If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264261909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.236132,"lon":-113.613393,"icon":""}]} |
Location: 00/09-19-026-26W4/0 | |
Location Alias: 00/09-19-26-26 W4M | |
Location Alias 2: 00/09-19-026-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 19 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-19-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0404549 | |
License Date: 2008-11-24 | |
License Status: Issued | |
Spud Date: 2008-12-18 | |
Final Drill Date: 2008-12-20 | |
Well Total Depth: 793.00 m | |
Surface Hole Latitude: 51.236132 | |
Surface Hole Longitude: -113.613393 |
Date | Event |
---|---|
2008-11-24 | Obtained License |
2008-12-18 | Surface Casing Operation Performed |
2008-12-20 | Finished Drilling |
2008-12-20 | Well Mode changed to Drilled and Cased |
2008-12-21 | Production Casing Operation Performed |
2008-12-21 | Rig Released |
2008-12-21 | Well Log Performed |
2009-01-04 | Well Log Performed |
2009-03-09 | Perforation Treatment Performed - Jet Perforation |
2009-03-14 | Perforation Treatment Performed - Fractured |
2009-03-19 | Well Fluid changed to Gas |
2009-03-19 | Well Mode changed to Testing |
2009-03-24 | Perforation Treatment Performed - Jet Perforation |
2009-06-12 | Perforation Treatment Performed - Fractured |
2009-08-15 | Well Began Production |
2009-08-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-08-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-03-09 | Perforation | 755.00 | 758.00 | 13 |
2009-03-24 | Perforation | 630.90 | 631.40 | 13 |
2009-03-24 | Perforation | 621.90 | 622.40 | 13 |
2009-03-24 | Perforation | 608.50 | 609.00 | 13 |
2009-03-24 | Perforation | 600.90 | 601.40 | 13 |
2009-03-24 | Perforation | 594.40 | 595.40 | 13 |
2009-03-24 | Perforation | 567.10 | 567.60 | 13 |
2009-03-24 | Perforation | 560.00 | 561.00 | 13 |
2009-03-24 | Perforation | 544.40 | 544.90 | 13 |
2009-03-24 | Perforation | 518.50 | 519.00 | 13 |
2009-03-24 | Perforation | 512.70 | 513.20 | 13 |
2009-03-09 | Perforation | 481.50 | 484.50 | 13 |
2009-03-24 | Perforation | 508.80 | 509.30 | 13 |
2009-03-24 | Perforation | 507.40 | 507.90 | 13 |
2009-03-24 | Perforation | 503.00 | 503.50 | 13 |
2009-03-24 | Perforation | 491.80 | 492.30 | 13 |
2009-03-24 | Perforation | 388.90 | 389.40 | 13 |
2009-03-24 | Perforation | 384.30 | 384.80 | 13 |
2009-03-24 | Perforation | 371.20 | 371.70 | 13 |
2009-03-24 | Perforation | 369.10 | 369.60 | 13 |
2009-03-24 | Perforation | 361.50 | 362.00 | 13 |
2009-03-24 | Perforation | 611.00 | 614.00 | 13 |
2009-03-09 | Perforation | 208.00 | 211.00 | 13 |
2009-06-12 | Fracture | 361.50 | 671.50 | 0 |
2009-06-12 | Fracture | 611.00 | 614.00 | 0 |
2009-03-14 | Fracture | 481.50 | 484.50 | 0 |
2009-03-14 | Fracture | 208.00 | 211.00 | 0 |
2009-03-24 | Perforation | 670.50 | 671.50 | 13 |
2009-03-24 | Perforation | 649.80 | 650.80 | 13 |
2009-03-24 | Perforation | 643.20 | 643.70 | 13 |
2009-03-24 | Perforation | 634.50 | 635.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 3408 | 0.0 | 0.0 | 0.0 |
2010 | 8582 | 0.0 | 0.0 | 0.0 |
2011 | 7460 | 0.0 | 0.0 | 0.0 |
2012 | 4597 | 0.0 | 0.0 | 0.0 |
2013 | 8551 | 0.0 | 0.0 | 0.0 |
2014 | 8555 | 0.0 | 0.0 | 0.0 |
2015 | 8700 | 0.0 | 0.0 | 0.0 |
2016 | 8369 | 0.0 | 0.0 | 0.0 |
2017 | 8375 | 0.0 | 0.0 | 0.0 |
2018 | 8193 | 0.0 | 0.0 | 0.0 |
2019 | 8339 | 0.0 | 0.0 | 0.0 |
2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[5]