If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265023606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.27724,"lon":-114.159021,"icon":""}]} |
Location: 00/06-36-026-02W5/0 | |
Location Alias: 00/06-36-26-02 W5M | |
Location Alias 2: 00/06-36-026-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 02 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: KXL HZ CROSS 6-36-26-2 | |
Operator Name: Kaiser Exploration Ltd. | |
License Number: 0432762 | |
License Date: 2011-04-05 | |
License Status: Abandoned | |
Spud Date: 2011-05-10 | |
Final Drill Date: 2011-05-27 | |
Well Total Depth: 4089.00 m | |
Surface Hole Latitude: 51.277240 | |
Surface Hole Longitude: -114.159021 |
Date | Event |
---|---|
2011-04-05 | Obtained License |
2011-05-13 | Surface Casing Operation Performed |
2011-05-17 | Direction Drilling Operation Performed - Deviate |
2011-05-20 | Direction Drilling Operation Performed - Horizontal |
2011-05-27 | Finished Drilling |
2011-05-27 | Well Mode changed to Drilled and Cased |
2011-05-28 | Well Log Performed |
2011-05-30 | Production Casing Operation Performed |
2011-05-30 | Rig Released |
2011-08-28 | Production Casing Operation Performed |
2011-09-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-02 | Well Began Production |
2012-02-02 | Well Fluid changed to Crude Oil |
2012-02-02 | Well Mode changed to Pumping |
2015-10-01 | Well Fluid changed to Crude Oil |
2015-10-01 | Well Mode changed to Suspended |
2018-11-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-20 | Plug Back Performed |
2018-11-20 | Well Fluid changed to Crude Oil |
2018-11-20 | Well Log Performed |
2018-11-20 | Well Mode changed to Abandoned Zone |
2018-11-27 | Well Fluid changed to Crude Oil |
2018-11-27 | Well Mode changed to Abandoned |
2018-12-01 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-05-17 | 1979.50 | Deviate (5 - 79 degrees) |
2011-05-20 | 2256.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-25 | Multi-Stage Fracture | 4065.00 | 4065.10 | 0 |
2011-10-15 | Multi-Stage Fracture | 3696.00 | 3697.00 | 0 |
2011-10-15 | Multi-Stage Fracture | 3663.50 | 3664.50 | 0 |
2011-10-15 | Multi-Stage Fracture | 3626.00 | 3627.00 | 0 |
2011-10-17 | Multi-Stage Fracture | 3601.00 | 3602.00 | 0 |
2011-10-17 | Multi-Stage Fracture | 3576.00 | 3577.00 | 0 |
2011-10-17 | Multi-Stage Fracture | 3551.00 | 3552.00 | 0 |
2011-11-10 | Multi-Stage Fracture | 3458.50 | 3459.50 | 0 |
2011-11-10 | Multi-Stage Fracture | 3501.00 | 3502.00 | 0 |
2011-11-10 | Multi-Stage Fracture | 3523.00 | 3524.00 | 0 |
2011-11-10 | Multi-Stage Fracture | 3538.00 | 3539.00 | 0 |
2011-09-25 | Multi-Stage Fracture | 3961.50 | 3961.60 | 0 |
2011-11-11 | Multi-Stage Fracture | 3403.90 | 3404.90 | 0 |
2011-11-11 | Multi-Stage Fracture | 3383.90 | 3384.90 | 0 |
2011-11-11 | Multi-Stage Fracture | 3357.40 | 3358.40 | 0 |
2011-11-12 | Multi-Stage Fracture | 3327.00 | 3328.00 | 0 |
2011-11-12 | Multi-Stage Fracture | 3292.00 | 3293.00 | 0 |
2011-11-12 | Multi-Stage Fracture | 3268.00 | 3269.00 | 0 |
2011-11-14 | Multi-Stage Fracture | 3238.00 | 3239.00 | 0 |
2011-11-14 | Multi-Stage Fracture | 3183.50 | 3184.50 | 0 |
2011-11-14 | Multi-Stage Fracture | 3163.00 | 3164.00 | 0 |
2011-11-15 | Multi-Stage Fracture | 3115.00 | 3116.00 | 0 |
2011-09-25 | Multi-Stage Fracture | 3987.00 | 3987.10 | 0 |
2011-11-15 | Multi-Stage Fracture | 3083.50 | 3084.50 | 0 |
2011-11-15 | Multi-Stage Fracture | 3049.50 | 3050.50 | 0 |
2011-11-15 | Multi-Stage Fracture | 3144.00 | 3145.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 2992.00 | 2993.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 2969.00 | 2970.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 2946.00 | 2947.00 | 0 |
2011-11-17 | Multi-Stage Fracture | 2939.00 | 2940.00 | 0 |
2011-11-17 | Multi-Stage Fracture | 2909.00 | 2910.00 | 0 |
2011-11-17 | Multi-Stage Fracture | 2879.00 | 2880.00 | 0 |
2011-11-17 | Multi-Stage Fracture | 2849.00 | 2850.00 | 0 |
2011-09-25 | Multi-Stage Fracture | 3973.00 | 3973.10 | 0 |
2018-11-20 | Packing Device Capped w/Cement | 2160.60 | 2179.00 | 0 |
2011-09-26 | Multi-Stage Fracture | 3893.00 | 3893.10 | 0 |
2011-09-26 | Multi-Stage Fracture | 3786.00 | 3786.10 | 0 |
2011-09-28 | Multi-Stage Fracture | 3756.00 | 3757.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 3736.00 | 3737.00 | 0 |
2011-09-28 | Multi-Stage Fracture | 3716.00 | 3717.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7276 | 0.0 | 0.0 | 0.0 |
2013 | 8364 | 0.0 | 0.0 | 0.0 |
2014 | 6048 | 0.0 | 0.0 | 0.0 |
2015 | 5832 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-11-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]