If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264253108002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.260018,"lon":-113.470707,"icon":""}]} |
Location: 00/08-31-026-25W4/2 | |
Location Alias: 00/08-31-26-25 W4M | |
Location Alias 2: 00/08-31-026-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 25 | |
Section: 31 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-31-26-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0217099 | |
License Date: 1998-08-20 | |
License Status: Issued | |
Spud Date: 1998-09-08 | |
Final Drill Date: 1998-09-09 | |
Well Total Depth: 1001.00 m | |
Surface Hole Latitude: 51.260018 | |
Surface Hole Longitude: -113.470707 |
Date | Event |
---|---|
1998-08-20 | Obtained License |
1998-09-09 | Finished Drilling |
1998-09-09 | Production Casing Operation Performed |
1998-09-09 | Rig Released |
1998-09-09 | Well Mode changed to Drilled and Cased |
1998-09-15 | Well Log Performed |
1998-10-10 | Perforation Treatment Performed - Jet Perforation |
1998-10-17 | Perforation Treatment Performed - Fractured |
2009-08-26 | Perforation Treatment Performed - Jet Perforation |
2009-09-11 | Well Fluid changed to Gas |
2009-09-11 | Well Mode changed to Testing |
2009-10-30 | Perforation Treatment Performed - Jet Perforation |
2009-11-09 | Perforation Treatment Performed - Fractured |
2009-11-24 | Well Began Production |
2009-11-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-10-10 | Perforation | 853.00 | 856.00 | 7 |
2009-10-30 | Perforation | 373.20 | 373.70 | 13 |
2009-10-30 | Perforation | 237.10 | 237.60 | 13 |
2009-10-30 | Perforation | 511.00 | 513.00 | 13 |
2009-10-30 | Perforation | 307.00 | 309.00 | 13 |
2009-10-30 | Perforation | 315.20 | 315.70 | 13 |
2009-10-30 | Perforation | 298.50 | 299.00 | 13 |
2009-10-30 | Perforation | 293.40 | 293.90 | 13 |
2009-10-30 | Perforation | 459.80 | 460.30 | 13 |
2009-10-30 | Perforation | 556.80 | 557.80 | 13 |
2009-10-30 | Perforation | 550.30 | 551.30 | 13 |
1998-10-17 | Fracture | 853.00 | 856.00 | 0 |
2009-10-30 | Perforation | 545.20 | 545.70 | 13 |
2009-10-30 | Perforation | 598.40 | 598.90 | 13 |
2009-10-30 | Perforation | 594.60 | 595.10 | 13 |
2009-10-30 | Perforation | 562.10 | 562.60 | 13 |
2009-10-30 | Perforation | 533.40 | 533.90 | 13 |
2009-10-30 | Perforation | 481.00 | 481.50 | 13 |
2009-10-30 | Perforation | 480.00 | 480.50 | 13 |
2009-10-30 | Perforation | 464.40 | 465.40 | 13 |
2009-10-30 | Perforation | 520.50 | 521.00 | 13 |
2009-10-30 | Perforation | 526.80 | 527.30 | 13 |
2009-08-26 | Perforation | 879.50 | 880.50 | 13 |
2009-10-30 | Perforation | 482.50 | 483.50 | 13 |
2009-11-09 | Fracture | 237.10 | 598.90 | 0 |
2009-10-30 | Perforation | 434.60 | 435.60 | 13 |
2009-10-30 | Perforation | 416.60 | 417.10 | 13 |
2009-10-30 | Perforation | 414.80 | 415.30 | 13 |
2009-10-30 | Perforation | 452.30 | 452.80 | 13 |
2009-10-30 | Perforation | 443.50 | 444.00 | 13 |
2009-10-30 | Perforation | 439.30 | 439.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 744 | 0.0 | 0.0 | 0.0 |
2010 | 8683 | 0.0 | 0.0 | 0.0 |
2011 | 8579 | 0.0 | 0.0 | 0.0 |
2012 | 4632 | 0.0 | 0.0 | 0.0 |
2013 | 8330 | 0.0 | 0.0 | 0.0 |
2014 | 8212 | 0.0 | 0.0 | 0.0 |
2015 | 8396 | 0.0 | 0.0 | 0.0 |
2016 | 8425 | 0.0 | 0.0 | 0.0 |
2017 | 7832 | 0.0 | 0.0 | 0.0 |
2018 | 8224 | 0.0 | 0.0 | 0.0 |
2019 | 7873 | 0.0 | 0.0 | 0.0 |
2020 | 1836 | 0.0 | 0.0 | 0.0 |
For data sources see[5]