If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264262706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.242201,"lon":-113.544808,"icon":""}]} |
Location: 00/06-27-026-26W4/0 | |
Location Alias: 00/06-27-26-26 W4M | |
Location Alias 2: 00/06-27-026-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 27 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 6-27-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0428958 | |
License Date: 2010-12-24 | |
License Status: Issued | |
Spud Date: 2011-02-11 | |
Final Drill Date: 2011-02-12 | |
Well Total Depth: 1285.00 m | |
Surface Hole Latitude: 51.242201 | |
Surface Hole Longitude: -113.544808 |
Date | Event |
---|---|
2010-12-24 | Obtained License |
2011-02-11 | Direction Drilling Operation Performed - Deviate |
2011-02-12 | Finished Drilling |
2011-02-12 | Surface Casing Operation Performed |
2011-02-12 | Well Mode changed to Drilled and Cased |
2011-02-13 | Production Casing Operation Performed |
2011-02-13 | Rig Released |
2011-02-17 | Well Log Performed |
2011-08-21 | Perforation Treatment Performed - Jet Perforation |
2011-09-16 | Perforation Treatment Performed - Fractured |
2011-09-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-09-19 | Well Mode changed to Testing |
2011-09-27 | Perforation Treatment Performed - Jet Perforation |
2011-10-04 | Perforation Treatment Performed - Fractured |
2011-11-21 | Well Began Production |
2011-11-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-11 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-21 | Perforation | 714.00 | 717.00 | 13 |
2011-09-27 | Perforation | 389.50 | 392.50 | 13 |
2011-09-27 | Perforation | 444.40 | 444.90 | 13 |
2011-09-27 | Perforation | 471.40 | 472.40 | 13 |
2011-09-27 | Perforation | 482.70 | 483.20 | 13 |
2011-09-27 | Perforation | 489.10 | 489.60 | 13 |
2011-09-27 | Perforation | 497.00 | 499.00 | 13 |
2011-09-27 | Perforation | 504.50 | 505.50 | 13 |
2011-09-27 | Perforation | 514.10 | 516.10 | 13 |
2011-09-27 | Perforation | 573.20 | 573.70 | 13 |
2011-09-27 | Perforation | 617.40 | 617.90 | 13 |
2011-08-21 | Perforation | 773.00 | 775.00 | 13 |
2011-09-27 | Perforation | 642.00 | 642.50 | 13 |
2011-09-27 | Perforation | 655.00 | 658.00 | 13 |
2011-09-27 | Perforation | 661.60 | 662.60 | 13 |
2011-09-27 | Perforation | 665.80 | 666.30 | 13 |
2011-09-27 | Perforation | 693.60 | 694.10 | 13 |
2011-09-27 | Perforation | 700.40 | 701.40 | 13 |
2011-09-27 | Perforation | 731.40 | 731.90 | 13 |
2011-09-27 | Perforation | 733.60 | 734.10 | 13 |
2011-09-27 | Perforation | 735.00 | 737.00 | 13 |
2011-09-27 | Perforation | 757.30 | 757.80 | 13 |
2011-08-21 | Perforation | 1118.00 | 1120.00 | 13 |
2011-09-27 | Perforation | 760.00 | 763.00 | 13 |
2011-09-27 | Perforation | 777.30 | 778.30 | 13 |
2011-09-27 | Perforation | 784.40 | 785.40 | 13 |
2011-09-27 | Perforation | 794.40 | 794.90 | 13 |
2011-09-27 | Perforation | 808.60 | 809.10 | 13 |
2011-09-27 | Perforation | 809.80 | 810.30 | 13 |
2011-09-27 | Perforation | 817.60 | 819.10 | 13 |
2011-09-27 | Perforation | 823.30 | 824.80 | 13 |
2011-09-27 | Perforation | 829.60 | 830.60 | 13 |
2011-09-27 | Perforation | 842.50 | 843.50 | 13 |
2011-09-16 | Fracture | 714.00 | 717.00 | 0 |
2011-09-27 | Perforation | 861.40 | 862.40 | 13 |
2011-09-27 | Perforation | 866.50 | 867.00 | 13 |
2011-10-04 | Fracture | 298.00 | 867.00 | 0 |
2011-09-16 | Fracture | 773.00 | 775.00 | 0 |
2011-09-16 | Fracture | 1118.00 | 1120.00 | 0 |
2011-09-27 | Perforation | 298.00 | 300.00 | 13 |
2011-09-27 | Perforation | 313.60 | 314.10 | 13 |
2011-09-27 | Perforation | 343.00 | 346.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 988 | 0.0 | 0.0 | 0.0 |
2012 | 4368 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8758 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]