Calfrac | Corrosion Inhibitor | 2-Propyn-1-ol | 107-19-7 | 100 | 0.0088 | N/A | |
Fatty acids | 8462 | 100 | 0.003 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0022 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.003 | N/A | ||||
Olefin | 8462 | 100 | 0.0177 | N/A | ||||
Polyoxyalkylenes | 8462 | 100 | 0.0024 | N/A | ||||
DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.1258 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.1271 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1258 | N/A | ||||
Triethylene glycol | 112-27-6 | 100 | 0.1271 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1267 | N/A | ||||
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1752 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-07-31 | 2014-08-14 | Waste Water - Municipal | 3441 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-22 | No Incident Encountered | 0.00 | 0.00 |
2014-08-24 | No Incident Encountered | 0.00 | 0.00 |
2015-08-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]