If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264101009000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.206464,"lon":-111.309142,"icon":""}]} |
Location: 00/09-10-026-10W4/0 | |
Location Alias: 00/09-10-26-10 W4M | |
Location Alias 2: 00/09-10-026-10 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 10 | |
Section: 10 | |
County/Municipality: Special Areas No. 2 | |
Well Name: SOC SUNNYN 9-10-26-10 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0112795 | |
License Date: 1985-01-23 | |
License Status: Issued | |
Spud Date: 1985-01-26 | |
Final Drill Date: 1985-01-31 | |
Well Total Depth: 1057.00 m | |
Surface Hole Latitude: 51.206464 | |
Surface Hole Longitude: -111.309142 |
Date | Event |
---|---|
1985-01-23 | Obtained License |
1985-01-27 | Surface Casing Operation Performed |
1985-01-31 | Finished Drilling |
1985-01-31 | Well Log Performed |
1985-02-01 | Drill Stem Test Performed |
1985-02-03 | Production Casing Operation Performed |
1985-02-03 | Rig Released |
1986-03-01 | Well Mode changed to Drilled and Cased |
1988-06-22 | Perforation Treatment Performed - Jet Perforation |
1988-06-22 | Well Log Performed |
1988-06-23 | Perforation Treatment Performed - Jet Perforation |
1988-06-23 | Well Log Performed |
1990-08-21 | Well Began Production |
1990-08-21 | Well Fluid changed to Gas |
1990-08-21 | Well Mode changed to Flowing |
1991-12-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-12-14 | Plug Back Performed |
1991-12-14 | Well Fluid changed to Gas |
1991-12-14 | Well Mode changed to Abandoned Zone |
1991-12-15 | Perforation Treatment Performed - Jet Perforation |
1996-06-05 | Perforation Treatment Performed - Jet Perforation |
1996-06-09 | Perforation Treatment Performed - Fractured |
2002-02-06 | Perforation Treatment Performed - Cement Squeeze |
2002-02-06 | Plug Back Performed |
2002-02-13 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-06-22 | Perforation | 1031.00 | 1032.00 | 13 |
2002-02-13 | Perforation | 1014.70 | 1016.00 | 20 |
1988-06-23 | Perforation | 1026.00 | 1027.00 | 13 |
1991-12-14 | Packing Device Capped w/Cement | 1000.70 | 1008.70 | 0 |
1991-12-15 | Perforation | 848.00 | 850.00 | 14 |
1996-06-05 | Perforation | 946.80 | 948.20 | 14 |
1996-06-09 | Fracture | 946.80 | 948.20 | 0 |
2002-02-06 | Cement Squeeze | 946.80 | 948.20 | 0 |
2002-02-06 | Cement Squeeze | 848.00 | 850.00 | 0 |
2002-02-13 | Perforation | 1007.50 | 1009.50 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 1444 | 0.0 | 0.0 | 0.0 |
1991 | 7282 | 0.0 | 0.0 | 0.0 |
1992 | 58 | 0.0 | 0.0 | 0.0 |
1996 | 221 | 0.0 | 0.0 | 0.0 |
For data sources see[5]