If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264283403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.266258,"lon":-113.833049,"icon":""}]} |
Location: 00/03-34-026-28W4/0 | |
Location Alias: 00/03-34-26-28 W4M | |
Location Alias 2: 00/03-34-026-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 28 | |
Section: 34 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 3-34-26-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410084 | |
License Date: 2009-04-09 | |
License Status: Amended | |
Spud Date: 2009-12-04 | |
Final Drill Date: 2009-12-06 | |
Well Total Depth: 1613.00 m | |
Surface Hole Latitude: 51.266258 | |
Surface Hole Longitude: -113.833049 |
Date | Event |
---|---|
2009-04-09 | Obtained License |
2009-12-04 | Direction Drilling Operation Performed - Deviate |
2009-12-04 | Surface Casing Operation Performed |
2009-12-06 | Finished Drilling |
2009-12-06 | Well Mode changed to Drilled and Cased |
2009-12-07 | Production Casing Operation Performed |
2009-12-07 | Rig Released |
2009-12-12 | Well Log Performed |
2010-01-20 | Perforation Treatment Performed - Jet Perforation |
2010-02-02 | Well Fluid changed to Gas |
2010-02-02 | Well Mode changed to Testing |
2010-02-17 | Well Began Production |
2010-02-17 | Well Fluid changed to Gas |
2010-02-17 | Well Mode changed to Flowing |
2011-10-26 | Perforation Treatment Performed - Jet Perforation |
2011-10-31 | Perforation Treatment Performed - Fractured |
2011-11-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-09 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-04 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-20 | Perforation | 1579.00 | 1581.00 | 13 |
2011-10-26 | Perforation | 734.30 | 734.80 | 13 |
2011-10-26 | Perforation | 745.00 | 747.00 | 13 |
2011-10-26 | Perforation | 764.30 | 764.80 | 13 |
2011-10-26 | Perforation | 909.00 | 911.00 | 13 |
2011-10-26 | Perforation | 924.10 | 924.60 | 13 |
2011-10-26 | Perforation | 928.90 | 929.40 | 13 |
2011-10-26 | Perforation | 960.10 | 960.60 | 13 |
2011-10-26 | Perforation | 1006.30 | 1006.80 | 13 |
2011-10-26 | Perforation | 1008.00 | 1008.50 | 13 |
2011-10-26 | Perforation | 1025.80 | 1026.80 | 13 |
2010-01-20 | Perforation | 1523.00 | 1524.00 | 13 |
2011-10-26 | Perforation | 1046.60 | 1048.60 | 13 |
2011-10-26 | Perforation | 1049.70 | 1050.20 | 13 |
2011-10-26 | Perforation | 1063.40 | 1063.90 | 13 |
2011-10-26 | Perforation | 1073.00 | 1073.50 | 13 |
2011-10-26 | Perforation | 1094.10 | 1095.10 | 13 |
2011-10-26 | Perforation | 1109.60 | 1110.10 | 13 |
2011-10-26 | Perforation | 1125.90 | 1126.40 | 13 |
2011-10-26 | Perforation | 1134.10 | 1137.10 | 13 |
2011-10-26 | Perforation | 1148.40 | 1148.90 | 13 |
2011-10-26 | Perforation | 1154.80 | 1155.30 | 13 |
2010-01-20 | Perforation | 1483.00 | 1484.00 | 13 |
2011-10-31 | Fracture | 561.50 | 1155.30 | 0 |
2011-10-26 | Perforation | 561.50 | 563.50 | 13 |
2011-10-26 | Perforation | 568.00 | 568.50 | 13 |
2011-10-26 | Perforation | 571.40 | 571.90 | 13 |
2011-10-26 | Perforation | 646.60 | 647.60 | 13 |
2011-10-26 | Perforation | 679.50 | 681.50 | 13 |
2011-10-26 | Perforation | 720.80 | 721.80 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7687 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[6]