If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264111311024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.223381,"lon":-111.412533,"icon":""}]} |
Location: 02/11-13-026-11W4/4 | |
Location Alias: 02/11-13-26-11 W4M | |
Location Alias 2: 02/11-13-026-11 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 11 | |
Section: 13 | |
County/Municipality: Special Areas No. 2 | |
Well Name: SOC SUNNYN 11-13-26-11 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0272566 | |
License Date: 2002-08-12 | |
License Status: Suspension | |
Spud Date: 2002-08-16 | |
Final Drill Date: 2002-08-20 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 51.223381 | |
Surface Hole Longitude: -111.412533 |
Date | Event |
---|---|
2002-08-12 | Obtained License |
2002-08-17 | Surface Casing Operation Performed |
2002-08-19 | Well Log Performed |
2002-08-20 | Drill Stem Test Performed |
2002-08-20 | Finished Drilling |
2002-08-20 | Production Casing Operation Performed |
2002-08-20 | Well Mode changed to Drilled and Cased |
2002-08-21 | Rig Released |
2002-09-16 | Perforation Treatment Performed - Jet Perforation |
2002-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-18 | Perforation Treatment Performed - Jet Perforation |
2002-09-18 | Plug Back Performed |
2002-09-19 | Perforation Treatment Performed - Fractured |
2002-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-23 | Plug Back Performed |
2002-09-24 | Perforation Treatment Performed - Jet Perforation |
2002-09-27 | Perforation Treatment Performed - Jet Perforation |
2002-10-22 | Well Began Production |
2002-10-22 | Well Fluid changed to Gas |
2002-10-22 | Well Mode changed to Flowing |
2005-06-01 | Well Fluid changed to Gas |
2005-06-01 | Well Mode changed to Flowing |
2007-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-01 | Plug Back Performed |
2007-02-01 | Well Log Performed |
2007-02-03 | Perforation Treatment Performed - Jet Perforation |
2007-03-01 | Well Fluid changed to Gas |
2007-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-09-16 | Perforation | 1006.00 | 1007.00 | 20 |
2007-02-03 | Perforation | 844.50 | 846.00 | 17 |
2002-09-16 | Perforation | 1008.00 | 1008.50 | 20 |
2002-09-18 | Packing Device Capped w/Cement | 995.00 | 1003.00 | 0 |
2002-09-18 | Perforation | 985.00 | 989.00 | 20 |
2002-09-19 | Fracture | 985.00 | 989.00 | 0 |
2002-09-23 | Packing Device Capped w/Cement | 972.00 | 980.00 | 0 |
2002-09-24 | Perforation | 913.00 | 915.00 | 20 |
2002-09-27 | Perforation | 825.50 | 826.50 | 20 |
2007-02-01 | Packing Device Capped w/Cement | 852.00 | 860.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 1509 | 0.0 | 0.0 | 0.0 |
2003 | 7775 | 0.0 | 0.0 | 0.0 |
2004 | 5399 | 0.0 | 0.0 | 0.0 |
2005 | 4021 | 0.0 | 0.0 | 0.0 |
2006 | 507 | 0.0 | 0.0 | 0.0 |
For data sources see[5]