X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264273306000

Well Details

Well ID: 0264273306000
Loading map...
Location: 00/06-33-026-27W4/0
Location Alias: 00/06-33-26-27 W4M
Location Alias 2: 00/06-33-026-27 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 27
Section: 33
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 6-33-26-27
Operator Name: Ember Resources Inc.
License Number: 0310814
License Date: 2004-06-24
License Status: Issued
Spud Date: 2004-07-12
Final Drill Date: 2004-07-15
Well Total Depth: 1164.00 m
Surface Hole Latitude: 51.263006
Surface Hole Longitude: -113.714809

For data sources see[1][2]

Well History

Date Event
2004-06-24 Obtained License
2004-07-12 Surface Casing Operation Performed
2004-07-15 Finished Drilling
2004-07-15 Well Mode changed to Drilled and Cased
2004-07-16 Production Casing Operation Performed
2004-07-16 Rig Released
2004-07-27 Well Log Performed
2004-08-18 Perforation Treatment Performed - Jet Perforation
2004-09-13 Perforation Treatment Performed - Fractured
2005-01-10 Well Began Production
2005-01-10 Well Fluid changed to Gas
2005-01-10 Well Mode changed to Flowing
2011-09-17 Perforation Treatment Performed - Jet Perforation
2011-09-24 Perforation Treatment Performed - Fractured
2011-10-14 Perforation Treatment Performed - Jet Perforation
2011-10-19 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-08-18 Perforation 825.00 826.00 17
2011-10-14 Perforation 303.90 304.90 13
2011-10-14 Perforation 324.20 325.20 13
2011-10-14 Perforation 348.50 350.00 13
2011-10-14 Perforation 443.40 443.90 13
2011-10-14 Perforation 461.80 462.30 13
2011-10-14 Perforation 475.10 476.10 13
2011-10-14 Perforation 502.00 504.00 13
2011-10-14 Perforation 517.60 518.60 13
2011-10-14 Perforation 554.50 556.50 13
2011-10-14 Perforation 568.60 569.60 13
2004-08-18 Perforation 828.50 830.50 17
2011-10-14 Perforation 580.70 581.20 13
2011-10-14 Perforation 587.70 588.20 13
2011-10-14 Perforation 622.60 623.10 13
2011-10-14 Perforation 637.60 638.10 13
2011-10-14 Perforation 640.00 640.50 13
2011-10-14 Perforation 640.60 641.60 13
2011-10-14 Perforation 646.20 647.20 13
2011-10-14 Perforation 670.80 672.80 13
2011-10-14 Perforation 684.70 685.20 13
2011-10-14 Perforation 696.50 697.00 13
2004-08-18 Perforation 1066.00 1068.00 17
2011-10-14 Perforation 708.50 709.50 13
2011-10-14 Perforation 712.80 713.30 13
2011-10-14 Perforation 721.40 722.40 13
2011-10-14 Perforation 728.30 729.30 13
2011-10-14 Perforation 743.00 744.00 13
2011-10-19 Fracture 276.50 744.00 0
2004-09-13 Fracture 825.00 1068.00 0
2011-09-17 Perforation 328.00 330.00 13
2011-09-17 Perforation 549.00 551.00 13
2011-09-24 Fracture 328.00 330.00 0
2011-09-24 Fracture 549.00 551.00 0
2011-10-14 Perforation 276.50 278.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7516 0.0 0.0 0.0
2006 8530 0.0 0.0 0.0
2007 8557 0.0 0.0 0.0
2008 7289 0.0 0.0 0.0
2009 6613 0.0 0.0 0.0
2010 4430 0.0 0.0 0.0
2012 3432 0.0 0.0 0.0
2013 8716 0.0 0.0 0.0
2014 8713 0.0 0.0 0.0
2015 8758 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References