If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264263512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.264742,"lon":-113.540523,"icon":""}]} |
Location: 00/12-35-026-26W4/0 | |
Location Alias: 00/12-35-26-26 W4M | |
Location Alias 2: 00/12-35-026-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 35 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 12-35-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0262602 | |
License Date: 2001-11-27 | |
License Status: Amended | |
Spud Date: 2001-12-05 | |
Final Drill Date: 2002-01-01 | |
Well Total Depth: 821.00 m | |
Surface Hole Latitude: 51.264742 | |
Surface Hole Longitude: -113.540523 |
Date | Event |
---|---|
2001-11-27 | Obtained License |
2001-12-05 | Surface Casing Operation Performed |
2001-12-31 | Direction Drilling Operation Performed - Deviate |
2002-01-01 | Finished Drilling |
2002-01-02 | Production Casing Operation Performed |
2002-01-02 | Rig Released |
2002-01-02 | Well Mode changed to Drilled and Cased |
2002-01-14 | Well Log Performed |
2002-01-22 | Well Log Performed |
2002-01-29 | Perforation Treatment Performed - Jet Perforation |
2002-02-10 | Perforation Treatment Performed - Fractured |
2002-03-21 | Well Began Production |
2002-03-21 | Well Fluid changed to Gas |
2002-03-21 | Well Mode changed to Flowing |
2007-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-06-05 | Well Log Performed |
2007-08-06 | Perforation Treatment Performed - Jet Perforation |
2007-08-18 | Perforation Treatment Performed - Fractured |
2007-09-14 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-12-31 | 141.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-01-29 | Perforation | 740.00 | 743.50 | 17 |
2007-08-06 | Perforation | 651.40 | 651.90 | 13 |
2007-08-06 | Perforation | 632.90 | 633.40 | 13 |
2007-08-06 | Perforation | 614.60 | 615.60 | 13 |
2007-08-06 | Perforation | 609.00 | 610.00 | 13 |
2007-08-06 | Perforation | 601.40 | 601.90 | 13 |
2007-08-06 | Perforation | 586.50 | 587.00 | 13 |
2007-08-06 | Perforation | 578.40 | 578.90 | 13 |
2007-08-06 | Perforation | 537.60 | 538.60 | 13 |
2007-08-06 | Perforation | 535.60 | 536.10 | 13 |
2007-08-06 | Perforation | 534.10 | 535.10 | 13 |
2002-01-29 | Perforation | 731.50 | 734.00 | 17 |
2007-08-06 | Perforation | 506.60 | 507.10 | 13 |
2007-08-06 | Perforation | 478.20 | 478.70 | 13 |
2007-08-06 | Perforation | 461.10 | 462.10 | 13 |
2007-08-06 | Perforation | 346.90 | 347.40 | 13 |
2007-08-18 | Fracture | 346.90 | 651.90 | 0 |
2002-01-29 | Perforation | 564.50 | 566.00 | 17 |
2002-01-29 | Perforation | 291.00 | 295.00 | 17 |
2002-01-29 | Perforation | 287.50 | 291.00 | 17 |
2002-01-29 | Perforation | 215.00 | 217.00 | 17 |
2002-01-29 | Perforation | 171.00 | 173.00 | 17 |
2002-02-10 | Fracture | 731.50 | 743.50 | 0 |
2007-06-05 | Packing Device Capped w/Cement | 717.00 | 725.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 5721 | 0.0 | 0.0 | 0.0 |
2003 | 8544 | 0.0 | 0.0 | 0.0 |
2004 | 8771 | 0.0 | 0.0 | 0.0 |
2005 | 7459 | 0.0 | 0.0 | 0.0 |
2006 | 8051 | 0.0 | 0.0 | 0.0 |
2007 | 3592 | 0.0 | 0.0 | 0.0 |
For data sources see[6]