X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264263407000

Well Details

Well ID: 0264263407000
Loading map...
Location: 00/07-34-026-26W4/0
Location Alias: 00/07-34-26-26 W4M
Location Alias 2: 00/07-34-026-26 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 26
Section: 34
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 7-34-26-26
Operator Name: Ember Resources Inc.
License Number: 0252788
License Date: 2001-03-12
License Status: Amended
Spud Date: 2001-05-08
Final Drill Date: 2001-05-14
Well Total Depth: 1822.00 m
Surface Hole Latitude: 51.262631
Surface Hole Longitude: -113.549764

For data sources see[1][2]

Well History

Date Event
2001-03-12 Obtained License
2001-05-09 Surface Casing Operation Performed
2001-05-14 Finished Drilling
2001-05-14 Well Log Performed
2001-05-16 Plug Back Performed
2001-05-16 Production Casing Operation Performed
2001-05-16 Rig Released
2001-05-16 Well Log Performed
2001-05-16 Well Mode changed to Drilled and Cased
2001-06-16 Perforation Treatment Performed - Jet Perforation
2001-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-28 Perforation Treatment Performed - Jet Perforation
2001-06-28 Plug Back Performed
2001-06-28 Well Log Performed
2001-06-28 Well Mode changed to Abandoned Zone
2001-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-19 Plug Back Performed
2001-10-19 Well Log Performed
2004-06-05 Perforation Treatment Performed - Jet Perforation
2004-06-05 Well Log Performed
2004-06-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-06-16 Perforation 906.00 909.00 13
2004-06-05 Perforation 599.30 600.30 13
2004-06-05 Perforation 594.20 595.20 13
2004-06-05 Perforation 585.80 587.80 13
2004-06-05 Perforation 572.50 573.50 13
2004-06-05 Perforation 563.40 564.40 13
2004-06-05 Perforation 554.20 555.20 13
2004-06-05 Perforation 523.70 524.70 13
2004-06-05 Perforation 520.20 521.20 13
2004-06-05 Perforation 496.60 497.60 13
2004-06-05 Perforation 494.10 495.10 13
2001-06-16 Perforation 904.00 906.00 13
2004-06-05 Perforation 490.50 491.50 13
2004-06-05 Perforation 472.10 473.10 13
2004-06-05 Perforation 468.50 469.50 13
2004-06-05 Perforation 466.70 467.70 13
2004-06-05 Perforation 462.50 463.50 13
2004-06-05 Perforation 456.30 457.30 13
2004-06-05 Perforation 454.30 455.30 13
2004-06-05 Perforation 451.60 452.60 13
2004-06-05 Perforation 448.40 449.40 13
2004-06-05 Perforation 444.20 445.20 13
2001-06-28 Packing Device Capped w/Cement 885.00 893.00 0
2004-06-05 Perforation 395.10 396.10 13
2004-06-05 Perforation 345.50 346.50 13
2004-06-05 Perforation 335.40 336.40 13
2004-06-05 Perforation 331.30 332.30 13
2004-06-05 Perforation 324.50 325.50 13
2004-06-29 Fracture 324.50 634.90 0
2001-06-28 Perforation 761.00 764.00 13
2001-10-19 Packing Device Capped w/Cement 742.00 750.00 0
2004-06-05 Perforation 632.90 634.90 13
2004-06-05 Perforation 628.80 629.80 13
2004-06-05 Perforation 613.60 614.60 13
2004-06-05 Perforation 603.10 604.10 13

For data sources see[4]



References