If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264062807000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.246928,"lon":-110.781232,"icon":""}]} |
Location: 00/07-28-026-06W4/0 | |
Location Alias: 00/07-28-26-06 W4M | |
Location Alias 2: 00/07-28-026-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 06 | |
Section: 28 | |
County/Municipality: Special Areas No. 3 | |
Well Name: NUVISTA SHANNON 7-28-26-6 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0224660 | |
License Date: 1999-07-21 | |
License Status: Abandoned | |
Spud Date: 1999-09-08 | |
Final Drill Date: 1999-09-11 | |
Well Total Depth: 961.00 m | |
Surface Hole Latitude: 51.246928 | |
Surface Hole Longitude: -110.781232 |
Date | Event |
---|---|
1999-07-21 | Obtained License |
1999-09-08 | Surface Casing Operation Performed |
1999-09-11 | Finished Drilling |
1999-09-11 | Well Log Performed |
1999-09-12 | Production Casing Operation Performed |
1999-09-12 | Rig Released |
1999-09-12 | Well Mode changed to Drilled and Cased |
1999-09-15 | Well Log Performed |
1999-09-16 | Perforation Treatment Performed - Jet Perforation |
1999-09-16 | Well Log Performed |
1999-09-17 | Perforation Treatment Performed - Jet Perforation |
1999-09-17 | Well Log Performed |
1999-09-27 | Well Began Production |
1999-09-27 | Well Fluid changed to Gas |
1999-09-27 | Well Mode changed to Flowing |
2008-10-01 | Well Fluid changed to Gas |
2008-10-01 | Well Mode changed to Suspended |
2014-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-10-20 | Perforation Treatment Performed - Jet Perforation |
2014-10-20 | Plug Back Performed |
2014-10-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-10-24 | Perforation Treatment Performed - Jet Perforation |
2014-10-24 | Plug Back Performed |
2014-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-10-25 | Perforation Treatment Performed - Cement Squeeze |
2014-10-25 | Plug Back Performed |
2014-10-25 | Well Fluid changed to Gas |
2014-10-25 | Well Mode changed to Abandoned Zone |
2014-12-02 | Well Abandoned |
2014-12-02 | Well Fluid changed to Gas |
2014-12-02 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-09-16 | Perforation | 946.00 | 950.00 | 13 |
2014-10-24 | Perforation | 285.00 | 286.00 | 20 |
2014-10-24 | Perforation | 250.00 | 251.00 | 20 |
2014-10-24 | Perforation | 220.00 | 221.00 | 20 |
2014-10-24 | Packing Device Capped w/Cement | 307.00 | 315.00 | 0 |
2014-10-24 | Packing Device Capped w/Cement | 272.00 | 280.00 | 0 |
2014-10-25 | Packing Device Capped w/Cement | 237.00 | 245.00 | 0 |
2014-10-25 | Cement Squeeze | 220.00 | 221.00 | 0 |
1999-09-17 | Perforation | 929.00 | 930.50 | 13 |
1999-09-17 | Perforation | 932.00 | 936.50 | 13 |
2014-10-20 | Packing Device Capped w/Cement | 914.00 | 922.00 | 0 |
2014-10-20 | Perforation | 525.00 | 526.00 | 20 |
2014-10-20 | Packing Device Capped w/Cement | 512.00 | 520.00 | 0 |
2014-10-20 | Perforation | 500.00 | 501.00 | 20 |
2014-10-20 | Packing Device Capped w/Cement | 485.00 | 493.00 | 0 |
2014-10-24 | Perforation | 320.00 | 321.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 2257 | 0.0 | 0.0 | 0.0 |
2000 | 7717 | 0.0 | 0.0 | 0.0 |
2001 | 6769 | 0.0 | 0.0 | 0.0 |
2002 | 1779 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-10-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]