X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0265023606000

Well Details

Well ID: 0265023606000
Loading map...
Location: 00/06-36-026-02W5/0
Location Alias: 00/06-36-26-02 W5M
Location Alias 2: 00/06-36-026-02 W5/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 5
Range: 02
Section: 36
County/Municipality: Rocky View County
Well Name: KXL HZ CROSS 6-36-26-2
Operator Name: Kaiser Exploration Ltd.
License Number: 0432762
License Date: 2011-04-05
License Status: Abandoned
Spud Date: 2011-05-10
Final Drill Date: 2011-05-27
Well Total Depth: 4089.00 m
Surface Hole Latitude: 51.277240
Surface Hole Longitude: -114.159021

For data sources see[1][2]

Well History

Date Event
2011-04-05 Obtained License
2011-05-13 Surface Casing Operation Performed
2011-05-17 Direction Drilling Operation Performed - Deviate
2011-05-20 Direction Drilling Operation Performed - Horizontal
2011-05-27 Finished Drilling
2011-05-27 Well Mode changed to Drilled and Cased
2011-05-28 Well Log Performed
2011-05-30 Production Casing Operation Performed
2011-05-30 Rig Released
2011-08-28 Production Casing Operation Performed
2011-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-02 Well Began Production
2012-02-02 Well Fluid changed to Crude Oil
2012-02-02 Well Mode changed to Pumping
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Suspended
2018-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-20 Plug Back Performed
2018-11-20 Well Fluid changed to Crude Oil
2018-11-20 Well Log Performed
2018-11-20 Well Mode changed to Abandoned Zone
2018-11-27 Well Fluid changed to Crude Oil
2018-11-27 Well Mode changed to Abandoned
2018-12-01 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-05-17 1979.50 Deviate (5 - 79 degrees)
2011-05-20 2256.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-25 Multi-Stage Fracture 4065.00 4065.10 0
2011-10-15 Multi-Stage Fracture 3696.00 3697.00 0
2011-10-15 Multi-Stage Fracture 3663.50 3664.50 0
2011-10-15 Multi-Stage Fracture 3626.00 3627.00 0
2011-10-17 Multi-Stage Fracture 3601.00 3602.00 0
2011-10-17 Multi-Stage Fracture 3576.00 3577.00 0
2011-10-17 Multi-Stage Fracture 3551.00 3552.00 0
2011-11-10 Multi-Stage Fracture 3458.50 3459.50 0
2011-11-10 Multi-Stage Fracture 3501.00 3502.00 0
2011-11-10 Multi-Stage Fracture 3523.00 3524.00 0
2011-11-10 Multi-Stage Fracture 3538.00 3539.00 0
2011-09-25 Multi-Stage Fracture 3961.50 3961.60 0
2011-11-11 Multi-Stage Fracture 3403.90 3404.90 0
2011-11-11 Multi-Stage Fracture 3383.90 3384.90 0
2011-11-11 Multi-Stage Fracture 3357.40 3358.40 0
2011-11-12 Multi-Stage Fracture 3327.00 3328.00 0
2011-11-12 Multi-Stage Fracture 3292.00 3293.00 0
2011-11-12 Multi-Stage Fracture 3268.00 3269.00 0
2011-11-14 Multi-Stage Fracture 3238.00 3239.00 0
2011-11-14 Multi-Stage Fracture 3183.50 3184.50 0
2011-11-14 Multi-Stage Fracture 3163.00 3164.00 0
2011-11-15 Multi-Stage Fracture 3115.00 3116.00 0
2011-09-25 Multi-Stage Fracture 3987.00 3987.10 0
2011-11-15 Multi-Stage Fracture 3083.50 3084.50 0
2011-11-15 Multi-Stage Fracture 3049.50 3050.50 0
2011-11-15 Multi-Stage Fracture 3144.00 3145.00 0
2011-11-16 Multi-Stage Fracture 2992.00 2993.00 0
2011-11-16 Multi-Stage Fracture 2969.00 2970.00 0
2011-11-16 Multi-Stage Fracture 2946.00 2947.00 0
2011-11-17 Multi-Stage Fracture 2939.00 2940.00 0
2011-11-17 Multi-Stage Fracture 2909.00 2910.00 0
2011-11-17 Multi-Stage Fracture 2879.00 2880.00 0
2011-11-17 Multi-Stage Fracture 2849.00 2850.00 0
2011-09-25 Multi-Stage Fracture 3973.00 3973.10 0
2018-11-20 Packing Device Capped w/Cement 2160.60 2179.00 0
2011-09-26 Multi-Stage Fracture 3893.00 3893.10 0
2011-09-26 Multi-Stage Fracture 3786.00 3786.10 0
2011-09-28 Multi-Stage Fracture 3756.00 3757.00 0
2011-09-28 Multi-Stage Fracture 3736.00 3737.00 0
2011-09-28 Multi-Stage Fracture 3716.00 3717.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7276 0.0 0.0 0.0
2013 8364 0.0 0.0 0.0
2014 6048 0.0 0.0 0.0
2015 5832 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References