X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265010208003

Well Details

Well ID: 0265010208003
Loading map...
Location: 00/08-02-026-01W5/3
Location Alias: 00/08-02-26-01 W5M
Location Alias 2: 00/08-02-026-01 W5/03
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 01
Section: 02
County/Municipality: Calgary
Well Name: BONAVISTA CROSS 8-2-26-1
Operator Name: Bonavista Energy Corporation
License Number: 0290884
License Date: 2003-08-01
License Status: Suspension
Spud Date: 2003-08-10
Final Drill Date: 2003-08-26
Well Total Depth: 2440.00 m
Surface Hole Latitude: 51.192520
Surface Hole Longitude: -114.016018

For data sources see[1][2]

Well History

Date Event
2003-08-01 Obtained License
2003-08-13 Surface Casing Operation Performed
2003-08-15 Direction Drilling Operation Performed - Deviate
2003-08-26 Finished Drilling
2003-08-26 Well Log Performed
2003-08-26 Well Mode changed to Drilled and Cased
2003-08-27 Production Casing Operation Performed
2003-08-28 Rig Released
2003-10-03 Perforation Treatment Performed - Jet Perforation
2003-10-03 Well Log Performed
2003-10-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-10-06 Perforation Treatment Performed - Jet Perforation
2003-10-07 Well Log Performed
2003-10-08 Perforation Treatment Performed - Fractured
2003-10-11 Well Log Performed
2015-07-09 Perforation Treatment Performed - Cement Plug
2015-07-09 Plug Back Performed
2015-08-19 Well Log Performed
2015-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-30 Perforation Treatment Performed - Jet Perforation
2015-09-30 Plug Back Performed
2015-10-02 Perforation Treatment Performed - Cement Plug
2015-10-02 Perforation Treatment Performed - Cement Squeeze
2015-10-02 Plug Back Performed
2016-06-06 Perforation Treatment Performed - Jet Perforation
2016-06-06 Well Log Performed
2016-06-07 Perforation Treatment Performed - Cement Plug
2016-06-07 Perforation Treatment Performed - Cement Squeeze
2016-06-07 Plug Back Performed
2016-06-08 Perforation Treatment Performed - Jet Perforation
2016-06-08 Well Log Performed
2016-06-09 Perforation Treatment Performed - Cement Plug
2016-06-09 Perforation Treatment Performed - Cement Squeeze
2016-06-09 Plug Back Performed
2016-06-09 Well Mode changed to Abandoned Zone
2016-11-15 Perforation Treatment Performed - Jet Perforation
2016-11-15 Well Log Performed
2016-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-17 Perforation Treatment Performed - Jet Perforation
2016-11-17 Plug Back Performed
2016-11-17 Well Log Performed
2016-11-18 Perforation Treatment Performed - Cement Squeeze
2016-11-19 Perforation Treatment Performed - Jet Perforation
2016-11-19 Well Log Performed
2016-11-21 Perforation Treatment Performed - Cement Squeeze
2016-11-22 Well Log Performed
2019-09-05 Perforation Treatment Performed - Jet Perforation
2019-09-06 Perforation Treatment Performed - Cement Plug
2019-09-06 Perforation Treatment Performed - Cement Squeeze
2019-09-06 Plug Back Performed
2019-09-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-08-15 475.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-10-03 Perforation 2419.50 2425.00 17
2015-10-02 Cement Plug 1054.30 1082.80 0
2016-06-06 Perforation 826.00 828.00 20
2016-06-07 Cement Squeeze 826.00 828.00 0
2016-06-07 Cement Plug 811.00 821.00 0
2016-06-08 Perforation 779.00 781.00 17
2016-06-09 Cement Squeeze 779.00 781.00 0
2016-06-09 Cement Plug 767.00 771.60 0
2016-11-15 Perforation 748.00 750.00 18
2016-11-17 Packing Device Capped w/Cement 735.00 743.00 0
2016-11-17 Perforation 573.50 575.50 20
2003-10-05 Bridge Plug, No Cement 2416.50 2417.50 0
2016-11-18 Cement Squeeze 573.50 575.50 0
2016-11-19 Perforation 463.00 465.00 20
2016-11-21 Cement Squeeze 463.00 465.00 0
2019-09-05 Perforation 454.00 456.00 20
2019-09-06 Cement Squeeze 454.00 456.00 0
2019-09-06 Cement Plug 442.00 450.00 0
2003-10-06 Perforation 2402.00 2405.00 17
2003-10-08 Fracture 2402.00 2405.00 0
2015-07-09 Cement Plug 2379.70 2393.70 0
2015-09-30 Packing Device Capped w/Cement 1416.50 1425.00 0
2015-09-30 Perforation 1086.00 1089.00 17
2015-10-02 Cement Squeeze 1086.00 1089.00 0
2015-10-02 Cement Plug 1083.00 1089.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-06 No Incident Encountered 0.00 0.00
2015-07-09 No Incident Encountered 0.00 0.00
2015-10-07 No Incident Encountered 0.00 0.00
2016-11-23 No Incident Encountered 0.00 0.00
2019-09-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References