If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264271015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.208867,"lon":-113.685376,"icon":""}]} |
Location: 00/15-10-026-27W4/0 | |
Location Alias: 00/15-10-26-27 W4M | |
Location Alias 2: 00/15-10-026-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 27 | |
Section: 10 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 15-10-26-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0291220 | |
License Date: 2003-08-12 | |
License Status: Issued | |
Spud Date: 2003-08-26 | |
Final Drill Date: 2003-09-12 | |
Well Total Depth: 1146.00 m | |
Surface Hole Latitude: 51.208867 | |
Surface Hole Longitude: -113.685376 |
Date | Event |
---|---|
2003-07-25 | Well Log Performed |
2003-08-12 | Obtained License |
2003-08-26 | Surface Casing Operation Performed |
2003-09-11 | Production Casing Operation Performed |
2003-09-12 | Finished Drilling |
2003-09-12 | Rig Released |
2003-09-12 | Well Mode changed to Drilled and Cased |
2003-09-27 | Perforation Treatment Performed - Jet Perforation |
2003-09-27 | Well Log Performed |
2003-10-19 | Perforation Treatment Performed - Fractured |
2004-06-27 | Well Began Production |
2004-06-27 | Well Fluid changed to Gas |
2004-06-27 | Well Mode changed to Flowing |
2004-06-28 | Well Fluid changed to Gas |
2004-06-28 | Well Mode changed to Flowing |
2005-08-22 | Perforation Treatment Performed - Jet Perforation |
2005-09-03 | Perforation Treatment Performed - Fractured |
2006-01-17 | Well Log Performed |
2006-10-01 | Well Fluid changed to Gas |
2006-10-01 | Well Mode changed to Suspended |
2007-09-11 | Well Log Performed |
2008-10-07 | Well Log Performed |
2009-11-11 | Well Log Performed |
2010-08-28 | Well Log Performed |
2013-10-08 | Well Log Performed |
2017-04-11 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-09-27 | Perforation | 1021.00 | 1022.00 | 17 |
2005-08-22 | Perforation | 693.50 | 694.00 | 13 |
2005-08-22 | Perforation | 681.70 | 682.20 | 13 |
2005-08-22 | Perforation | 661.00 | 661.50 | 13 |
2005-08-22 | Perforation | 644.10 | 644.60 | 13 |
2005-08-22 | Perforation | 628.90 | 629.40 | 13 |
2005-08-22 | Perforation | 627.30 | 627.80 | 13 |
2005-08-22 | Perforation | 626.20 | 626.70 | 13 |
2005-08-22 | Perforation | 607.40 | 607.90 | 13 |
2005-08-22 | Perforation | 578.00 | 578.50 | 13 |
2005-08-22 | Perforation | 556.10 | 556.60 | 13 |
2003-09-27 | Perforation | 785.00 | 786.50 | 17 |
2005-08-22 | Perforation | 553.30 | 553.80 | 13 |
2005-08-22 | Perforation | 549.30 | 549.80 | 13 |
2005-08-22 | Perforation | 530.50 | 531.00 | 13 |
2005-08-22 | Perforation | 438.60 | 439.10 | 13 |
2005-08-22 | Perforation | 419.80 | 420.30 | 13 |
2005-08-22 | Perforation | 417.30 | 417.80 | 13 |
2005-08-22 | Perforation | 357.70 | 358.20 | 13 |
2005-09-03 | Fracture | 357.70 | 728.50 | 0 |
2003-09-27 | Perforation | 781.00 | 782.00 | 17 |
2003-10-19 | Fracture | 1021.00 | 1022.00 | 0 |
2003-10-19 | Fracture | 781.00 | 786.50 | 0 |
2005-08-22 | Perforation | 728.00 | 728.50 | 13 |
2005-08-22 | Perforation | 709.70 | 710.20 | 13 |
2005-08-22 | Perforation | 701.50 | 702.00 | 13 |
2005-08-22 | Perforation | 695.80 | 696.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 4476 | 0.0 | 0.0 | 0.0 |
2005 | 5076 | 0.0 | 0.0 | 0.0 |
For data sources see[5]