X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264273601000

Well Details

Well ID: 0264273601000
Loading map...
Location: 00/01-36-026-27W4/0
Location Alias: 00/01-36-26-27 W4M
Location Alias 2: 00/01-36-026-27 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 27
Section: 36
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 1-36-26-27
Operator Name: Ember Resources Inc.
License Number: 0185164
License Date: 1996-01-30
License Status: Issued
Spud Date: 1996-02-10
Final Drill Date: 1996-02-12
Well Total Depth: 1109.00 m
Surface Hole Latitude: 51.256464
Surface Hole Longitude: -113.633857

For data sources see[1][2]

Well History

Date Event
1996-01-30 Obtained License
1996-02-10 Surface Casing Operation Performed
1996-02-12 Finished Drilling
1996-02-12 Production Casing Operation Performed
1996-02-12 Rig Released
1996-02-12 Well Mode changed to Drilled and Cased
1996-02-24 Well Log Performed
1996-03-05 Perforation Treatment Performed - Jet Perforation
1996-03-07 Perforation Treatment Performed - Fractured
1998-10-05 Perforation Treatment Performed - Jet Perforation
1998-10-05 Well Log Performed
1999-03-12 Well Began Production
1999-03-12 Well Fluid changed to Gas
1999-03-12 Well Mode changed to Flowing
1999-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-09 Perforation Treatment Performed - Jet Perforation
1999-08-09 Plug Back Performed
1999-08-09 Well Log Performed
1999-08-20 Well Log Performed
1999-08-30 Well Log Performed
1999-09-08 Perforation Treatment Performed - Fractured
1999-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-17 Perforation Treatment Performed - Jet Perforation
1999-10-17 Plug Back Performed
1999-10-17 Well Fluid changed to Gas
1999-10-17 Well Log Performed
1999-10-17 Well Mode changed to Abandoned Zone
2000-09-12 Perforation Treatment Performed - Jet Perforation
2000-09-12 Well Log Performed
2005-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-08 Perforation Treatment Performed - Jet Perforation
2005-09-08 Plug Back Performed
2005-09-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-05 Perforation 960.00 963.00 7
1999-10-17 Perforation 763.50 767.50 13
2000-09-12 Perforation 758.00 760.00 17
2005-09-08 Packing Device Capped w/Cement 747.00 755.00 0
2005-09-08 Perforation 691.10 691.60 13
2005-09-08 Perforation 684.40 684.90 13
2005-09-08 Perforation 678.10 678.60 13
2005-09-08 Perforation 648.40 648.90 13
2005-09-08 Perforation 642.40 642.90 13
2005-09-08 Perforation 641.10 641.60 13
2005-09-08 Perforation 637.60 638.10 13
1996-03-07 Fracture 960.00 963.00 0
2005-09-08 Perforation 628.30 628.80 13
2005-09-08 Perforation 616.80 617.30 13
2005-09-08 Perforation 611.00 611.50 13
2005-09-08 Perforation 604.90 605.40 13
2005-09-08 Perforation 596.80 597.30 13
2005-09-08 Perforation 577.60 578.10 13
2005-09-08 Perforation 569.50 570.00 13
2005-09-08 Perforation 552.30 552.80 13
2005-09-08 Perforation 549.80 550.30 13
2005-09-08 Perforation 526.50 527.00 13
1998-10-05 Perforation 986.50 990.50 14
2005-09-08 Perforation 517.00 517.50 13
2005-09-08 Perforation 515.50 516.00 13
2005-09-08 Perforation 504.70 505.20 13
2005-09-08 Perforation 439.20 439.70 13
2005-09-08 Perforation 410.60 411.10 13
2005-09-08 Perforation 407.20 407.70 13
2005-09-08 Perforation 405.20 405.70 13
2005-09-08 Perforation 399.20 399.70 13
2005-09-08 Perforation 394.40 394.90 13
2005-09-08 Perforation 387.50 388.00 13
1999-08-09 Packing Device Capped w/Cement 974.00 982.00 0
2005-09-08 Perforation 380.10 380.60 13
2005-09-08 Perforation 373.00 373.50 13
2005-09-08 Perforation 316.90 317.40 13
2005-09-08 Perforation 268.60 269.10 13
2005-09-08 Perforation 253.80 254.30 13
2005-09-21 Fracture 253.80 691.60 0
1999-08-09 Packing Device Capped w/Cement 949.00 957.00 0
1999-08-09 Perforation 915.50 919.50 14
1999-09-08 Fracture 915.50 919.50 0
1999-10-17 Packing Device Capped w/Cement 904.00 912.00 0
1999-10-17 Perforation 771.00 775.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3665 0.0 0.0 0.0

For data sources see[5]

References