X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264270912002

Well Details

Well ID: 0264270912002
Loading map...
Location: 00/12-09-026-27W4/2
Location Alias: 00/12-09-26-27 W4M
Location Alias 2: 00/12-09-026-27 W4/02
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 27
Section: 09
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 12-9-26-27
Operator Name: Ember Resources Inc.
License Number: 0233574
License Date: 2000-02-11
License Status: Issued
Spud Date: 2000-08-24
Final Drill Date: 2000-08-25
Well Total Depth: 1152.00 m
Surface Hole Latitude: 51.205642
Surface Hole Longitude: -113.725062

For data sources see[1][2]

Well History

Date Event
2000-02-11 Obtained License
2000-04-29 Surface Casing Operation Performed
2000-08-25 Finished Drilling
2000-08-25 Production Casing Operation Performed
2000-08-25 Well Log Performed
2000-08-25 Well Mode changed to Drilled and Cased
2000-08-26 Rig Released
2000-09-13 Well Log Performed
2000-09-25 Perforation Treatment Performed - Jet Perforation
2000-09-25 Well Log Performed
2000-09-25 Well Mode changed to Drilled and Cased
2000-10-23 Perforation Treatment Performed - Jet Perforation
2000-10-23 Well Log Performed
2007-08-19 Perforation Treatment Performed - Jet Perforation
2007-08-25 Perforation Treatment Performed - Fractured
2010-08-12 Perforation Treatment Performed - Jet Perforation
2010-10-12 Perforation Treatment Performed - Fractured
2010-10-21 Well Log Performed
2011-03-25 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-09-25 Perforation 867.00 870.00 17
2007-08-19 Perforation 700.30 700.80 13
2007-08-19 Perforation 692.30 692.80 13
2007-08-19 Perforation 672.80 673.80 13
2007-08-19 Perforation 655.70 658.70 13
2007-08-19 Perforation 649.30 650.30 13
2007-08-19 Perforation 614.70 615.20 13
2007-08-19 Perforation 606.60 607.10 13
2007-08-19 Perforation 594.60 595.60 13
2007-08-19 Perforation 569.90 570.40 13
2007-08-19 Perforation 512.10 512.60 13
2000-09-25 Perforation 859.00 863.00 17
2007-08-19 Perforation 457.90 458.40 13
2007-08-19 Perforation 443.00 443.50 13
2007-08-19 Perforation 429.70 430.70 13
2007-08-19 Perforation 317.10 317.60 13
2007-08-25 Fracture 317.10 760.40 0
2010-08-12 Perforation 1085.00 1088.00 13
2010-08-12 Perforation 1053.00 1055.00 13
2010-08-12 Perforation 686.00 688.00 13
2010-08-12 Perforation 679.00 681.00 13
2010-08-12 Perforation 641.00 642.00 13
2000-09-25 Perforation 288.00 293.00 17
2010-08-12 Perforation 627.00 630.00 13
2010-08-12 Perforation 589.00 591.00 13
2010-08-12 Perforation 556.00 559.00 13
2010-08-12 Perforation 543.00 545.00 13
2010-08-12 Perforation 527.00 528.00 13
2010-08-12 Perforation 523.00 524.00 13
2010-08-12 Perforation 488.00 490.00 13
2010-08-12 Perforation 451.00 454.00 13
2010-08-12 Perforation 335.00 337.00 13
2010-10-12 Fracture 1085.00 1088.00 0
2000-10-23 Perforation 1004.00 1006.00 17
2007-08-19 Perforation 759.40 760.40 13
2007-08-19 Perforation 743.80 744.80 13
2007-08-19 Perforation 734.10 734.60 13
2007-08-19 Perforation 725.10 727.10 13
2007-08-19 Perforation 713.50 714.50 13

For data sources see[4]



References