If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264263607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.262856,"lon":-113.504206,"icon":""}]} |
Location: 00/07-36-026-26W4/0 | |
Location Alias: 00/07-36-26-26 W4M | |
Location Alias 2: 00/07-36-026-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 26 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 7-36-26-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0365720 | |
License Date: 2006-11-09 | |
License Status: Issued | |
Spud Date: 2006-11-18 | |
Final Drill Date: 2006-11-20 | |
Well Total Depth: 726.00 m | |
Surface Hole Latitude: 51.262856 | |
Surface Hole Longitude: -113.504206 |
Date | Event |
---|---|
2006-11-09 | Obtained License |
2006-11-18 | Surface Casing Operation Performed |
2006-11-20 | Finished Drilling |
2006-11-20 | Production Casing Operation Performed |
2006-11-20 | Rig Released |
2006-11-20 | Well Mode changed to Drilled and Cased |
2006-11-24 | Well Log Performed |
2006-12-02 | Perforation Treatment Performed - Jet Perforation |
2006-12-09 | Perforation Treatment Performed - Fractured |
2011-09-15 | Perforation Treatment Performed - Jet Perforation |
2011-10-05 | Perforation Treatment Performed - Fractured |
2011-11-20 | Well Began Production |
2011-11-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-20 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-12-02 | Perforation | 532.50 | 533.00 | 17 |
2011-09-15 | Perforation | 337.00 | 340.00 | 13 |
2011-09-15 | Perforation | 348.00 | 348.50 | 13 |
2011-09-15 | Perforation | 391.80 | 392.30 | 13 |
2011-09-15 | Perforation | 403.00 | 403.50 | 13 |
2011-09-15 | Perforation | 412.00 | 414.00 | 13 |
2011-09-15 | Perforation | 423.00 | 426.00 | 13 |
2011-09-15 | Perforation | 434.30 | 435.30 | 13 |
2011-09-15 | Perforation | 436.40 | 437.90 | 13 |
2011-09-15 | Perforation | 453.10 | 454.10 | 13 |
2011-09-15 | Perforation | 457.00 | 458.50 | 13 |
2006-12-02 | Perforation | 506.00 | 507.00 | 17 |
2011-09-15 | Perforation | 461.90 | 462.40 | 13 |
2011-09-15 | Perforation | 483.70 | 484.70 | 13 |
2011-09-15 | Perforation | 487.40 | 487.90 | 13 |
2011-09-15 | Perforation | 502.20 | 505.20 | 13 |
2011-09-15 | Perforation | 543.20 | 543.70 | 13 |
2011-09-15 | Perforation | 565.80 | 568.30 | 13 |
2011-09-15 | Perforation | 571.00 | 573.00 | 13 |
2011-09-15 | Perforation | 576.40 | 577.90 | 13 |
2011-09-15 | Perforation | 595.60 | 596.60 | 13 |
2011-09-15 | Perforation | 613.20 | 614.70 | 13 |
2006-12-09 | Fracture | 532.50 | 533.00 | 0 |
2011-10-05 | Fracture | 209.70 | 614.70 | 0 |
2006-12-09 | Fracture | 506.00 | 507.00 | 0 |
2011-09-15 | Perforation | 209.70 | 210.70 | 13 |
2011-09-15 | Perforation | 218.00 | 221.00 | 13 |
2011-09-15 | Perforation | 259.00 | 261.00 | 13 |
2011-09-15 | Perforation | 316.70 | 318.70 | 13 |
2011-09-15 | Perforation | 320.50 | 321.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1008 | 0.0 | 0.0 | 0.0 |
2012 | 3057 | 0.0 | 0.0 | 0.0 |
2013 | 8076 | 0.0 | 0.0 | 0.0 |
2014 | 8088 | 0.0 | 0.0 | 0.0 |
2015 | 8418 | 0.0 | 0.0 | 0.0 |
2016 | 8633 | 0.0 | 0.0 | 0.0 |
2017 | 8732 | 0.0 | 0.0 | 0.0 |
2018 | 8726 | 0.0 | 0.0 | 0.0 |
2019 | 8729 | 0.0 | 0.0 | 0.0 |
2020 | 2182 | 0.0 | 0.0 | 0.0 |
For data sources see[5]