If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264272913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.253003,"lon":-113.743457,"icon":""}]} |
Location: 00/13-29-026-27W4/0 | |
Location Alias: 00/13-29-26-27 W4M | |
Location Alias 2: 00/13-29-026-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 27 | |
Section: 29 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 13-29-26-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412390 | |
License Date: 2009-09-17 | |
License Status: Issued | |
Spud Date: 2009-11-15 | |
Final Drill Date: 2009-11-20 | |
Well Total Depth: 1153.00 m | |
Surface Hole Latitude: 51.253003 | |
Surface Hole Longitude: -113.743457 |
Date | Event |
---|---|
2009-09-17 | Obtained License |
2009-11-15 | Surface Casing Operation Performed |
2009-11-20 | Finished Drilling |
2009-11-20 | Well Log Performed |
2009-11-20 | Well Mode changed to Drilled and Cased |
2009-11-21 | Production Casing Operation Performed |
2009-11-21 | Rig Released |
2009-11-24 | Well Log Performed |
2010-01-06 | Perforation Treatment Performed - Jet Perforation |
2010-01-15 | Well Fluid changed to Gas |
2010-01-15 | Well Mode changed to Testing |
2010-01-24 | Perforation Treatment Performed - Jet Perforation |
2010-02-02 | Perforation Treatment Performed - Fractured |
2010-02-12 | Well Began Production |
2010-02-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-06 | Perforation | 1075.00 | 1076.00 | 13 |
2010-01-24 | Perforation | 489.30 | 489.80 | 13 |
2010-01-24 | Perforation | 531.70 | 532.20 | 13 |
2010-01-24 | Perforation | 518.00 | 521.00 | 13 |
2010-01-24 | Perforation | 525.00 | 526.00 | 13 |
2010-01-24 | Perforation | 356.00 | 359.00 | 13 |
2010-01-24 | Perforation | 366.50 | 369.50 | 13 |
2010-01-24 | Perforation | 561.00 | 562.00 | 13 |
2010-01-24 | Perforation | 342.60 | 343.10 | 13 |
2010-01-24 | Perforation | 345.50 | 346.50 | 13 |
2010-01-24 | Perforation | 333.00 | 333.50 | 13 |
2010-01-06 | Perforation | 1101.50 | 1102.50 | 13 |
2010-01-24 | Perforation | 340.10 | 340.60 | 13 |
2010-01-24 | Perforation | 613.50 | 614.50 | 13 |
2010-01-24 | Perforation | 729.50 | 730.00 | 13 |
2010-01-24 | Perforation | 739.50 | 740.00 | 13 |
2010-01-24 | Perforation | 704.70 | 705.20 | 13 |
2010-01-24 | Perforation | 727.60 | 728.10 | 13 |
2010-01-24 | Perforation | 761.90 | 762.90 | 13 |
2010-01-24 | Perforation | 772.30 | 772.80 | 13 |
2010-01-24 | Perforation | 744.00 | 745.00 | 13 |
2010-01-24 | Perforation | 754.50 | 755.00 | 13 |
2010-01-24 | Perforation | 464.00 | 464.50 | 13 |
2010-01-24 | Perforation | 634.20 | 634.70 | 13 |
2010-01-24 | Perforation | 657.30 | 657.80 | 13 |
2010-01-24 | Perforation | 617.90 | 618.40 | 13 |
2010-01-24 | Perforation | 624.90 | 625.40 | 13 |
2010-01-24 | Perforation | 677.80 | 679.80 | 13 |
2010-01-24 | Perforation | 696.40 | 699.40 | 13 |
2010-01-24 | Perforation | 675.00 | 677.00 | 13 |
2010-01-24 | Perforation | 670.90 | 671.90 | 13 |
2010-02-02 | Fracture | 1101.50 | 1102.50 | 0 |
2010-02-02 | Fracture | 1075.00 | 1076.00 | 0 |
2010-01-24 | Perforation | 466.50 | 467.00 | 13 |
2010-02-02 | Fracture | 333.00 | 772.80 | 0 |
2010-01-24 | Perforation | 408.10 | 408.60 | 13 |
2010-01-24 | Perforation | 437.30 | 437.80 | 13 |
2010-01-24 | Perforation | 476.40 | 476.90 | 13 |
2010-01-24 | Perforation | 579.60 | 580.10 | 13 |
2010-01-24 | Perforation | 599.30 | 600.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 8019 | 0.0 | 0.0 | 0.0 |
2011 | 8543 | 0.0 | 0.0 | 0.0 |
2012 | 4704 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8758 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]