If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264273508002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.262908,"lon":-113.657376,"icon":""}]} |
Location: 00/08-35-026-27W4/2 | |
Location Alias: 00/08-35-26-27 W4M | |
Location Alias 2: 00/08-35-026-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 27 | |
Section: 35 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 8-35-26-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0203762 | |
License Date: 1997-07-22 | |
License Status: Issued | |
Spud Date: 1997-08-07 | |
Final Drill Date: 1997-08-19 | |
Well Total Depth: 1113.00 m | |
Surface Hole Latitude: 51.262908 | |
Surface Hole Longitude: -113.657376 |
Date | Event |
---|---|
1997-07-22 | Obtained License |
1997-08-07 | Surface Casing Operation Performed |
1997-08-19 | Finished Drilling |
1997-08-19 | Well Mode changed to Drilled and Cased |
1997-08-21 | Production Casing Operation Performed |
1997-08-21 | Rig Released |
1998-03-07 | Well Log Performed |
1998-10-25 | Perforation Treatment Performed - Jet Perforation |
1998-10-25 | Well Log Performed |
1999-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-03-02 | Plug Back Performed |
2000-09-11 | Perforation Treatment Performed - Jet Perforation |
2000-10-08 | Perforation Treatment Performed - Fractured |
2001-02-19 | Well Began Production |
2001-02-19 | Well Fluid changed to Gas |
2001-02-19 | Well Mode changed to Flowing |
2005-08-08 | Perforation Treatment Performed - Jet Perforation |
2005-08-14 | Perforation Treatment Performed - Fractured |
2006-04-01 | Well Fluid changed to Gas |
2006-04-01 | Well Mode changed to Suspended |
2007-07-02 | Well Log Performed |
2008-12-04 | Well Log Performed |
2009-09-27 | Well Log Performed |
2010-12-01 | Well Log Performed |
2017-04-12 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-10-25 | Perforation | 795.00 | 798.00 | 14 |
2005-08-08 | Perforation | 680.90 | 681.40 | 13 |
2005-08-08 | Perforation | 671.70 | 672.20 | 13 |
2005-08-08 | Perforation | 664.70 | 665.20 | 13 |
2005-08-08 | Perforation | 663.00 | 663.50 | 13 |
2005-08-08 | Perforation | 659.20 | 659.70 | 13 |
2005-08-08 | Perforation | 650.00 | 650.50 | 13 |
2005-08-08 | Perforation | 637.30 | 637.80 | 13 |
2005-08-08 | Perforation | 632.10 | 632.60 | 13 |
2005-08-08 | Perforation | 625.80 | 626.30 | 13 |
2005-08-08 | Perforation | 618.40 | 618.90 | 13 |
1999-03-02 | Packing Device Capped w/Cement | 783.00 | 791.00 | 0 |
2005-08-08 | Perforation | 599.00 | 599.50 | 13 |
2005-08-08 | Perforation | 590.70 | 591.20 | 13 |
2005-08-08 | Perforation | 588.90 | 589.40 | 13 |
2005-08-08 | Perforation | 572.80 | 573.30 | 13 |
2005-08-08 | Perforation | 555.10 | 555.60 | 13 |
2005-08-08 | Perforation | 546.70 | 547.20 | 13 |
2005-08-08 | Perforation | 538.80 | 539.30 | 13 |
2005-08-08 | Perforation | 536.60 | 537.10 | 13 |
2005-08-08 | Perforation | 532.00 | 532.50 | 13 |
2005-08-08 | Perforation | 458.90 | 459.40 | 13 |
2000-09-11 | Perforation | 780.00 | 784.00 | 17 |
2005-08-08 | Perforation | 453.30 | 453.80 | 13 |
2005-08-08 | Perforation | 417.20 | 417.70 | 13 |
2005-08-08 | Perforation | 412.40 | 412.90 | 13 |
2005-08-08 | Perforation | 409.00 | 409.50 | 13 |
2005-08-08 | Perforation | 396.20 | 396.70 | 13 |
2005-08-08 | Perforation | 393.00 | 393.50 | 13 |
2005-08-08 | Perforation | 389.90 | 390.40 | 13 |
2005-08-08 | Perforation | 385.20 | 385.70 | 13 |
2005-08-08 | Perforation | 382.30 | 382.80 | 13 |
2005-08-08 | Perforation | 379.50 | 380.00 | 13 |
2000-10-08 | Fracture | 780.00 | 784.00 | 0 |
2005-08-08 | Perforation | 361.70 | 362.20 | 13 |
2005-08-08 | Perforation | 356.00 | 356.50 | 13 |
2005-08-08 | Perforation | 326.30 | 326.80 | 13 |
2005-08-08 | Perforation | 277.40 | 277.90 | 13 |
2005-08-14 | Fracture | 277.40 | 715.20 | 0 |
2005-08-08 | Perforation | 714.70 | 715.20 | 13 |
2005-08-08 | Perforation | 706.90 | 707.40 | 13 |
2005-08-08 | Perforation | 704.50 | 705.00 | 13 |
2005-08-08 | Perforation | 701.20 | 701.70 | 13 |
2005-08-08 | Perforation | 687.70 | 688.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 5129 | 0.0 | 0.0 | 0.0 |
2002 | 3493 | 0.0 | 0.0 | 0.0 |
2003 | 325 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-10-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]