If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264263508002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.260557,"lon":-113.517264,"icon":""}]} |
Location: 00/08-35-026-26W4/2 | |
Location Alias: 00/08-35-26-26 W4M | |
Location Alias 2: 00/08-35-026-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 35 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-35-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0241494 | |
License Date: 2000-08-30 | |
License Status: Issued | |
Spud Date: 2000-09-09 | |
Final Drill Date: 2000-09-12 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 51.260557 | |
Surface Hole Longitude: -113.517264 |
Date | Event |
---|---|
2000-08-30 | Obtained License |
2000-09-09 | Surface Casing Operation Performed |
2000-09-12 | Finished Drilling |
2000-09-12 | Well Mode changed to Drilled and Cased |
2000-09-13 | Production Casing Operation Performed |
2000-09-13 | Rig Released |
2000-09-24 | Well Log Performed |
2000-10-29 | Perforation Treatment Performed - Jet Perforation |
2000-10-31 | Perforation Treatment Performed - Jet Perforation |
2000-10-31 | Well Log Performed |
2000-11-19 | Perforation Treatment Performed - Fractured |
2010-08-13 | Perforation Treatment Performed - Jet Perforation |
2010-10-03 | Well Fluid changed to Gas |
2010-10-03 | Well Mode changed to Testing |
2010-11-08 | Perforation Treatment Performed - Jet Perforation |
2010-11-15 | Perforation Treatment Performed - Fractured |
2010-12-03 | Well Began Production |
2010-12-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-10-29 | Perforation | 705.00 | 708.00 | 17 |
2010-08-13 | Perforation | 755.00 | 757.00 | 13 |
2010-08-13 | Perforation | 720.00 | 722.00 | 13 |
2010-11-08 | Perforation | 333.10 | 333.60 | 13 |
2010-11-08 | Perforation | 254.10 | 254.60 | 13 |
2010-11-08 | Perforation | 434.00 | 436.00 | 13 |
2010-11-08 | Perforation | 439.10 | 440.10 | 13 |
2010-11-08 | Perforation | 343.20 | 343.70 | 13 |
2010-11-08 | Perforation | 338.80 | 339.30 | 13 |
2010-11-08 | Perforation | 357.00 | 359.00 | 13 |
2010-11-08 | Perforation | 277.50 | 278.50 | 13 |
2000-10-29 | Perforation | 693.50 | 695.50 | 17 |
2010-11-08 | Perforation | 215.00 | 218.00 | 13 |
2010-11-08 | Perforation | 421.00 | 423.00 | 13 |
2010-11-08 | Perforation | 404.00 | 406.00 | 13 |
2010-11-08 | Perforation | 362.00 | 363.00 | 13 |
2010-11-08 | Perforation | 459.20 | 459.70 | 13 |
2010-11-08 | Perforation | 579.20 | 580.20 | 13 |
2010-11-08 | Perforation | 573.80 | 575.80 | 13 |
2010-11-08 | Perforation | 569.70 | 570.70 | 13 |
2010-11-08 | Perforation | 625.20 | 625.70 | 13 |
2010-11-08 | Perforation | 613.60 | 614.60 | 13 |
2000-10-31 | Perforation | 534.50 | 536.50 | 17 |
2010-11-08 | Perforation | 594.80 | 595.30 | 13 |
2010-11-08 | Perforation | 557.70 | 558.20 | 13 |
2010-11-08 | Perforation | 493.40 | 493.90 | 13 |
2010-11-08 | Perforation | 464.70 | 465.20 | 13 |
2010-11-08 | Perforation | 544.30 | 544.80 | 13 |
2010-11-08 | Perforation | 507.30 | 510.30 | 13 |
2010-11-08 | Perforation | 550.00 | 550.50 | 13 |
2010-11-15 | Fracture | 215.00 | 436.00 | 0 |
2010-11-15 | Fracture | 254.10 | 625.70 | 0 |
2000-10-31 | Perforation | 164.00 | 168.00 | 17 |
2000-11-19 | Fracture | 693.50 | 708.00 | 0 |
2010-08-13 | Perforation | 900.00 | 902.00 | 13 |
2010-08-13 | Perforation | 885.00 | 887.00 | 13 |
2010-08-13 | Perforation | 865.00 | 866.00 | 13 |
2010-08-13 | Perforation | 805.00 | 806.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 572 | 0.0 | 0.0 | 0.0 |
2011 | 8564 | 0.0 | 0.0 | 0.0 |
2012 | 4824 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8758 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]