X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264263511000

Well Details

Well ID: 0264263511000
Loading map...
Location: 00/11-35-026-26W4/0
Location Alias: 00/11-35-26-26 W4M
Location Alias 2: 00/11-35-026-26 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 26
Section: 35
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 11-35-26-26
Operator Name: Ember Resources Inc.
License Number: 0433921
License Date: 2011-05-31
License Status: Issued
Spud Date: 2011-09-16
Final Drill Date: 2011-09-19
Well Total Depth: 2098.00 m
Surface Hole Latitude: 51.264952
Surface Hole Longitude: -113.540737

For data sources see[1][2]

Well History

Date Event
2011-05-31 Obtained License
2011-09-16 Conductor Casing Operation Performed
2011-09-16 Direction Drilling Operation Performed - Deviate
2011-09-17 Surface Casing Operation Performed
2011-09-19 Finished Drilling
2011-09-19 Well Mode changed to Drilled and Cased
2011-09-20 Production Casing Operation Performed
2011-09-20 Rig Released
2011-09-20 Well Log Performed
2011-09-27 Well Log Performed
2011-10-21 Perforation Treatment Performed - Jet Perforation
2011-10-21 Well Log Performed
2011-10-25 Well Log Performed
2011-11-14 Well Log Performed
2011-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-16 Perforation Treatment Performed - Jet Perforation
2011-11-16 Well Log Performed
2012-01-18 Perforation Treatment Performed - Fractured
2012-02-06 Perforation Treatment Performed - Jet Perforation
2012-02-06 Well Log Performed
2012-02-17 Perforation Treatment Performed - Jet Perforation
2012-02-17 Well Log Performed
2012-03-05 Perforation Treatment Performed - Fractured
2012-03-09 Well Fluid changed to Gas
2012-03-09 Well Mode changed to Testing
2015-11-10 Well Began Production
2015-11-10 Well Fluid changed to Gas
2015-11-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-16 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-21 Perforation 2061.00 2063.00 17
2011-11-15 Packing Device Capped w/Cement 2047.00 2055.00 0
2011-11-16 Perforation 1861.00 1863.00 17
2012-01-18 Fracture 1861.00 1863.00 0
2012-02-06 Perforation 1901.00 1904.00 17
2012-02-17 Perforation 1845.00 1848.00 17
2012-03-05 Fracture 1845.00 1848.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4 0.0 0.0 0.0
2015 1224 0.0 0.0 0.0
2016 8503 0.0 0.0 0.0
2017 8733 0.0 0.0 0.0
2018 8627 0.0 0.0 0.0
2019 8615 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References