If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264261116005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.210419,"lon":-113.520886,"icon":""}]} |
Location: 00/16-11-026-26W4/5 | |
Location Alias: 00/16-11-26-26 W4M | |
Location Alias 2: 00/16-11-026-26 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-11-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0212819 | |
License Date: 1998-01-30 | |
License Status: Issued | |
Spud Date: 1998-02-25 | |
Final Drill Date: 1998-03-03 | |
Well Total Depth: 1878.00 m | |
Surface Hole Latitude: 51.210419 | |
Surface Hole Longitude: -113.520886 |
Date | Event |
---|---|
1998-01-30 | Obtained License |
1998-02-25 | Well Log Performed |
1998-02-26 | Surface Casing Operation Performed |
1998-03-03 | Finished Drilling |
1998-03-03 | Well Mode changed to Drilled and Cased |
1998-03-04 | Well Log Performed |
1998-03-05 | Drill Stem Test Performed |
1998-03-07 | Production Casing Operation Performed |
1998-03-07 | Rig Released |
1998-03-16 | Well Log Performed |
1998-03-17 | Perforation Treatment Performed - Jet Perforation |
2001-10-02 | Perforation Treatment Performed - Jet Perforation |
2001-10-03 | Well Log Performed |
2002-03-03 | Perforation Treatment Performed - Jet Perforation |
2002-03-04 | Well Log Performed |
2002-05-28 | Perforation Treatment Performed - Fractured |
2003-04-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-04-24 | Plug Back Performed |
2003-04-24 | Well Log Performed |
2003-05-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-05-14 | Plug Back Performed |
2003-05-15 | Well Log Performed |
2003-06-07 | Perforation Treatment Performed - Jet Perforation |
2003-07-01 | Perforation Treatment Performed - Jet Perforation |
2003-07-29 | Perforation Treatment Performed - Jet Perforation |
2003-08-24 | Perforation Treatment Performed - Fractured |
2007-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-07-08 | Plug Back Performed |
2007-07-08 | Well Log Performed |
2007-07-09 | Perforation Treatment Performed - Jet Perforation |
2007-07-15 | Perforation Treatment Performed - Fractured |
2007-10-19 | Well Began Production |
2007-10-19 | Well Fluid changed to Coalbed Methane-Coals Only |
2007-10-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-03-17 | Perforation | 1802.00 | 1803.50 | 17 |
2003-07-29 | Perforation | 724.50 | 726.50 | 13 |
2003-08-24 | Fracture | 724.50 | 726.50 | 0 |
2007-07-08 | Packing Device Capped w/Cement | 919.00 | 927.00 | 0 |
2007-07-08 | Packing Device Capped w/Cement | 711.00 | 719.00 | 0 |
2007-07-09 | Perforation | 638.10 | 638.60 | 13 |
2007-07-09 | Perforation | 637.10 | 637.60 | 13 |
2007-07-09 | Perforation | 633.30 | 634.30 | 13 |
2007-07-09 | Perforation | 614.70 | 615.20 | 13 |
2007-07-09 | Perforation | 601.00 | 602.00 | 13 |
2007-07-09 | Perforation | 599.10 | 599.60 | 13 |
2001-10-02 | Perforation | 1849.00 | 1851.00 | 17 |
2007-07-09 | Perforation | 593.90 | 594.90 | 13 |
2007-07-09 | Perforation | 586.50 | 587.00 | 13 |
2007-07-09 | Perforation | 575.30 | 575.80 | 13 |
2007-07-09 | Perforation | 569.30 | 569.80 | 13 |
2007-07-09 | Perforation | 563.60 | 564.10 | 13 |
2007-07-09 | Perforation | 551.20 | 551.70 | 13 |
2007-07-09 | Perforation | 532.30 | 533.30 | 13 |
2007-07-09 | Perforation | 529.70 | 531.70 | 13 |
2007-07-09 | Perforation | 509.30 | 510.30 | 13 |
2007-07-09 | Perforation | 502.90 | 503.40 | 13 |
2002-03-03 | Perforation | 1853.50 | 1855.50 | 20 |
2007-07-09 | Perforation | 478.90 | 479.40 | 13 |
2007-07-09 | Perforation | 475.50 | 476.50 | 13 |
2007-07-09 | Perforation | 470.70 | 471.20 | 13 |
2007-07-09 | Perforation | 337.40 | 337.90 | 13 |
2007-07-09 | Perforation | 330.90 | 331.40 | 13 |
2007-07-15 | Fracture | 330.90 | 638.60 | 0 |
2002-05-28 | Fracture | 1849.00 | 1855.50 | 0 |
2003-04-24 | Packing Device Capped w/Cement | 1837.30 | 1845.30 | 0 |
2003-05-14 | Packing Device Capped w/Cement | 1787.00 | 1795.00 | 0 |
2003-06-07 | Perforation | 933.00 | 935.00 | 13 |
2003-07-01 | Perforation | 871.00 | 873.00 | 13 |
2003-07-29 | Perforation | 736.00 | 738.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 1007 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8749 | 0.0 | 0.0 | 0.0 |
2012 | 5055 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8716 | 0.0 | 0.0 | 0.0 |
2015 | 8688 | 0.0 | 0.0 | 0.0 |
2016 | 8739 | 0.0 | 0.0 | 0.0 |
2017 | 8667 | 0.0 | 0.0 | 0.0 |
2018 | 8667 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[5]