If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264283401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.257181,"lon":-113.820745,"icon":""}]} |
Location: 00/01-34-026-28W4/0 | |
Location Alias: 00/01-34-26-28 W4M | |
Location Alias 2: 00/01-34-026-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 28 | |
Section: 34 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 1-34-26-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0409522 | |
License Date: 2009-03-04 | |
License Status: Amended | |
Spud Date: 2009-11-23 | |
Final Drill Date: 2009-11-26 | |
Well Total Depth: 1205.00 m | |
Surface Hole Latitude: 51.257181 | |
Surface Hole Longitude: -113.820745 |
Date | Event |
---|---|
2009-03-04 | Obtained License |
2009-11-23 | Surface Casing Operation Performed |
2009-11-26 | Finished Drilling |
2009-11-26 | Production Casing Operation Performed |
2009-11-26 | Rig Released |
2009-11-26 | Well Mode changed to Drilled and Cased |
2009-12-02 | Well Log Performed |
2010-01-05 | Perforation Treatment Performed - Jet Perforation |
2010-01-23 | Well Fluid changed to Gas |
2010-01-23 | Well Mode changed to Testing |
2010-02-11 | Perforation Treatment Performed - Fractured |
2010-03-19 | Well Began Production |
2010-03-19 | Well Fluid changed to Gas |
2010-03-19 | Well Mode changed to Flowing |
2010-10-03 | Perforation Treatment Performed - Jet Perforation |
2010-10-07 | Perforation Treatment Performed - Fractured |
2010-10-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-10-14 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-05 | Perforation | 1152.00 | 1155.00 | 13 |
2010-10-03 | Perforation | 537.30 | 537.80 | 13 |
2010-10-03 | Perforation | 407.80 | 408.30 | 13 |
2010-10-03 | Perforation | 468.90 | 469.40 | 13 |
2010-10-03 | Perforation | 678.00 | 680.00 | 13 |
2010-10-03 | Perforation | 485.50 | 489.50 | 13 |
2010-10-03 | Perforation | 503.00 | 504.00 | 13 |
2010-10-03 | Perforation | 401.00 | 405.00 | 13 |
2010-10-03 | Perforation | 436.00 | 439.00 | 13 |
2010-10-03 | Perforation | 631.00 | 635.00 | 13 |
2010-10-03 | Perforation | 643.00 | 645.00 | 13 |
2010-01-05 | Perforation | 1093.00 | 1095.00 | 13 |
2010-10-03 | Perforation | 533.00 | 534.00 | 13 |
2010-10-03 | Perforation | 572.00 | 575.00 | 13 |
2010-10-03 | Perforation | 813.50 | 814.00 | 13 |
2010-10-03 | Perforation | 819.70 | 820.20 | 13 |
2010-10-03 | Perforation | 787.10 | 787.60 | 13 |
2010-10-03 | Perforation | 795.80 | 796.30 | 13 |
2010-10-03 | Perforation | 822.80 | 823.30 | 13 |
2010-10-03 | Perforation | 851.30 | 851.80 | 13 |
2010-10-03 | Perforation | 856.10 | 856.60 | 13 |
2010-10-03 | Perforation | 840.90 | 841.40 | 13 |
2010-01-05 | Perforation | 996.00 | 998.00 | 13 |
2010-10-03 | Perforation | 842.00 | 844.00 | 13 |
2010-10-03 | Perforation | 689.80 | 690.30 | 13 |
2010-10-03 | Perforation | 712.50 | 713.00 | 13 |
2010-10-03 | Perforation | 674.40 | 674.90 | 13 |
2010-10-03 | Perforation | 686.40 | 686.90 | 13 |
2010-10-03 | Perforation | 748.10 | 748.60 | 13 |
2010-10-03 | Perforation | 778.60 | 779.60 | 13 |
2010-10-03 | Perforation | 749.80 | 750.30 | 13 |
2010-10-03 | Perforation | 763.00 | 764.00 | 13 |
2010-10-07 | Fracture | 401.00 | 806.00 | 0 |
2010-02-11 | Fracture | 1093.00 | 1095.00 | 0 |
2010-10-07 | Fracture | 392.20 | 856.60 | 0 |
2010-10-03 | Perforation | 804.00 | 806.00 | 13 |
2010-10-03 | Perforation | 392.20 | 392.70 | 13 |
2010-10-03 | Perforation | 682.00 | 684.00 | 13 |
2010-10-03 | Perforation | 693.00 | 696.00 | 13 |
2010-10-03 | Perforation | 525.60 | 526.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 6828 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]