If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265013307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.262272,"lon":-114.078163,"icon":""}]} |
Location: 00/07-33-026-01W5/0 | |
Location Alias: 00/07-33-26-01 W5M | |
Location Alias 2: 00/07-33-026-01 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 01 | |
Section: 33 | |
County/Municipality: Rocky View County | |
Well Name: BVX ET AL CROSSFIELD 7-33-26-1 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0047077 | |
License Date: 1973-08-30 | |
License Status: RecCertified | |
Spud Date: 1973-09-12 | |
Final Drill Date: 1973-10-10 | |
Well Total Depth: 2475.00 m | |
Surface Hole Latitude: 51.262272 | |
Surface Hole Longitude: -114.078163 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-08-30 | Obtained License |
1973-10-10 | Finished Drilling |
1973-10-12 | Drill Stem Test Performed |
1973-10-13 | Production Casing Operation Performed |
1973-10-23 | Perforation Treatment Performed - Jet Perforation |
1973-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-10-29 | Perforation Treatment Performed - Jet Perforation |
1973-10-31 | Perforation Treatment Performed - Cement Squeeze |
1973-11-02 | Perforation Treatment Performed - Jet Perforation |
1973-11-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-11-07 | Well Mode changed to Drilled and Cased |
1979-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-05-30 | Well Abandoned |
1979-05-30 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-10-23 | Perforation | 2425.00 | 2429.90 | 7 |
1973-10-24 | Acid Treatment | 2425.00 | 2429.90 | 0 |
1973-10-29 | Perforation | 2414.60 | 2415.80 | 7 |
1973-10-31 | Cement Squeeze | 2414.60 | 2415.80 | 0 |
1973-11-02 | Perforation | 2407.90 | 2409.70 | 7 |
1973-11-03 | Acid Treatment | 2407.90 | 2409.70 | 0 |
1979-05-30 | Packing Device Capped w/Cement | 2390.80 | 2398.80 | 0 |
For data sources see[4]