If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0264273306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.263006,"lon":-113.714809,"icon":""}]} |
| Location: 00/06-33-026-27W4/0 | |
| Location Alias: 00/06-33-26-27 W4M | |
| Location Alias 2: 00/06-33-026-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 026 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 33 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 6-33-26-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0310814 | |
| License Date: 2004-06-24 | |
| License Status: Issued | |
| Spud Date: 2004-07-12 | |
| Final Drill Date: 2004-07-15 | |
| Well Total Depth: 1164.00 m | |
| Surface Hole Latitude: 51.263006 | |
| Surface Hole Longitude: -113.714809 |
| Date | Event |
|---|---|
| 2004-06-24 | Obtained License |
| 2004-07-12 | Surface Casing Operation Performed |
| 2004-07-15 | Finished Drilling |
| 2004-07-15 | Well Mode changed to Drilled and Cased |
| 2004-07-16 | Production Casing Operation Performed |
| 2004-07-16 | Rig Released |
| 2004-07-27 | Well Log Performed |
| 2004-08-18 | Perforation Treatment Performed - Jet Perforation |
| 2004-09-13 | Perforation Treatment Performed - Fractured |
| 2005-01-10 | Well Began Production |
| 2005-01-10 | Well Fluid changed to Gas |
| 2005-01-10 | Well Mode changed to Flowing |
| 2011-09-17 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-24 | Perforation Treatment Performed - Fractured |
| 2011-10-14 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-19 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-08-18 | Perforation | 825.00 | 826.00 | 17 |
| 2011-10-14 | Perforation | 303.90 | 304.90 | 13 |
| 2011-10-14 | Perforation | 324.20 | 325.20 | 13 |
| 2011-10-14 | Perforation | 348.50 | 350.00 | 13 |
| 2011-10-14 | Perforation | 443.40 | 443.90 | 13 |
| 2011-10-14 | Perforation | 461.80 | 462.30 | 13 |
| 2011-10-14 | Perforation | 475.10 | 476.10 | 13 |
| 2011-10-14 | Perforation | 502.00 | 504.00 | 13 |
| 2011-10-14 | Perforation | 517.60 | 518.60 | 13 |
| 2011-10-14 | Perforation | 554.50 | 556.50 | 13 |
| 2011-10-14 | Perforation | 568.60 | 569.60 | 13 |
| 2004-08-18 | Perforation | 828.50 | 830.50 | 17 |
| 2011-10-14 | Perforation | 580.70 | 581.20 | 13 |
| 2011-10-14 | Perforation | 587.70 | 588.20 | 13 |
| 2011-10-14 | Perforation | 622.60 | 623.10 | 13 |
| 2011-10-14 | Perforation | 637.60 | 638.10 | 13 |
| 2011-10-14 | Perforation | 640.00 | 640.50 | 13 |
| 2011-10-14 | Perforation | 640.60 | 641.60 | 13 |
| 2011-10-14 | Perforation | 646.20 | 647.20 | 13 |
| 2011-10-14 | Perforation | 670.80 | 672.80 | 13 |
| 2011-10-14 | Perforation | 684.70 | 685.20 | 13 |
| 2011-10-14 | Perforation | 696.50 | 697.00 | 13 |
| 2004-08-18 | Perforation | 1066.00 | 1068.00 | 17 |
| 2011-10-14 | Perforation | 708.50 | 709.50 | 13 |
| 2011-10-14 | Perforation | 712.80 | 713.30 | 13 |
| 2011-10-14 | Perforation | 721.40 | 722.40 | 13 |
| 2011-10-14 | Perforation | 728.30 | 729.30 | 13 |
| 2011-10-14 | Perforation | 743.00 | 744.00 | 13 |
| 2011-10-19 | Fracture | 276.50 | 744.00 | 0 |
| 2004-09-13 | Fracture | 825.00 | 1068.00 | 0 |
| 2011-09-17 | Perforation | 328.00 | 330.00 | 13 |
| 2011-09-17 | Perforation | 549.00 | 551.00 | 13 |
| 2011-09-24 | Fracture | 328.00 | 330.00 | 0 |
| 2011-09-24 | Fracture | 549.00 | 551.00 | 0 |
| 2011-10-14 | Perforation | 276.50 | 278.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 7516 | 0.0 | 0.0 | 0.0 |
| 2006 | 8530 | 0.0 | 0.0 | 0.0 |
| 2007 | 8557 | 0.0 | 0.0 | 0.0 |
| 2008 | 7289 | 0.0 | 0.0 | 0.0 |
| 2009 | 6613 | 0.0 | 0.0 | 0.0 |
| 2010 | 4430 | 0.0 | 0.0 | 0.0 |
| 2012 | 3432 | 0.0 | 0.0 | 0.0 |
| 2013 | 8716 | 0.0 | 0.0 | 0.0 |
| 2014 | 8713 | 0.0 | 0.0 | 0.0 |
| 2015 | 8758 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]