If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264271508003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.217242,"lon":-113.680083,"icon":""}]} |
Location: 00/08-15-026-27W4/3 | |
Location Alias: 00/08-15-26-27 W4M | |
Location Alias 2: 00/08-15-026-27 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 27 | |
Section: 15 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-15-26-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0220099 | |
License Date: 1998-12-18 | |
License Status: Issued | |
Spud Date: 1999-01-08 | |
Final Drill Date: 1999-01-09 | |
Well Total Depth: 1126.00 m | |
Surface Hole Latitude: 51.217242 | |
Surface Hole Longitude: -113.680083 |
Date | Event |
---|---|
1998-12-18 | Obtained License |
1999-01-09 | Finished Drilling |
1999-01-09 | Production Casing Operation Performed |
1999-01-09 | Rig Released |
1999-01-09 | Surface Casing Operation Performed |
1999-01-09 | Well Mode changed to Drilled and Cased |
1999-01-14 | Well Log Performed |
1999-01-16 | Perforation Treatment Performed - Jet Perforation |
1999-01-16 | Well Log Performed |
1999-01-28 | Perforation Treatment Performed - Fractured |
2000-06-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-06-29 | Plug Back Performed |
2000-07-08 | Perforation Treatment Performed - Jet Perforation |
2000-07-29 | Well Log Performed |
2000-08-13 | Perforation Treatment Performed - Fractured |
2000-09-11 | Perforation Treatment Performed - Jet Perforation |
2000-09-11 | Well Log Performed |
2000-09-11 | Well Mode changed to Drilled and Cased |
2000-10-06 | Perforation Treatment Performed - Fractured |
2001-10-01 | Well Began Production |
2001-10-01 | Well Fluid changed to Gas |
2001-10-01 | Well Mode changed to Flowing |
2002-02-11 | Well Structure changed to Commingled |
2007-08-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-08-16 | Perforation Treatment Performed - Jet Perforation |
2007-08-16 | Plug Back Performed |
2007-08-25 | Perforation Treatment Performed - Fractured |
2007-09-21 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-01-16 | Perforation | 1011.00 | 1015.00 | 14 |
2000-10-06 | Fracture | 247.00 | 253.00 | 0 |
2007-08-16 | Packing Device Capped w/Cement | 786.00 | 794.00 | 0 |
2007-08-16 | Perforation | 723.80 | 724.30 | 13 |
2007-08-16 | Perforation | 703.50 | 704.50 | 13 |
2007-08-16 | Perforation | 696.50 | 697.50 | 13 |
2007-08-16 | Perforation | 691.10 | 692.10 | 13 |
2007-08-16 | Perforation | 688.50 | 689.00 | 13 |
2007-08-16 | Perforation | 676.70 | 677.20 | 13 |
2007-08-16 | Perforation | 663.30 | 663.80 | 13 |
2007-08-16 | Perforation | 657.60 | 658.10 | 13 |
1999-01-28 | Fracture | 1011.00 | 1015.00 | 0 |
2007-08-16 | Perforation | 649.30 | 649.80 | 13 |
2007-08-16 | Perforation | 641.70 | 642.20 | 13 |
2007-08-16 | Perforation | 625.30 | 626.30 | 13 |
2007-08-16 | Perforation | 616.10 | 618.10 | 13 |
2007-08-16 | Perforation | 602.60 | 603.10 | 13 |
2007-08-16 | Perforation | 579.90 | 580.40 | 13 |
2007-08-16 | Perforation | 571.50 | 572.00 | 13 |
2007-08-16 | Perforation | 558.20 | 559.20 | 13 |
2007-08-16 | Perforation | 549.60 | 550.60 | 13 |
2007-08-16 | Perforation | 434.00 | 435.00 | 13 |
2000-06-29 | Packing Device Capped w/Cement | 1010.00 | 1018.00 | 0 |
2007-08-16 | Perforation | 419.90 | 420.40 | 13 |
2007-08-16 | Perforation | 350.30 | 350.80 | 13 |
2007-08-25 | Fracture | 350.30 | 724.30 | 0 |
2000-07-08 | Perforation | 827.00 | 828.00 | 17 |
2000-07-08 | Perforation | 821.00 | 824.00 | 17 |
2000-07-08 | Perforation | 807.00 | 808.00 | 17 |
2000-07-08 | Perforation | 798.00 | 801.00 | 17 |
2000-08-13 | Fracture | 798.00 | 808.00 | 0 |
2000-09-11 | Perforation | 247.00 | 253.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 931 | 0.0 | 0.0 | 0.0 |
2002 | 292 | 0.0 | 0.0 | 0.0 |
For data sources see[5]